Temperature Control have been involved in providing specialist services to data centres for over 20 years, starting from providing specialist close control cooling to full Turnkey M&E projects. The majority of our experience has been gained in a close working partnership with British Telecom and part of their 21st Century Network Upgrade (21CN).

This experience has enabled us to offer design and build solutions to many clients as well as continuing our relationship with BT.

EXAMPLE OF A

DATA CENTRE BUILD

BT Harmondsworth Data Centre

Hall 2 Upgrade

GENERATOR

BT Derby Computer Centre

Project Type

Refurbishment on live data centre Project Description

Removal of existing LV Switchgear, UPS and Generator PLC system and replace with Static Transfer Switches plus associated UPS Output Panel extensions and BMS modifications and general construction works.

Date of Project January – July 2011 Project Budgets £1,400,000.00

RAF Croughton

Project Type

Full Data Centre with M&E services Project Description

Building 30 – Full replacement of all M&E services to a live data centre. Scaffold decking was installed at high level to protect the data centre and temporary cooling utilised to maintain critical operation throughout the refurbishment.

Building 180 – installation of new CRAC systems and chillers to data centre. Existing chillers were retained in N+1 operation and BMS package provided to allow automatic operation to all items of plant.

Date of Project

January 2009 – November 2010 Project Budgets

(2)

Project Type

Full Data Centre with M&E services Project Description

Installation and commissioning of new 1500kva HV supply, HV panel extension, transformer, LV Panel, UPS Input and Output Panels, UPS module, CCU’s, HVAC Panels, Generators, gantry extensions, associated BMS, F/A, Door Access to Data Centre

Media Hall refurbishment including small power, lighting, new suspended ceiling, raised floor tile installation and general construction works.

Date of Project

March – November 2009 Project Budgets £3,000,000.00

Project Type

Full Data Centre with M&E services Project Description

Installation and commissioning of 2 No 2000kva HV supplies, HV panel extension, transformers, LV Panels, UPS Input and Output Panels, UPS modules, Generators, HVAC Panels, CCU’s, gantry extensions, BMS, F/A, Door Access.

Media Hall refurbishment including small power, lighting, suspended ceiling, raised floor installation etc and general construction works.

Date of Project January – December 2006

BT Harmondsworth

Computer Centre

BT Harmondsworth

Computer Centre

(3)

LV SWITCH ROOM

Project Type

Full Data Centre with M&E services Project Description

Installation and commissioning of new 1500kva HV supply, HV panel extension, transformer, LV Panel, UPS Input and Output Panels, UPS module, CCU’s, HVAC Panels, Generators, gantry extensions, associated BMS, F/A, Door Access to Data Centre.

Media Hall refurbishment including small power, lighting, new suspended ceiling, raised floor tile installation and general construction works.

Date of Project

January – November 2005 Project Budgets

£3,000,000.00

Project Type

Full mechanical services Project Description

Supply and Installation of 4 No DX CRAC systems to cold aisle contained racks.

New company started by ex UK Grid directors and have been appointed as specialist cooling provider.

Phase 2 is installation of 4 No CRAC units to the UPS Room, 16 No chilled water CRAC systems and 3 No 450kW free cooling chillers.

Date of Project

January 2012 – January 2013 (estimated)

BT St Albans Computer Centre

London Data Exchange

Brent Cross

(4)

LV SWITCH ROOM

PLANT ROOM

Project Type

Refurbishment of live Data Centre with M&E services Project Description

Removal and replacement of existing chiller / condensers inclusive of new HVAC panel, sub mains cabling,

switchboard modifications, BMS, small power, civil engineering and general construction works. Date of Project

March 2012 – June 2012 Project Budgets £500,000.00

Project Type

Refurbishment of live Data Centre with mechanical services

Project Description

Removal of R22 refrigerant in 11 No CRAC units in critical live data centre. We introduced a new ISCEON MO99, R22 refrigerant replacement to BT and conducted the first live trails of MO99 in this application in Europe. Working closely with DuPont, the refrigerant

manufacturers, the equipment was fully tested before and after the conversion and the results showed conclusive proof of a successful conversion. Once satisfied BT released 10 No CRAC systems all completed in a 3 week window without any downtime of the data centre. The trial was showcased at the Air Conditioning & Refrigeration Show at the Birmingham NEC (March 2012) and will be used as a test case to encourage use throughout the industry.

Date of Project

February – March 2012

BT Bletchley

BT Harmondsworth

Computer Centre

(5)

PLANT ROOM

Project Type

Refurbishment of live Data Centre with mechanical services

Project Description

Removal and replacement of 3 No Denco CRAC units inclusive of modifications to BMS, Vesda and additional free cooling pipework to Computer Hall 5.

Date of Project

October – December 2011 Project Budgets

£170,000.00

Project Type

Full mechanical services Project Description

Installation and commissioning of 23 No Airedale new 45kW to 120kW CRAC units within halls 1,2 3 & 4 over a three year development period.

Equipment designed to work with cold aisle containment by use of inverter fans on the CRAC units.

Date of Project Between 2008 – 2011 Project Budgets £400,000.00

BT Derby Computer Centre

(6)

PLANT ROOM

ROOF ROOM

Project Type

Design, installation and commissioning of mechanical services

Project Description

Installation and commissioning of 3 No 85kW Airedale Free Cool Chillers to serve the APC InRow Rack Cooling Solution, with Airedale Down Flow units securing the UPS room, specialist underfloor leak detection and fault alarm panel interface system.

During load test at 11DC ambient system achieved, a PUE of 1.2 based (241kW room load, 45kW energy input). Date of Project

December - February 2010 Project Budgets

£200,000.00

Project Type

Refurbishment of live Data Centre with mechanical services

Project Description

Strip out and replacement of 2 No 100kW chillers serving Data suite. Data suite remained operational at all times and chilled water circuits were modified whilst

maintaining water flow.

Each chiller was replaced individually, tested and commissioned before removal of the other. Equipment was configured into run and standby.

Date of Project May – July 2010

Confidential Client, Great Yarmouth

British Energy

(7)

Project Type

Refurbishment of live Data Centre with M&E services Project Description

Installation of 2 No new Hitachi chiller units, condensers, HVAC panels, associated BMS and new Reverse Osmosis installation to existing AHU’s and general construction works. Date of Project February – May 2010 Project Budgets £750,000.00 Project Type

Installation and commissioning of mechanical services Project Description

Installation and commissioning of 4 No Airedale 120kW CRAC units to data suite serving cold aisle containment and hot aisle return through extended plenums.

Installation and commissioning of fire suppression extract ventilation system with BMS interface.

Installation of 1st phase chilled water pipework through data suite to serve future chiller and ‘On Rak’ rear door coolers.

Date of Project

December – February 2010 Project Budgets

£65,000.00

BT St Albans Computer Centre

(8)

UPS ROOM

Project Type

Design, installation and commissioning of mechanical services

Project Description

Installation and commissioning of 3 No 80kW Aquasnap Liquid Chillers to serve the APC InRow Cooling Solution and Airedale chilled water down flow units. Along with a specialist underfloor water leak detection system and fault alarm panel interface system.

Pipework method used was George Fischer COOL-FIT pre-insulated ABS.

Date of Project

June – August 2009 Project Type

Installation and commissioning of mechanical services Project Description

Supply and installation of Eaton Williams rear door rack cooling systems to high density blade server cabinets. The specialist cooling systems used free cooling chilled water to provide temperature neutrality across the servers and provide a low energy cooling solution to High Density 30kW Racks.

The energy savings achieved from these systems was 39% less than a traditional chilled water system with pay backs of the additional costs achieved within 8 months. Date of Project

October – November 2009 Project Budgets

£195,000.00

Confidential Client, Bristol

EMIS, Leeds

(9)

DATA CENTRE

Project Type

Installation and commissioning of mechanical services Project Description

Supply and Installation of 5 No CRAC systems to main IT suite, 2 No CRAC systems to UPS Room and 2 No dedicated cooling to the battery rooms, all with auto changer over controls.

Supply and Installation of 20 No comms room cooling units across 5 floors. Installation of environmental controls system, water leak and refrigerant leak detection system to all areas.

Forming of proprietary gantry to house external plant to comply with City of Westminster planning requirements. Date of Project

October – January 2007

Sumitomo Bank, London

Project Type

Design, installation and commissioning of mechanical services

Project Description

Supply and Installation of 2 No CRAC systems and supplementary inverter controlled cooling to main IT Suite.

Provided cold aisle arrangement with racks and environmental control package.

Date of Project November 2007 Project Budgets £35,000.00

(10)

Project Type

Installation and commissioning of mechanical services Project Description

Supply and Installation of 3 No CRAC systems to main IT suite.

Supply and Installation of 2 No CRAC systems to UPS Room.

Forming of plantrooms within underground car park including additional builders works and cages for condensers.

Date of Project

September – November 2005 Project Budgets

Bank of New York, Manchester

Project Type

Installation and commissioning of electrical services Project Description

Supply and Installation of 3 No CRAC systems to main IT suite.

Supply and Installation of 2 No CRAC systems to UPS Room.

Forming of plantrooms within underground car park including additional builders works and cages for condensers.

Date of Project

September – November 2005 Project Budgets

£165,000.00