• No results found

Analysis of pavement condition survey data for effective implementation of a network level pavement management program for Kazakhstan

N/A
N/A
Protected

Academic year: 2021

Share "Analysis of pavement condition survey data for effective implementation of a network level pavement management program for Kazakhstan"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Framework of the proposed methodology.
Figure 2. Implementation of LRS and GPS matching procedures at the network level. 
Table 1. Correspondence between the IRI and RCI rating scales.
Table 2. Equivalent Standard Axle Load ESAL per vehicle category group Kazakhstan full traffic spectrum.
+5

References

Related documents

Conceptually, motion brushes expand existing brush models by incorporating hierarchies of 3D animated content including geometry, appearance information, and motion data as core

one technique than can help trace tools to cope better with huge traces. However, multi-level visualization tools need a good support for data abstraction techniques, to reduce

Krzysztof Kołowrocki, European Critical Infrastructures Safety Management System - Research Project Idea Kazimierz Kosmowski, Functional Safety and Reliability Methodology for

In view of the scope of the projects in which Montea invests, there is the risk that it might become too dependent on the continued existence of a particular property entity or

9:00 pm Grand opening of the competition Martime Academy Department of Navigation Building - Auditorium Maximum Hall President of

** Stallions that jump 2 clear rounds at CSI2* level or produce 2 progeny that jump 2 clear rounds at National Grand

• Watertight IP69K according to IEC 60529 • 16 High Power Infrared LEDs 850nm • Shockproof and vibration resistant • -40° to +85° C operating temperature.

conformance may be raised formally to a level 1 or level 2 non-conformance, depending upon the severity of the performance failure. It is possible for a number of level 1 and/or