CATALOG 2013

BESA

CONSTRUCTION

www.besainsaat.net

(2)

CONTENTS

1 About BESA

2 Our Services

(3)

ABOUT US

BESA İnşaat Taahhüt Sanayi ve Ticaret Ltd. Şti., active for 20 years in the construction sector, particularly in substructure contracting works, has always prioritized technological innovations and quality in its efforts. Our firm, enjoying the rightful pride of delivering all of its projects without a problem, owes its success to uniting our engineering information and experience with quality labor force and powerful equipment.

OUR VISION

Meeting all product and service expectations of our customers at world standards, prioritizing health and safety and fulfilling labor safety liabilities. Realizing our goals in compliance with the corporations and people we are related to without any harm on the environment and the nature, keeping a close eye on the global developments in the construction sector.

1

(4)

OUR SERVICES /

SUBSTRUCTURE WORKS

SUPERSTRUCTURE WORKS

ROAD WORKS

PROJECT MANAGEMENT

SUPPLY AND PROCUREMENT

(5)

---PRINCIPLE OF

LABOR

SAFETY

TIMELY

WORK

DELIVERY

3

(6)

COMPLETED PROJECTS-LIBYA /

LIBYA-AL ASSA

Al Assa Villas Construction Project (411 Villas and

24 Social Buildings Superstructure and Infrastructure and

Landscaping Works)

DATE OF COMMENCEMENT:

01.02.2008

REMARKS:

Construction of 411 nos of

villa and 24 nos Social

Buildings(~220.000 m2)

with all the infrastructure

network.

TYPE:

Superstructure

NAME OF THE WORK:

(7)

CLUB 1 BUILDING

5

CLUB 3 BUILDING

(8)

SCHOOL BUILDING

POLICE STATION

OFFICE BUILDING

(9)

7

COMPLETED PROJECTS /

İSKİ - Beyoğlu

Beyoğlu Branch Directorate being Responsible

Miscellaneous Sewerage Works (2002 unit prices)

DATE OF COMMENCEMENT:

01.02.2002

DATE OF COMPLETION:

08.06.2002

STATUS OF WORK:

Final Acceptance Made

(10)

NAME OF THE WORK:

İSKİ - Gaziosmanpaşa

Gaziosmanpaşa Branch Directorate being

ResponsibleConstruction and Repair of

Wastewater and Potable Water (2008 unit price)

DATE OF COMMENCEMENT:

31.05.2008

DATE OF COMPLETION:

11.11.2008

STATUS OF WORK:

(11)

NAME OF THE WORK:

İSKİ - Bayrampaşa

Bayrampaşa Branch Directorate being Responsible

Works of Construction, Maintenance and Rehabilitation

of Water, Canal and Rainwater Canals (2006 unit prices)

DATE OF COMMENCEMENT:

13.09.2006

DATE OF COMPLETION:

31.17.2009

STATUS OF WORK:

Final Acceptance Made

(12)

NAME OF THE WORK:

İSKİ - Gaziosmanpaşa

Gaziosmanpaşa Branch Directorate being

ResponsibleThe Work of Partial Renewal

and Rehabilitation on Broken, Collapsed,

Damaged and Out-Of-Service Wastewater

and Potable Water Lines

DATE OF COMMENCEMENT:

27.07.2009

DATE OF COMPLETION:

26.08.2010

STATUS OF WORK:

(13)

11

NAME OF THE WORK:

İSKİ - Esenler

Esenler Branch Directorate being Responsible

The Work of Complete and Partial Renewal and

Rehabilitation on Existing Partially Broken, Collapsed,

Damaged and Out-Of-Service Potable Water and

Wastewater Lines (2008 Unit Prices)

DATE OF COMMENCEMENT:

16.02.2009

DATE OF COMPLETION:

30.07.2009

STATUS OF WORK:

(14)

ONGOING PROJECTS /

İSKİ - Şile

Şile Branch Directorate being Responsible

The Work of Partial Renewal and Rehabilitation

on Broken, Collapsed, Damaged and Out-Of-Service

Wastewater and Potable Water Lines

DATE OF COMMENCEMENT:

25.04.2011

ESTIMATED DATE OF COMPLETION:

15.04.2014

(15)

NAME OF THE WORK:

Büyükçekmece Belediyesi

Büyükçekmece District 1st Region Road

Maintenance, Repair and New Road

Construction Work

DATE OF COMMENCEMENT:

04.01.2013

ESTIMATED DATE OF COMPLETION:

31.10.2013

SURVEY AMOUNT:

1.793.647,50 TL

(16)

NAME OF THE WORK:

Büyükçekmece Belediyesi

Throughout Büyükçekmece District

Work of Rainwater Canals Construction and Repair

DATE OF COMMENCEMENT:

19.11.2012

ESTIMATED DATE OF COMPLETION:

(17)

İLYAS SAVAŞ

PROJECT NAME:

Beyazıt Beyaz Saray Bazaar and Hotel Construction

PROJECT DETAİL:

Savaş Construction, as the contractor of SİSKA Construction firm, was commissioned in the project of construction of Istanbul Beyaz Saray Palace Bazaar and Hotel in 2001. 14.000 m2 of reinforcement and new block construction were made within the framework of the project.

PROJECT NAME:

Yalıköy Holiday Village

PROJECT DETAİL:

Savaş Construction was commissioned in the substructure improvement project of a 171-flat holiday resort in Silivri in 2000. Within the framework of the project, necessary works were successfully completed for elimination of cesspools of the resort, construction of sewerage network and their connection to the collection on the coast.

PROJECT NAME:

Construction of Extension for Istanbul Light Metro System

from Yenibosna to the Airport

PROJECT DETAİL:

Savaş Construction was commissioned in the project of Gülermak firm for construction of Light Metro System in Istanbul in 2000. Within the scope of the project, necessary works like rough construction of the transformer building, putting up of the walls, drainage, wooden settled roof and roof cover, dismantling of locked parquets have been completed with successs.

PROJECT NAME:

Bakırcılar Industrial Site and Birlik Industrial Site

Distillation Plant Project

PROJECT DETAİL:

Savaş Construction has been commissioned in the distillation plant projects of Düzey Construction between 1996-1999. Within the scope of the project, the construction of the distillation plants, and the rough construction works of Beylikdüzü Çevreciler Housing Complex Cooperative consisting of

2 Blocks and 120 apartments have been realized.

PROJECT NAME:

Istanbul Fast Trolley 2nd Stage Construction Project

PROJECT DETAİL:

Savaş İnşaat has been commissioned in the 2nd Stage Construction of Istanbul Fast Trolley Project of Oluşum Yapı Mühendislik Construction firm between 1992-1994. Within the scope of the project, the following works have been performed successfully.

• Bus Terminal viaduct construction • Mimar Sinan station construction • Bahçelievler station construction • Yenibosna station construction • Yenibosna transformer construction • Yenibosna culvert construction

• Mimar Sinan transformer construction

COMPLETED INDIVIUAL WORKS

PROJECT NAME:

S.S. Uyumkent Housing Construction Cooperative

Construction Project

PROJECT DETAİL:

Savaş İnşaat has taken successful part in the project of Construction of S.S. Uyumkent Housing Construction Cooperative of TİMSA Construction firm between 1986-1992.
(18)
(19)

10

İLYAS SAVAŞ REFERENCE DOCUMENTS

(20)

MEHMET ÖZEN

1998 – 2000 Çukurova İnşaat A.Ş. Bağcılar Olympic Enclosed Gym Rough Construction Chief

2000 – 2000 Net Yapı Akaretler Multi-Storey Car Park Rough Construction Chief

2001 – 2001 Çukurova İnşaat A.Ş.Aydın Municipality Service Building Construction Construction Chief

2002 – 2003 Lidya Yapı Kadıköy Wastewater Preliminary Distillation Plant Rough Construction Chief

2002 – 2003 Hona İnşaat Topkapı City Park Multistorey Car Park Rough Construction Chief

2003 – 2003 Timsan İnşaat Üsküdar Multistorey Car Park Rough Construction Chief

2003 – 2005 Çukurova İnşaat A.Ş. İSKİ Beyoğlu Branch Directorate Maintenance and Repair Construction Chief

2005 – 2006 Çukurova İnşaat A.Ş. Beyoğlu Municipality Road Construction and Repair Construction Chief

2006 – 2007 Çukurova İnşaat A.Ş.İSKİ Bağcılar Branch Directorate Maintenance and Repair Construction Chief

2007 – 2008 Besa İnşaat Ltd.Şti. İSKİ Bayrampaşa Branch Directorate Maintenance and Repair Project Manager

2008 – 2009 Besa İnşaat Ltd.Şti. İSKİ G.O. Paşa Branch Directorate Maintenance and Repair Project Manager

2008 – 2009 Besa İnşaat Ltd.Şti. İSKİ Esenler Branch Directorate Maintenance and Repair Project Manager

PROFESSIONAL EXPERIENCE

(21)

19

MEHMET ÖZEN

(22)
(23)

21

(24)

References

Related documents

In an experiment involving foreign- and standard- accented speech, Yi, Phelps, Smiljanic, & Chandrasekaran (2013) collected native English speaker listeners’

This study therefore proposes a systematic approach to strategic maintenance and renovation planning that combines a modified deterioration function with a service-life

• Value Chain mentality ( Product Family approach) • Understanding Managing processes. • IT solutions •

внзкий голос deep voice внзкое качество poor quality *никак in no way Никак нельзЯ. It is quite impossiЫe. Он никак не мог открьiть ЯщиК. In no way

subcontractor. Certain exceptions may apply where contracts or agreements are subject to wage determinations required by federal law which are higher than the wage required by

Chicago, December 28--The Chicago Cardinals went rushing over a frozen field and beat the Philadelphia Eagles in the playoff for the National League championship in Comiskey Park

superior seta; propodus 2.6 times longer than broad, slightly longer than carpus, palm with one long and two short comb setae, plus row of several small setules; fixed finger with

It also gives the analysis of the quality of performed GNSS observations, analysis and comparison of the geoid undulations from official geoid solutions of the Republic of