• No results found

The cycling routes project of Liguria

N/A
N/A
Protected

Academic year: 2021

Share "The cycling routes project of Liguria"

Copied!
26
0
0

Loading.... (view fulltext now)

Full text

(1)

The cycling routes project

of Liguria

Dipartimento Programmi Regionali, Porti,Trasporti, Lavori Pubblici ed Edilizia

(2)

Eurovelo and BicItalia

(3)

Via Pedemontana (40 Km)

Via del Mare (50 km)

Greenway dell’Arco Ligure (367 km)

Via dei Monti (120 km)

Via dei Pellegrini (50 km)

The start – FIAB proposal

(4)

The steps of a process

12,5 M€ in Regional Program FAS 2007-2013

1. Municipalities project census and georeferencing of the regional cycling routes proposal

2. Liguria Bike Club

3. Intermodality bike + train

4. Analysis and classification of the paths 5. Standardization

6. Cycling routes project and logo approval

(5)

Genova Savona

La Spezia

Imperia

The project –

october 2013

Cycling routes

Province borders

888

km

A cycling routes network:

cycling paths, pedestrians paths, low traffic roads for tourism and sustainable mobility

(6)

Genova Savona La Spezia Imperia To propose 210 km 116 km Planning 6 km Carrying out 555 km Ready and usable

457 km su strada 14 km su percorso pedonale 6 km su marciapiede 1 km in affiancamento strada 72 km in sede propria

(7)

462 km On low traffic roads

13 km On pedestrian roads 80 km Cycling paths

Aggiornata al 19 aprile 2012

Genova Savona La Spezia Imperia

(8)

Aggiornata al 19 aprile 2012

The budget from jenuary 2005 to october 2013

RCL Cycling Paths

Costs and regional contribution from Jenuary 2005 to October 2013

39 8 31 18 101 41 4 17 9 72 34 2 12 6 54 1.057 709 490 553 535 387 345 538 259 871 0 20 40 60 80 100 120

Provincia di Imperia Provincia di Savona Provincia di Genova Provincia della Spezia TOTALI

Fonte dato SIRGIL - Sistema Informativo Gestione Investimenti Liguria

T o ta l v a lu e s in M 0 200 400 600 800 1000 1200 A ve ra g e v a lu e f o r p ro je ct ( € x 1 0 0 0 ) Total costs (M€) Regional contribution (M€) Number of project

Average cost for project (x1000€)

Average regional contribution for project (x1000€)

(9)

bike + train

Into the 2011, 12, 13 Service Contract between Regione

Liguria and Trenitalia: free bikes trasportation on the

regional trains of Liguria

Users (

fonte dato Trenitalia

):

nel 2011 n. 8.640

nel 2012 n. 8.868

bike + urban public transport in Genoa

Lifts, Cable railways,

Casella train

Metro, Buses

(10)

DGR 929/2012

Approvazione della rete ciclabile ligure (RCL)

Geografical data base - open data Logo

Analysis and classification with completion priorities Regional criteria for roads and turistic signs, materials

http://www.regione.liguria.it/argomenti/territorio-ambiente-e-infrastrutture/mobilita-e-viabilita/la-rete-ciclabile-ligure.html

(11)
(12)
(13)
(14)

Standard – cycle routes signs

Road

DGR n. 944/2013 - Approvazione dei criteri regionali per la Segnaletica ciclabile, il regolamento d’uso e la manutenzione degli itinerari ciclabili e ciclopedonali della Rete Ciclabile Ligure (RCL)

(15)

FAS financing 1 – DGR 1410/2012

Availability 5M€ - 6 projects

Provincia di Imperia 1 project lenght 5 km

Total investment value 6M€ FAS co-financing 4,82M€

Provincia di Genova 4 projects

Total lengh 6,5 km Provincia della Spezia 1 project lenght 21 km

Cycle path FAS (M€) Total invest. (M€) Camporosso (Im) 0,69 0,86 Cogoleto (Ge) 1,28 1,60 Arenzano (Ge) 0,80 1,00 Casella (Ge) 0,40 0,50 Carasco (Ge) 0,15 0,19 Canale Lunense (Sp) 1,52 1,90

(16)

FAS financing 2 – the “Cycling riviera”

Program of 21 interventions, for 5 M€ of FAS co-financing. Total investment 6,25 M€

(17)

Greenways - some data

Knowledge

Availability of the sites Acquisition costs

Times and bureaucratic procedures State of decay

24 km from Ospedaletti to San Lorenzo already done

19,5 Km of railways will be free from rail by 2015 (from San Lorenzo al Mare to Andora) Other 36,5 Km from Andora to Finale Ligure, will be free from rail ???

48 Km of abandoned railways from Finale Ligure to Genova Voltri, some of them already reconverted to greenways

(18)

Greenways – the recovery of disused railways 1

Cycling riviera (Ospedaletti - San Lorenzo al mare) 24km

(19)

Albisola superiore, Celle, Varazze, Arenzano - 9 km

(20)

Greenways – the recovery of disused railways 2

(21)

Relationship with urban planning

PTCP - Territorial plan for the landscape coordination for the coast

Constraint on sites and on manufactures railway in Western Liguria

(22)

Relationship with port planning

La Spezia PRP (Port Master Plan) in force: cycle path between city and port area in the south east part of the city

Savona-Vado PRP in force: contruction cycle path from Priamar to city of Vado ligure

Vado ligure restoring of waterfront with a cycle path Genova next PRP ………?

(23)

(24)
(25)

A process steps –

Topics and activities

Proposals for Italian Street Code (Codice della Strada) updating:

Updating of nomenclature for cycling mobility Aimed and adequate signals for cycling mobility

Rules for encouraging cycling mobility in towns

Urban planning and projecting in coherence with the RCL project Financing - Program 2014 – 2020

Relationships with other organizations (Anas, Trenitalia, RFI, public transport Companies, Port Authorities)

Implementation and support of intermodality

Acquisition of abandoned raylways

Involving of private sector for maintenance anche promotion

(26)

Thanks !

Luisa Casu - Dipartimento Programmi Regionali, Porti,Trasporti, Lavori Pubblici ed Edilizia Settore Pianificazione e valutazione interventi

luisa.casu@regione.liguria.it

http://www.regione.liguria.it/argomenti/territorio-ambiente-e-infrastrutture/mobilita-e-viabilita/la-rete-ciclabile-ligure.html

References

Related documents

No Post-Scriptum às Migalhas Filosófi cas, de 1846, há uma tese profundamente instigante sobre essa relação de Kierkegaard com a herança clássica e a herança cristã e, por

vore activity was postulated as the major bone-accumulating agency at Swartkrans (Brain, 1970), two new early hominid vertebrae were described (Robinson, 1970), more

Another meditation teacher, who has facilitated meditation teachers training, has also worked with vulnerable populations in San Francisco including those with psychiatric

The developed greenness-duration irrigated area model performs with an improved level of skill, compared to the widely accepted method of using single date imagery to

one-way table: number of rows with each value of rep78 create binary variable for every rep78 value in a new variable, repairRecord include missing values. tabulate rep78

These findings parallel the reported barriers to implementing distance learning technology in nursing programs: faculty development, faculty release time, on-site

PROJECT COPPELIA Solver Constraints Refined Skeletal Motion Character MESH Motion ANIMATION Virtual ENVIRONMENT Performance MODELLING. Figure 1.2: T he P ro je c t “Synthesising

The re-incarcerated prisoners were matched (1:2) to 30 HIV-infected incarcerated prisoners on HAART who remained incarcerated during the re-incarcerated participants’ release