Central Hosting

Case Study

(2)

Central Hosting – Case Study

Background

An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes of Technology (IoT) in Ireland. This significant undertaking involved a public procurement process, contract negotiations, widespread distribution of equipment, requirements definition and implementation of databases, software, operating systems and applications adapted to a single common specification across all Institutes.

The initial implementation model consisted of delivery of a multi-tiered architectural solution to each individual IoT, requiring Unix, Oracle and Windows installations for the 4 key systems being implemented (a total of 56 individual projects). Support was to be provided locally for the infrastructure with application functional support from respective vendors and an Chéim.

Driver

Over time, the sector recognised that advancements in the technological landscape, particularly around the area of network provision combined with the challenges of support requirements may allow for an alternative, more sustainable and efficient delivery model. On this basis the sector commissioned a report to analyse the model of delivery.

The report, produced by IBM in January 2003, put forward a strong case for pooling resources and set out the advantages of a centralised approach. Analysis revealed material differences in favour of the centralised model for three key areas: support, enhancements, and cost.

The report found that a centralised approach would;

 Protect the common design.

 Provide consistency in support services.

 Allow access to specialist expertise, which would otherwise be out of reach of individual institutes.

 Free personnel within the Institutes to focus on the activities they were originally intended to carry out.

(3)

Proof of Concept

In order to determine the technical feasibility of the proposed new model, a proof of concept exercise was undertaken in two of the Institutes, Carlow and Dundalk. During this exercise, the

Banner Student system was fully hosted, supported and managed using resources outside the

individual Institutes. The success of the pilot implementations demonstrated that it was possible to provide a viable service from a centralised location.

In January 2004 the Consortium Board met and agreed that An Chéim, acting on behalf of the Institutes, should proceed with central hosting and managed service procurement. An Chéim secured commitment from the Institutes to enter into a collective procurement process on behalf of all the Institutes, allowing progression to a detailed procurement project.

Procurement

A considerable public procurement exercise was undertaken and managed as a project by an Chéim; team members brought procurement, business, technical and legal expertise to the process. A high-level overview of the process is provided below:

Figure 1: Procurement Process Overview

PIN Nov 2003

Contract Notice

Published

May 2004

Shortlisting evaluation of PQQ June 2004 Invitation to Tender (4 parties) July2004

Preferred Bidder

Selection

Nov 2004

Due Diligence

Dec

2004-Mar2005

Contract Award

April 2005

(4)

Selection criteria included;

1) Service delivery and support 2) Ability to address a knowledge gap in the Banner student application

3) Software development competence 4) Design of the overall infrastructure architecture 5) Professional services competence 6) Completeness of service offering

7) Overall quality of the proposed data centre

8) Ability to understand and meet the requirements of the contracting authority

9) Transition implementation plan 10) References and existing customer service satisfaction levels

Implementation:

Following completion of the public procurement process, an Chéim undertook a programme to implement the centralised model. A phased approach was adopted during which all four systems for 14 Institutes (56 implementations in total) were migrated into the managed services environment.

Implementation: Phase 1 – Design and Build

Although the Invitation to Tender phase included proposals around the infrastructure to meet the 99.9% availability SLA, a significant body of work remained around the detailed technical design. In order to ensure High Availability, the solution implemented by An Chéim included provision of resilient power, network, firewalls, servers, storage, databases and applications architecture. In addition to dual provisions at the production site, an off-site Disaster Recovery facility was also implemented with a 15 minute recovery point objective and a 24 hour recovery time objective.

The solution had to be designed to handle average usage, whilst allowing some margin for additional traffic at peak times.

The technical design and build phase took place over a four month period and involved expertise from a wide array of specialist areas (O/S, Database, Networks, Application, Security and Systems Architecture).

(5)

Implementation: Phase 2 - Application Rollout

In parallel with the technical design and build phase, planning for the application implementation began. There were a large number of stakeholders to consider during this phase, from cross-functional end users of the systems to the vendors supporting the cross-functionality of the systems. This complex environment needed to cater for the autonomous nature of the Institutes whilst maintaining a baseline level of commonality to ensure support could be sustained.

Planning questionnaires were circulated to the Institutes to ensure that all pre-requisites were in place prior to implementation and that any localisations implemented were identified and addressed during the rollout. The rollout for each application followed the blueprint of Pilot and Validation sites, followed by roll-out in waves of three, four and five Institutes. There was engagement with the Institutes in the form of wave specific workshops and user acceptance testing. An overview of the timelines involved in the project is provided below:

Figure 2: Implementation and Rollout Overview

App 4: Library Management System – 14 sites Technical Design and Build

Apps Implementation Planning

App 1: Student Management System – 14 sites

App 2: Finance Management System – 14 sites

App 3: HR/Payroll Management System – 14 sites

(6)

Governance and Standards Applied

An Chéim recognised that whilst the implementation and rollout programme was an exercise of substantial magnitude that required meticulous planning and communications, it was necessary to build a sustainable offering that would require ongoing governance and monitoring to ensure service excellence. Policies and processes were put into place to allow management and continued service delivery; these included:

 The ITIL framework (the industry standard) was followed to ensure excellence in service delivery. This ensured that processes were in place to cover incident management, change management, problem management, release management, availability management etc.  There was a high level of security built into the solution. Data would be kept in compliance

with the Data Protection Act 1988 and EU directive 95/46EC. A common state of practice was agreed between the Institutes, An Chéim and the managed services supplier. Technical security was built into the overall architecture, with penetration testing to be carried out by third party experts.

 A service level agreement was drawn up to ensure optimal service delivery. It contained a system of credits and bonuses to drive performance. A penalty was applied for missing the SLA target and a credit awarded for exceeding it. This arrangement not only served to enforce the SLA, but also incentivised performance above target levels. A defined reporting regime was set up, with monthly performance checked against the SLA, root cause analysis for priority 1 and 2 calls, and access to call status via the web.

 Reporting requirements were defined in the contract and were used to analyse performance and report to management and the An Chéim board on actual performance against contract.  Institute obligations, included nominating a local service coordinator to liaise with the managed services agency and An Chéim, supplying names of personnel authorised to log calls, and appointing individuals to the escalation chain. The Institutes were also required to make available necessary staff to cooperate with the managed services agency in the event of a fault requiring further investigation.

 A communications strategy was developed for the new managed service, which included devising a user guide and escalation paths.

(7)

Conclusion

All systems were centralised by mid 2006. Each year, approximately €1 billion has been managed in financial transactions and €500 million in payroll payments using the systems implemented by An Chéim and managed in the central hosting environment. There are currently more than 50 terabytes of data and over 150 oracle databases under management for the 13i Institutes of Technology and their 100,000 full and part-time students and 7,000 staff. All this has happened in the context of rigorous contract and SLA management, driving optimal service delivery. In terms of performance statistics, between 2009 and 2013 97% of calls were resolved within the target resolution time, average service availability was 99.9%, and the average customer satisfaction rating was 4.3 out of 5ii. These performance statistics highlight the success of the central hosting model implemented by An Chéim.

i

The number of Institutes changed from 14 to 13 with the merger of Tipperary Institute and Limerick Institute of Technology

References

Related documents

To that end, the Open Travel Alliance (OTA) was formed in 1998 and now has a global membership of over 150 travel companies from suppliers, such as airlines, hotels, car rental, rail,

Having reaped low hanging fruits in 2015, FinTech Group was able to significantly turn around its business (both B2B and B2C) and to streamline its operations boosting

The study was conducted using the survey model because its aim was to determine the TPACK of pre-service teachers in the departments of primary school elementary school teaching

1 Ph.D Student of occupational health engineering, Student Research Committee, School of Public Health, Shahid Beheshti University of Medical Sciences, Tehran, Iran• 2 Department of

Функціонування Са 2+ /н + -обміну залежить від величини градієнта протонів та характеризується зворотністю, а саме в умовах залуження позамітохондріального

CLAD-LATINOAMERICANO ADMINISTRACION DESARROLLO, CALLE HERRERA TORO, QTA CLAD, SECTOR LOS NARANJOS, LAS MERCEDES APARTADO 4182, CARACAS, VENEZUELA, 1010-A.2. Social Sciences

Within each season, three renewable energy solutions were studied: the hosting capacity of a typical grid topology without storage, the hosting capacity with decentralized

Pittsburgh’s historic patterns of uneven investment contribute to modern disparities in urban space; the contemporary social geography aligns significantly with the