• No results found

HYDROPOWER. Purpose Builts

N/A
N/A
Protected

Academic year: 2021

Share "HYDROPOWER. Purpose Builts"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

HYDROPOWER

Purpose Builts

(2)

Prosem Engineering has defined three main pillars for its service con-cept: cooperation, excellent service provision and innovative approach.

Cooperation is an effective process in obtaining the right results. In its service delivery, Prosem Engineering not only aims to ensure collaboration between various disciplines but also adopts the philosophy of engaging client in the work process.

Prosem Engineering has been structured to produce its services entirely in-the-house in order to realize service provision without compromising the quality level it has promised to its customers. Prosem Engineering is working through a dynamic organization based on a sound technological infrastructure in order to guarantee service quality and meet the needs of the client swiftly.

Prosem Engineering, has an understanding of a work ethic which centers on seeking solutions that goes beyond the ordinary and specific to the job. While creating tailor-made solutions for each pro-ject with an approach based on research, creativity and innovation, it also provides means to have a problem-free operating period and to minimize operating costs.

Strategic Partnership

Excellent Service

(3)

Each project has its specific requirements and multiple paths leading to solutions. Prosem Engineering starts off by fully and correctly assessing the needs of the customer along with the project require-ments.

Prosem Engineering has carried its reputation to the highest level thanks to its innova-tive approach and client satisfaction it has achieved. The company has reached its target of adding maximum benefit to its clients’ works by virtue of the team spirit and respon-sible approach of its highly competent staff.

Prosem Engineering gives importance to corporate culture and brand value. During af-ter projects, it promises not to be involved in attitudes and approaches harming corpo-rate identity.

Prosem Engineering understands the value of our natural environment and the need to minimize impacts from society and industry. Our talented environmental professionals have a long history of providing solutions for private and public clients around the world

By analyzing the environmental and social impacts of engineering designs, it offers so-lutions to minimize the potential negative results.

Value Added Engineering

Tailor-Made

Solutions

Branding and Communication

Social Environment

(4)

3D Design

3D

To provide high quality service, to meet the needs and requirements quickly and to reach error-free and economic solutions, Prosem Engineering makes its designs using 3D soft-ware with the help of a highly competent staff.

All of the structures and even the smallest details are

(5)

Field of Activity

Expertise

Prosem Engineering offers project management services for Hydropower Plants covering the whole chain – project development, planning and con-struction. Beyond the project management services, all consultancy services technical, economic and financial required for the investments are offered.

We consistently deliver innovative technical solutions to our hydropower cli-ents through a collaborative and open work style where we develop a strong appreciation of the project’s requirements.

• Hydropower • Dams

• Diversion Weir • Powerhouse

• Reservoir Optimization Design • Feasibility Study • Concept Project • Final Design • Application Project • As-built Project • Technical Specification • Tender Documentation • Tender Evoluation • Technical Due Diligence • Asset Valuation • Construction Management • Project Management • Owner’s Engineering • Lender’s Engineering • Financial Modeling • Hydromechanical Equipment • Electromechanical Equipment • Tunnels

(6)

Who We Are

Finished his bachelor degree at 1993 in Middle East Tech-nical University Civil Engineering Department. His career is intensively devoted to water resources and hydraulic structures. He has also experience in earthquake engi-neering. He had participated in several different stages in many irrigation, domestic water, flood mitigation and en-ergy related projects that were constructed by State Water Works and private companies.

CEO, Founder

Civil Engineer

kkaraagac @ prosem.biz

Kamil Karaağaç

Finished her bachelor degree as first place graduate at 1993 in Anadolu University Architecture Department. She took her M.S. Architect title by finishing Masters’ Degree at 2006 in Hacettepe University Interior Architecture and Environment Design. She had mainly developed her work experience in the architecture and interior designs of en-ergy, hospital, airport, office and educational buildings. She gained abroad experience by working in Moscow – Russia at 1996.

Finished his bachelor degree at 2004 in Middle East Tech-nical University Civil Engineering Department. Following his bachelor degree, he started his Masters’ education and he took his Masters’ degree at 2010 in same department’s Hydromechanics Division He worked intensively on water resources and hydraulic structures in his career. He has also worked as a design manager in a steel construction design firm.

Chief Operating Officer

Head of Planning and Final Design, Founder

Architect, M.Arch Civil Engineer, M.Sc. fkaraagac @ prosem.biz osever @ prosem.biz

Figen Karaağaç

Özgür Sever

(7)

Who We Are

Finished his bachelor degree at 2004 in Middle East Tech-nical University. Following his bachelor degree, he started his Masters’ education in Hydromechanics Division and finished at 2009. He started working in a hydroelectrical powerplant design office while continuing on his Masters’ education.

Finished his bachelor degree as an honor graduate at 2006 in M.E.T.U. Civil Engineering Department. His career is in-tensively devoted to planning and detail design of hydrau-lic structures. He had participated in different positions, primarily as a project head and designer in energy related projects that were constructed by State Water Works and private companies.

Finished his bachelor degree at 2005 in Karadeniz Techni-cal University. He worked at natural gas sector in project design, site applications and site controlling services in the first two years of his career. He had started working as an electrical engineer in Prosem Engineering Company beginning from 2007 November.

Director Director Director Civil Engineer, M.Sc. Civil Engineer Electrical Engineer besim @ prosem.biz selcuk @ prosem.biz serkan @ prosem.biz

Besim Gülcü

Selçuk Güları

Serkan Kılıç

(8)

Recent Works

Examples of projects.

Devecikonağı HEPP

Vizara HEPP

Güneşli 2 HEPP

Devecikonağı HEPP Kayaköprü 2 HEPP Kayaköprü 1 HEPP Arpa HEPP Vizara HEPP Akdere HEPP Azmak HEPP Azmak HEPP Kale HES

RCC Dam H = 40 m

Power House

Geotechnical Applications

Substation 154 kV Cylindrical Headpond Unlined Tunnel - 8000 m Pressurized Tunnel

H = 280 m

Penstock, Steel, 4000 m Penstock, GRP - 4000 m Long Riverbed Excavation,

4.5 M m3

Rubber Dam

L= 48 m, Q = 1000 m3/s

Pressure Relief Valve (PRV), ϕ = 400 mm

(9)

Examples of projects.

Recent Works

Paşa HEPP Kaletepe HES Köprübaşı HES

Kaletepe HEPP

Yedigöl HEPP

Vizara HEPP

Hemşin HEPP Kayaköprü 1 HEPP

What else can we do for you? Please visit our website. Paşa HEPP Kaletepe HEPP

Semi Indoor Powerhouse

Headpond

Daily Regulation Storage 35.000 m3

Pressurized Tunnel L = 6400 m, H = 290 m

Concrete Gravity Dam H = 26 m

Stepped Spillway Jacking Pipe

www.prosem.biz Concrete Conduit

Water Conveyance Line

U-PVC Pipeline, 11.500 m Powerhouse

Steel Construction

Concrete Gravity Dam H = 23 m

(10)

Akdere Diversion Weir and HEPP

B. Ergünler Yol Yapı

Aksar Div. Weir and Nazar HEPP

Akşar – Nazar Enerji

Angutlu HEPP

Türkerler İnşaat

Arpa Diversion Weir and HEPP

BM Holding

Azmak HEPP

BM Holding

Bursa Gemlik Küçükkumla Göleti ve Sulaması

DSİ

Ceviz HEPP

Arsan Enerji

Buyukbahce and Bagbasi HEPP

Kayı İnşaat Derince Dam Ak-Eli İnşaat Devecikonagi HEPP BM Holding Güneşli II HEPP Asya Enerji

Hasankale Div. Weir and HEPP

AR-ES Elektrik Üretim

Hemşin HEPP BM Holding Hunut HEPP Gözütok İnşaat Kale HEPP Asa Enerji Kaletepe HEPP Kayı İnşaat Kayaköprü I ve II HEPP Arsan İnşaat Kayraktepe Dam BM Holding

Kızılırmak – Kargı Barajı ve HEPP

Akel Enerji Koyunbaba Dam Akyal İnşaat Köprübaşı HEPP Arsan İnşaat Köprüyanı HEPP

Hetaş Hacisalihoğlu Enerji

Çökek HEPP

Batıçim Enerji

Mavi HEPP

Cese Enerji

Paşa Diversion Weir and HEPP

BM Holding

Selçuk HEPP

Elif Grup Enerji

Sedef HEPP

Elif Grup Enerji

Technical Due Diligence

Yılmaz Ulusoy Holding

Technical Due Diligence

Boydak Holding

Telli – I Div. Weir and HEPP

Asa Enerji

Tüfekçikonağı HEPP

B. Ergünler Yol Yapı

Ulusal I – II HEPP

Ulusal Enerji

Bağıştaş 2 Dam ve HEPP

Unit Investment NV

Vizara Div. Weir and HEPP

Yılmaz Ulusoy Holding

Yedigöl HEPP ve Aksu HEPP

Makyol İnşaat - Borusan - EnBW

Recent Works

(11)

You can quickly access

on your mobile phone

Here you can also

access our detailed

brochure.

prosem.biz/pdf/hes-ver2013a_en.pdf

http://prosem.biz/pdf/prosem_en.pdf

facebook

prosembiz

twitter

@prosembiz

linkedin

prosem

Hydropower

(12)

This brochure was prepared by Prosem Engineering.

rev

References

Related documents

control study of clinical performance of two supraglottic airway devices,. IGEL AND PROSEAL LMA in 60 adult women, ASA I AND II,

Obce vykonávají svou činnost ve školství jak v samostatné působnosti, tak i v přenesené. Těžiště samostatné působnosti spočívá ve zřizování škol a

Methods: In this prospective, randomized, double-blind, controlled study on 90 ASA I/II patients undergoing elective abdominal hysterectomy patients were randomly allocated

 ASAM Level I Outpatient Treatment (including brief interventions) ASAM Level I Outpatient Treatment (including brief interventions)  ASAM Level II Intensive Outpatient

Esasen İran medeniyeti ,daha Türkleri kendine cezb etmeden evvel İslamiyet üzerinde büyük tesirler yapmıştı.Abbasiler saltanat telakkisi ve devlet teşkilatı

We document how the changes in (i) the number of items, (ii) demand levels, (iii) fixed order costs, (iv) holding costs per unit volume per unit time, (v) per truck capacity, and

(I)(c)(ii) Statement showing holding of securities (including shares, warrants, convertible securities) of persons (together with PAC) belonging to the category “Public” and

16. The following scheme of reconstruction has been approved for Bheema Ltd. a) The Shareholders to receive in lieu of their present holding at 1,40,000 shares of Rs. ii)