• No results found

Name: Company: Mail: Project management: two new implementation projects, four roll-out projects and several smaller logistics projects.

N/A
N/A
Protected

Academic year: 2021

Share "Name: Company: Mail: Project management: two new implementation projects, four roll-out projects and several smaller logistics projects."

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

(1)

Org.nr: 556809-4923 Momsreg: SE556809492301

Consultant Profile

Name: Crister Blixt

Company: CAOLIT AB

Mail: [email protected]

Telephone: +46(0)700-917005

Year of birth: 1963

Education: Master of science, industrial

environment, LUTH Luleå Tekniska Universitet

Languages: Swedish (mother tongue), English

Work summary

Sixteen years of experience in SAP, fourteen years as a SAP consultant with focus on warehouse, logistic execution, purchasing, sales and integration with external systems. Worked as a consultant in a wide range of areas, Throughout the years I have gained experience and an understanding of the magnitude of a “system implementation project” including everything from system setup to

monitoring the economy. Some of my strengths as a consultant are characteristics such as listening, understanding the business as well as the systems, and be able to switch between them, analytical ability and calmness. Branch experience in wholesale, manufacturing, pharmaceutical, chemical industry, industrial process and defense industry contributes to my broad experience.

SAP competence

Project management: two new implementation projects, four “roll-out projects” and several smaller logistics projects.

Application consultant: fourteen new implementation project, nine roll-out project and five upgrade project and one company split project. Warehouse management (WM), Logistic execution (LE), Material management (MM), Sales and Distribution (SD), Integration (EDI related to SD, MM, LE, WM, PP), Mobile device warehouse (LE-MOB), Integration with external warehouse system, freight document system and production system (OPC), Authorization, Solution manager, Environment Health and Safety (EH&S)

Experience of projects in the following countries: Sweden, Finland, Norway, Denmark, England, Ireland, Germany, Spain, Portugal, Holland, Belgium, Poland and France.

(2)

Completed SAP projects

Aventis Pharmaceutical

2000 Adjustment and development of MM and SD

process.

User education SD and MM.

2001 Upgrade project 4.0B to 4.6C, SD and MM

2002 Authorization.

New purchase process.

Atos Medical Medical devices

2006-2007 Project manager for AiO-implementation.

2007 Roll-out project, QA

2009 – 2010 Roll-out project, Germany, Project manager

BAE Systems AB Manufacturing

2010 – 2011 New implementation/Roll-out, Warehouse, interface to external system. Mobile devices warehouse (LE-MOB).

Bacou-Dalloz Manufacturing

2001 Euro conversion project, MM

2002 – 2003 Migration project, LSMW

Byggbeslag Wholesaler

2004 New implementation, Warehouse, interfaces to

external freight document system

Coca-Cola Manufacturing

2002 Education, update of master data and purchase

document

Campbell Soup Manufacturing

2003 WM, SD, LE, MM, Authorization

New implementation, Mobile devices warehouse (LE-MOB).

(3)

Campbell Soup Ltd Manufacturing

2004 – 2005 WM, Authorization

New implementation, Mobile devices warehouse (LE-MOB)

Dafgård AB Manufacturing

2001 Upgrade project 3.1H to 4.6C, WM, MM, QM

2002 Adjustment and development of purchase

process, MM

2003 Pilot study mobile devices warehouse

(LE-MOB)

ESMA Wholesaler

2004 New implementation , LE, Interfaces

ESBE AB Manufacturing

2005-2006 New implementation, LE, Interfaces external system, QM, work flow

ESBE GmbH Wholesaler

2006 Roll-out project, Project management and LE

Ericsson (EHPT) Telecommunications Industry

2001 Documentations project, MM and HR.

2003 Archive

Emerson AB Manufacturing

2000 Pilot study, WM

GGP AB (Stiga AB) Manufacturing

2000 Adjustment and new implementation of

warehouse process, WM. User education, WM.

(4)

Integration MM-WM Integration PP-WM

2001 Upgrade project 3.1H to 4.6C, WM

2002 Authorization project

2002 Migration project, roll-out Denmark, LSMW

2003 Warehouse project WM

Mobile devices warehouse (LE-MOB)

2004 Production project, warehouse and product

labeling

2005 Warehouse project, external warehouse

Germany

2005 Serial number project

2005 – 2006 Warehouse project, external warehouse Belgium/Trollhättan, Logistics and EDI.

2007 Pilot study, merge project

2008 ASN – project

2008 Test and adjustment, logistic, merge project

Gycom AB Wholesaler

2001 New implementation of 4.6, LE and WM

2001 Roll-out Finland, SD/MM

2002 Roll-out Denmark, SD/MM

2006 Interface to Centiro, LE and EDI

Gärdin & Persson Wholesaler

2005 New implementation, Warehouse, Authorization

Hilton Food Group AB Manufacturing

2008-2009 Automated warehouse, WM, LE and EDI

2010-2011 Roll-out Denmark, SD, MM, EDI, Integration

with external warehouse system

Hästens AB Manufacturing

(5)

Octapharma Pharmaceutical

2002 Company split project, SD/MM/Authorization

PalmAlmgren Resins AB Manufacturing

2002 New implementation, EH&S and authorization

Phadia AB Pharmaceutical

2007 Clean-up project (preparation for template

project). Project management and logistics 2007 – 2008 Roll-out project, Project management and

logistics

2010 Roll-out project, Spain & Portugal, MM, LE and EDI.

Pharmacia Diagnostics AB Pharmaceutical

2001 Upgrade project to 4.6C, WM

2002 Warehouse project, WM

Salico Manufacturing

2002 New implementation, Authorization

2009 Roll-out project, Öllövgrönt, Project

management

Samsung Wholesaler

2012 Logistic project, MM, LE and EDI

SAP Sweden

2002 LO530 – WM, teacher

SCA Timber UK Wholesaler

2005 - 2006 New implementation, WM, Mobile devices

(6)

2001 New implementation, Authorization

VWR (Merck EuroLab /Kebo Lab AB) Wholesaler

2000 Support WM/EH&S/Oracle

2003 Upgrade project 4.0 to 4.6, WM, CS

2004 WM, Mobile devices warehouse (LE-MOB)

Wasabröd AB Manufacturing

2000 Roll-out Holland, SD / MM

2003 pilot study, mobile devices warehouse

(LE-MOB)

Zerochaous

2013 - 2014 New implementation, Migration, WM, LE, EDI, SQL and IBM Ready to Launch (RTL).

Ziehl-EBM / ebmpapst Wholesaler, Manufacturing

2006 New implementation, 3 countries, LE, Interfaces

external system, Product labeling, QM

Former employer

2000/04 – 2010/07 Implema AB, Stockholm

Project management,

SAP applications consultant: WM, LE, MM, SD, EDI

1995/01 – 2000/04 VWR / Merck Eurolab / Kebo Lab AB, IT avdelningen, Stockholm.

Internal consultant, SAP, Oracle, Mascot, Cobol , Dangerous goods, Warehouse, Product labeling and catalogue system

1990/08 – 1995/01 Kebo Lab AB, inredningsavdelningen, Stockholm

Project manager Project specialist IT responsible Group manager

(7)

1989/06 – 1990/07 Maskinteknik, Piteå

Technical conjuncture, AutoCad, Aries

Education

1984/08 – 1989/06 Master of science, industrial environment LUTH Luleå Tekniska Universitet

1983/06 – 1984/08 Military service KA4, Göteborg

1979/08 – 1983/06 4-year technical education, chemistry Kalix/Luleå/Örebro

SAP education

2007 ASAP Focus training

SAP Svenska, Helsingfors, Finland

2005 BIT601 Workflow

SAP, Bryssel, Belgium

2002 CA210 EDI Interface

SAP , Alvik

2001 CA940 Authorization Concept

SAP, Alvik

2001 LO531 WM

SAP, London, England

2001 MY301 Workplace

SAP, London, England

2001 WSED SD Customizing

SAP , Alvik

2000 LO605 Sales

SAP , Alvik

2000 LO610 Delivery process

SAP , Alvik

1998 EH&S Environment health and safety, product

safety

Frankfurt, Germany

1998 NAMM2 Material management (Experienced)

WM

SAP , Alvik

(8)

1998 BC420 ABAP/4 Data Interfaces SAP , Alvik

1998 BC430 ABAP/4 Dictionary

SAP , Alvik

1997 SAP20 SAP 3/R Overview

SAP , Alvik

Other education

2007/03 – 2007/06 Communication and Leadership Dale Carnegie, Stockholm

2006/08 GMP-education: Validation and computer

system

References

Related documents

With a global sales and service network in more than 40 countries, AVEVA is a leader in engineering design and information management solutions for the plant, power and

AdV, adenovirus; ASCT, autologous stem cell transplantation; CDI, clostridium difficile infection; CMV, cytomegalovirus; CVID, common variable immunodeficiency; EM, electron

wrote in Husby (at paras. 1 and other cases have clearly established, is meaningless unless the parties know precisely what aboriginal right or claim is alleged to be infringed

WHEREAS, the cost of said contract has been included in the 2021 budget; now, therefore, be it RESOLVED, that the Chairman of the Wayne County Board of Supervisors is authorized

For this the camera is aimed at a particular scene and the linear array is slowly moved from one side of the camera's image gate to the other while the scanner accumulates the

For initial type testing the results of the tests performed as part of the assessment for this European Technical Approval shall be used unless there are changes in the production

Deacon  Let us confess our sins against God and our neighbors.    Please stand or kneel as able 

We have audited the accompanying financial statements of the United Water Conservation District (the District) which comprise the statement of net position as of June 30,