• No results found

SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please us at

N/A
N/A
Protected

Academic year: 2022

Share "SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please us at"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

(1)

Order #XXXXX VK-3006 - 10’ x 30’ Inline Display

Plan View 10’

30’

(2)

Order #XXXXX General Information

DO NOT USE POWER TOOLS

ALL CONNECTIONS MUST BE TIGHTLY SECURED

Part Identification - Numbering

Spline Connection Base Plate & Extrusion Connection

General Setup Instructions

- Read entire setup instruction manual prior to unpacking parts and pieces.

- The setup instructions are created specifically for this configuration.

- Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.

WARNING

Cleaning & Packing

- For Cleaning Metal, Plex, & Laminate Parts:

Use a MILD NON-ABRASIVE cleanser and soft cloth/paper towel to clean all surfaces.

- Keep exhibit components away from heat and prolonged sun exposure.

Heat and UV exposure will warp and fade components.

- Retain all provided Packing Materials.

All provided packing materials are for

ease of repacking & component protection.

Disassembly

- For loss prevention, tighten all setscrews and locks during disassembly

7A

Hex Tool - Essential for Assembly

Extrusion & Lock Connection Engaged Lock

LADDERS OR LIFTS

MAY BE REQUIRED

(3)

Order #XXXXX Closet Assembly

When assembled

Top View

PR37 S44

Velcro

Steps:

1) Connect PR37 to verticals [4,7], as shown.

Note: PR37 should remain attached to verticals during disassembly.

2) Attach lower horizontals [12,14,15] & Door Threshold between verticals [4,5,6,7,8,9,10,11] as shown, &

connect horizontal [13] between verticals [4,11].

See Door Threshold Attachment detail.

3) Slide Infills between verticals; secure with upper horizontals [12A,13A,14A,15A].

* *

Item4 5,6,7 8,9,10 12/12A11 13/13A 14/14A 15/15A

----

Qty.1 1,1,1 1,1,1 3/31 1/11/1 3/31 2

Description

96”h S44 Vertical Extrusion w/ Door Stop 96”h S44 Vertical Extrusion

96”h S44 Vertical Extrusion

96”h S44 Vertical Extrusion w/ Door Hinge 22.126”w Z45 Horizontal Extrusion

22.5”w Z45 Horizontal Extrusion 22.5”w Z45 Horizontal Extrusion 22.126”w Z45 Horizontal Extrusion Door Threshold

92.4”h PR37 Vertical Extrusion

4 5 6 7

9 8 11 10

12A

15A 15A 15A

13 13A

14 12A 14A

12A

12 15

ThresholdDoor 15

15

12 12

Infill Infill

Infill

Infill Infill Infill

Infill

Infill

Slide PR37 extrusion into groove of vertical and tighten set screw to secure in place.

PR37Extrusion Profile

Velcro

Door Threshold

Tighten setscrew to secure Slide Connector

into Groove of Extrusion

Door Threshold Attachment

*

Top View

S44 PR37

Velcro

(4)

Order #XXXXX Closet Attachments

Caps

Monitor Mount Steps:

1) Install Door to Vertical [11]. See Door Attachment detail.

2) Attach Monitor Mount to Verticals [9,10].

See Monitor Mount Attachment detail.

3) Connect Header Graphic to Verticals [8,9,10,11] using screw caps. See Header Attachment detail.

DoorHinge

Hinge

Slide pin into hinge attached to vertical.

Slide door hinge over pin.

Door Attachment

*

Pin

*

Monitor Mount Attachment

Bolt

Monitor Mount

Stand-Off Barrel

ConnectorsV4

Attach Monitor Mount to V4 Connectors using bolts.

Slide V4 Connections into vertical channel of extrusions. Tighten set screw to secure.

Graphic V4 Connector

Slide V4 connector into groove. Tighten set screw to secure V4. Insert screw cap through hole of graphic & into V4 connector.

Tighten screw cap to secure in place.

Header Attachment

Screw Cap

*

Header Grap hic

Door

* *

* * * *

* * * *

*

*

11

10

9 8

(5)

Order #XXXXX Left Backwall Assembly

4

When assembled Item1

162 17/17A 18/18A

--

Qty.1 11 1/11/1

3

Description Boomerang Foot

96”h S44 Vertical Extrusion 96”h S44 Vertical Extrusion 40”w Z45 Horizontal Extrusion 96” Z45 curved Horizontal Extrusion 92.4”h PR37 Vertical Extrusion

Steps:

1) Connect PR37 to verticals [2,16], as shown.

Note: PR37 should remain attached to verticals during disassembly.

2) Attach Boomerang Foot [1] to vertical [2].

See Boomerang Foot Attachment detail.

3) Attach horizontals [17,17A,18,18A] between verticals [4,16,2] as shown.

4) Apply fabric graphic to back side of frame assembly, using Velcro.

Slide PR37 extrusion into groove of vertical and tighten set screw to secure in place.

ExtrusionPR37 Profile

Velcro

Boomerang Foot Attachment

Bolt screwset

Foot

Vertical

*

Attach foot with Bolts.

Slide V4 Connectors into groove of vertical extrusion & tighten set screw to secure.

V4

1

16

2

17 17A 18A

*

18

Attach graphic to velcro on back of

assembled frame

Top View

S44 PR37 PR37

Velcro Velcro

Top View

S44 PR37

Velcro

(6)

Order #XXXXX Right Backwall Assembly

7

When assembled Item1

2A19 20/20A 21/21A

--

Qty.1 11 1/11/1

3

Description Boomerang Foot

96”h S44 Vertical Extrusion 96”h S44 Vertical Extrusion 40”w Z45 Horizontal Extrusion 96” Z45 curved Horizontal Extrusion 92.4”h PR37 Vertical Extrusion

Steps:

1) Connect PR37 to verticals [2A,19], as shown.

Note: PR37 should remain attached to verticals during disassembly.

2) Attach Boomerang Foot [1] to vertical [2A].

See Boomerang Foot Attachment detail.

3) Attach horizontals [20,20A,21,21A] between verticals [7,19,2A] as shown.

4) Apply fabric graphic to back side of frame assembly, using Velcro.

Slide PR37 extrusion into groove of vertical and tighten set screw to secure in place.

ExtrusionPR37 Profile

Velcro

Boomerang Foot Attachment

Bolt screwset

Foot

Vertical

*

Attach foot with Bolts.

Slide V4 Connectors into groove of vertical extrusion & tighten set screw to secure.

V4

1 19

2A

20

21A 20A

21

*

Attach graphic to velcro on back of

assembled frame

Top View

S44 PR37 PR37

Velcro Velcro

Top View

PR37 S44

Velcro

(7)

Order #XXXXX Left Aero Ring Assembly

Connections are made by holding the button down and sliding the red tube into opposing tube until the connection is made. To disassemble push button and pull or twist extrusions apart.

Push-Button

Push-Button

6 6

6 6 Numbered Label

Using Your Setup Instructions

The Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit.

Connections are kept very simple: no tools. Everything assembles with push-button connectors and pre-connected horizontal sections.

Cleaning and Packing Your Display

1) Use care when cleaning aluminum extrusion or acrylic inserts. Use only non-abrasive cleaners.

2) Retain all packing material. It will make re-packing much easier and will reduce the likelihood of shipping damage.

2 14 13

11

12

153

10 16 918 17 4

5 20 19

8

7 6

When assembled Steps:

1) Assemble Aero frame parts together in numerical order, as shown.

2) Attach pillowcase graphic to assembled frame.

(8)

Order #XXXXX Right Aero Ring Assembly

Connections are made by holding the button down and sliding the red tube into opposing tube until the connection is made. To disassemble push button and pull or twist extrusions apart.

Push-Button

Push-Button

6 6

6 6 Numbered Label

Using Your Setup Instructions

The Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit.

Connections are kept very simple: no tools. Everything assembles with push-button connectors and pre-connected horizontal sections.

Cleaning and Packing Your Display

1) Use care when cleaning aluminum extrusion or acrylic inserts. Use only non-abrasive cleaners.

2) Retain all packing material. It will make re-packing much easier and will reduce the likelihood of shipping damage.

1 2

14 13 11

12

153

10 16 918 17 4

5 20 19

8

7 6

Steps:

1) Assemble Aero frame parts together in numerical order, as shown.

2) Attach pillowcase graphic to assembled frame.

When assembled

(9)

Order #XXXXX Workstation Assembly

When assembled Item1

23 45 67 9/9A/9B8

10/10A 11/11A

12

Qty.4 44 44 44 4/4/44

4/44/4 4

Description

66”h S40 Vertical Extrusion 66”h S40 Vertical Extrusion

36”h S40 Vertical Extrusion w/ Door Hinge 36”h S40 Vertical Extrusion w/ Door Stop 40.975” S40 curved Vertical Extrusion 40.975” S40 curved Vertical Extrusion

5.24”w Z32 Horizontal Extrusion w/ mitred end 5.24”w Z32 Horizontal Extrusion w/ mitred end 18.5”w S40 Horizontal Extrusion

18.5”w S40 Horizontal Extrusion 18.5”w S40 Horizontal Extrusion 21.02” x 4.5” Mounting Plate

Steps:

1) Connect curved extrusions [5,6] between verticals [1,2,3,4] using horizontals [7,8].

2) Attach lower horizontal [9] between

verticals [1,2]; connect lower horizontal [10]

between verticals [3,4].

3) Attach Door between verticals [3,4].

See Door Attachment detail.

4) Slide lower infills between verticals &

curved extrusions as shown; secure with horizontals [9A,10A,11,11A].

5) Place Shelf inside assembly.

6) Place Counter Top onto assembly, sliding over verticals [1,2].

7) Slide upper infill between verticals [1,2];

secure with upper horizontal [9B].

8) Attach Mountng Plate [12] to verticals [1,2];

& install Monitor Mount. See Monitor Mount Attachment detail.

Repeat steps 1 thorugh 8 for other three workstations.

QTY 4

9A 11 10A 1 11A

2

3

4

5 7

8

9

10 6

Infill Infill

Infill

Shelf Counter

Top

Door

DoorHinge

Hinge

Slide pin into hinge attached to vertical.

Slide door hinge over pin.

Door Attachment

*

Pin

Then attach wall plate to plate

using bolts and wing nuts Install V4 connectors to verticals;

secure with setscrew. Attach mounting plate to connectors.

Monitor Mount Attachment

connectorsV4

*

*

*

Infill 9B

*

12 MonitorMount

infill S10

S10 Extrusion Attached to Counter Top

(10)

Order #XXXXX Workstation to Aero Ring Connection

* *

Slide V4 connectors into groove of horizontal extrusion. Tighten set screws to secure V4 in place.

Attach bracket to V4 using bolt.

When assembled

Custom Bracket Connection

V4 bolt

screwset

Bracket

S40 Extrusion

Aero Frame

Steps:

1) Slide assembled Kiosks over Aero frame.

2) Connect Aero Frame to Kiosks using custom bracket.

See Custom Bracket Connection detail.

Repeat steps 1 & 2 for other Aero Frame.

**

*

QTY 2

(11)

Order #XXXXX Reception Counter - Assembly

When assembled (Front View) Steps:

1) Connect lower Horizontals [5,6] between Verticals [1,2,3,4].

2) Attach Vertical [7] to lower Horizontal [6].

3) Slide Infills between Verticals [1,2] [2,3] and [3,4].

4) Connect Horizontal [6A] between Verticals [2,3].

5) Place Infill on top of Horizontal [6A].

6) Connect assembled Counter frame to Floor.

7) Connect Doors to Vertical Extrusions [1] & [4].

See Door Attachment detail.

8) Connect upper Horizontals [5A] & [6B] between Verticals and on top of Infills and Doors.

Item1 23 5/5A4 6/6A/6B

7

Qty.1 11 2/21 2/1/2

1

Description

37.5”h Vertical Extrusion 37.5”h Vertical Extrusion 37.5”h Vertical Extrusion 37.5”h Vertical Extrusion 18.5”w Horizontal Extrusion 46”w Horizontal Extrusion 33.917”h Vertical Extrusion

1

5

6 5

6 2

3 4

Back View

Shelf

Shelf Support

Shelf Support Shelf Support Shelf Support

DoorHinge

Hinge

Slide pin into hinge attached to vertical.

Slide door hinge over pin.

Door Attachment

*

Pin

7

6A HingeHinge

HingeHinge

Back View

Infill

Infill Infill

Infill

*

*

*

*

5A

5A 6B

6B

Door Door

Back View

(12)

Order #XXXXX

Connections are made by holding the button down and sliding the red tube into opposing tube until the connection is made. To disassemble push button and pull or twist extrusions apart.

Push-Button

Push-Button

6 6

6 6 Numbered Label

Using Your Setup Instructions

The Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit.

Connections are kept very simple: no tools. Everything assembles with push-button connectors and pre-connected horizontal sections.

Cleaning and Packing Your Display

1) Use care when cleaning aluminum extrusion or acrylic inserts. Use only non-abrasive cleaners.

2) Retain all packing material. It will make re-packing much easier and will reduce the likelihood of shipping damage.

Reception Counter - Aero Frame

Steps:

1) Connect Aero frame parts in alphabetical order as shown.

2) Apply pillowcase graphic to each frame.

A

C

D

E

G H

F B

(13)

Order #XXXXX Reception Counter - Attachments

3

2 Steps:

1) Slide Aero Frame assemblies into the groove of front Verticals [2] & [3].

2) Attach front Sintra graphic to Verticals [2,3], using Velcro.

3) Place Counter Top on top of assembled Base.

See Counter Top Attachment detail.

Front View

Counter Top

Sintra Graphic

Completed Assembly

Align hole with pin Rotate pin. Spring will push pin into hole.

Counter Top Attachment

1 2

*

Hole Pin

* *

(14)

Order #XXXXX iPad Kiosk

QTY 2

assembledWhen HexNuts

Steps:

1) Attach base to curved stand, using bolts.

2) Attach square plate to stand, using bolts.

NOTE: Square plate must rotate to left and right before installing clamshell.

3) Attach clamshell to square plate using hex nuts.

4) Insert iPad and feed wire through hole as shown in detail.

Clamshell

Stand

Tools Required:

1) Hex Tool 2) Pliers Rotate clamshell to turn Tablet from portrait

to landscape orientation

TOP

WireAccess iPad

Lock

Lock

Foam Lining

Removed Home Button Shield

Optional Cover for Home Button

1) Remove foam lining from inside bottom of Clamshell.

2) Attach Home Button Shield with double-sided tape to inside of Clamshell, keeping top of shield flush with Clamshell opening.

NOTE: This is a permanent fix and can’t be easily removed.

Wire Management for iPad

Attach iPad Cord to supplied USB Extension Cord.

Feed USB Cord through top hole of Post, then out bottom hole of Post. Connect to Power.

References

Related documents