GRID

Alstom Grid

Analyst Day

Nantes 28th February 2013

Grégoire Poux-Guillaume

(2)

2

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(3)

3 • Overheads cost

synergies

• Use of Global Power Sales network

• ALSTOM Group a Top 5 customer

Grid successfully integrated within ALSTOM

THERMAL POWER

RENEWABLE POWER

• Boost local presence of Grid Services leveraging Thermal Services sites • GCB and e Bop offering

to connect power plants • Automation & control

technologies synergies

• Optimised AC and DC solutions for wind farms

• Smart Grid solutions for renewable power generation • Energy storage for solar & wind

through power conversion

GRID

(4)

4

Alstom Grid Scope

What we do

Transformers and Switchgear for HV, and associated service

Automation and Network Management for HV, MV and Smart Cities

Power Electronics (HVDC, FACTS)

EPC to sell products

What we don’t do

Transformers and Switchgear for MV

LV products

EPC for the sake of EPC

(5)

5

* Consolidated for 10 months (from June 2010 to March 2011)

Orders progressing – Book to Bill > 1

Good dynamics on order intake

H1 Book to Bill of 1.2

2 HVDC projects booked LTM

− ca. €250m South West Link in Dec ‘11 − ca. €400m Champa in Aug ‘12

Well balanced by region

Customers slowing down projects,

impacting sales

+18% H1 2012/13 2,180 FY 2010/11* 3,434 FY 2011/12 1,853 H1 2011/12 4,003 H1 2012/13 1,863 1,844 FY 2010/11* 3,653 H1 2011/12 4,013 +1% FY 2011/12 Orders (€ million) Sales (€ million) P 5

(6)

6

Margin resilient despite difficult market conditions

Performance driven by strong

execution and cost optimisation

Ramp-up of sales key to support

performance improvement

218 248 107 113 H1 2012/13 +6% 6.1% H1 2011/12 5.8% FY 2011/12 6.2% FY* 2010/11 6.0%

* Consolidated for 10 months (from June 2010 to March 2011)

Income From Operation (€ million and % of sales)

(7)

7

Orders mix shifting towards more HVDC and Smart Grid

Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c)

1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b) 1.6 1.7 1.9 10/11 (a) 11/12 12/13 (b) 0.2 0.5 0.7 10/11 (a) 11/12 12/13 (b) 0.3 0.5 0.5 10/11 (a) 11/12 12/13 (b)

• Significant HVDC and Smart Grid increase • Products flat, in line with market trend

• Turnkey mix moving towards more Power Generation, Industry and Oil & Gas

(a) Consolidated for 10 months (from June 2010 to March 2011) (b) 12/13 values are April – Dec 12 linearised over 12 months (c) Automation and Network management

-1%

+10%

+31%

+7%

(8)

8

Europe

40 Manufacturing & Engineering sites

3 R&D Technology centres

30% of global order intake Europe

40 Manufacturing & Engineering sites

3 R&D Technology centres

30% of global order intake

Middle East & Africa

13 Manufacturing & Engineering sites

20% of global order intake Middle East & Africa

13 Manufacturing & Engineering sites

20% of global order intake

Asia

22 Manufacturing & Engineering sites

1 R&D Technology centre

30% of global order intake Asia

22 Manufacturing & Engineering sites

1 R&D Technology centre

30% of global order intake

Industrial footprint and orders balanced

Americas

13 Manufacturing & Engineering sites

1 R&D Technology centre

20% of global order intake Americas

13 Manufacturing & Engineering sites

1 R&D Technology centre

20% of global order intake

(9)

9

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(10)

10

Solid long term market fundamentals

Increase of Renewables within Energy mix

Electricity Consumption & Generation Ageing of the installed infrastructure

Long term Drivers Impact on Grid Market

Medium Low

High Impact of driver on segment

Global Importance

• Main driver for Grid expansion, new substations and related HV products

• Challenge to improve Energy efficiency across the value chain

• Challenge to maintain Grid stability

• Impact on HVDC for interconnections and offshore wind tie-in

• Impact on Smart Grid for renewable energy management systems

HV Products

Segment

Smart Grid ElectronicsPower Service

• Challenge to maintain Grid reliability

• Driver for Replacement market

Source: Alstom P 10

(11)

11 50 40 30 20 60 FY15/16e FY14/15e FY12/13e

Alstom Grid Scope

FY13/14e FY11/12 Conventional AC HVDC Service Smart Grid

€40 billion market with 3% CAGR

• Growth driven by HVDC and Smart Grid

• Conventional AC flat

• Service and Industrial growing faster

CAGR 12/13 – 15/16 1% 28 % 4 % 11 % In € billion

Smart Grid not addressed by ALSTOM: Meters, Telecom for Distribution, MDMS, Secondary Distribution Automation Smart Grid addressed by ALSTOM: Network management systems, Telecom for Transmission, HV and Primary Distribution Automation

HVDC and Smart Grid as key market growth drivers

(12)

12 65 70 75 80 85 90 95 100

Price erosion stabilizing at low level

Price pressure maintained by

− Over-capacity in AC products − EPC contractors packaging

third party equipment

Some disparities between regions

− Anti-dumping in USA for Power Transformers: price increase? − Slight uptick in China

− Price erosion continuing in India

Last 8 awarded

Sources: Alstom, market data

2009 2010 2011 2012 60 65 70 75 80 85 90 95 100 Project 1 (Aug 2008) Project 2 (Aug 2008) Project 3 (Oct 2010) Project 4 (Dec 2010) Project 5 (Mar 2011) Project 6 (Aug 2011) Project 7 (Sept 2011) Project 8 (Dec 2012)

AC price stabilising - at low level

Grid market price evolution

Example: Koweit 400kV GIS S/S

(13)

13

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(14)

14

Strategic priorities

Focus on high value segments and growth drivers

1

HVDC

• Growing market with high barriers to entry • 2 key technologies: LCC and VSC

• Major recent commercial successes in 800kV LCC and VSC

• More to come?

Smart Grid

• 3 priorities

− Control Rooms (market leader)

− Smart Power Electronics

− Substation Automation

• 30 commercial projects, 30 ongoing demonstrators

(15)

15

Strategic priorities

Focus on high value segments and growth drivers

1

Service

• Achieve double digit growth without sacrificing margins • 4 key axes:

− geographical coverage

− Industry & Power generation

− third party services

− asset management

Industry / Oil & Gas

• Reinforce our positioning

• Develop Smart Grid offering and Services

• Comprehensive offer through targeted MV partnerships

• Acquisition of O&G SCADA company

(16)

16 2012

Commercial successes

Abu Dhabi TRANSCO: 2 GIS substations of 220 kV and 400 kV

India Power Grid: world’s first 1,200 kV optical instrument transformer and disconnector

USAFlorida Power & Light: fleet management for 350 transformers

ChileTranselec: first contract for 550 kV GIS substation

GermanyTennet and TransnetBW: MSCDN system and switchgear panels for TransnetBW

AustraliaChevron: substations for Oil & Gas Wheat Stone project

• Portfolio extended with GIS 420 kV Single chamber and AIS dead tank 362 kV

• World’s largest special Industrial transformer

built by Gebze factory for German Railways

• Green offering strengthened with VL 109 72.5 kV Vacuum Circuit Breaker

• First sales of new Resin Impregnated Paper (RIP) 245kV bushing technology

Digital substationsin France and Russia

DC Circuit Breaker prototype successful tests with RTE

2012

R&D successes

… while remaining a key player on AC business

(17)

17

Strategic priorities

Key partnerships to support and expand growth focus

China: commercial and technology partnership with Shandong (SGCC)

for 800/1,100 kV DC Transformers • Korea: 49/51 JV with KEPCO to

serve local HVDC market (Oct 2012) • Russia: 50/50 JV with KER to serve

local HVDC market

France: DC converter solutions with CEA (July 2012) and industry

initiative for Supergrid (IEED)

Cisco (USA): communications and data protection solutions for digital substations (Sept 2012) • Toshiba / Landis & Gyr (Japan):

smart grid solutions for

distribution systems (Sept 2012) • Cap Gemini: cloud-based

solutions and control room IT integration (Jan 2013)

Itron: smart metering integration • Saft: battery storage

Bouygues: smart buildings

2

P 17

(18)

18

Strategic priorities

Cost optimisation to offset price pressure in AC

• Double digit % cost reduction

– Redesign-to-cost on HV Products – New product introduction

– Major quality initiative

• Drive down S&A

– HQ downsized

– Sales efficiency programme – Organisation simplification • Sourcing Transformation

– Sourcing in R&D and tender stages – Supplier panel rationalisation

3

• Adapt to market

– 4 sites being closed

(Mexico, Australia, China x 2) – Rationalisation in Europe

Site redeployments Product Cost Optimisation

Sourcing leverage Overhead reduction

(19)

19

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(20)

20

9

3

2011/12 2020/21e

• Market divided into 2 technologies

− Line-commutated converters (LCC)

− Voltage-sourced converters (VSC)

• Solid key drivers: bulk power transfers, renewable energy integration, Supergrid development

• Increased country interconnections in specific markets (Europe, Middle-East, North America)

• Race for higher voltages (800kV+) in China and India

• Offshore wind essentially in Europe

VSC LCC

Source: Alstom

In € billion

HVDC market to triple in 10 years

HVDC market Market Trends

Technology breakdown next 3 years

(21)

21

LCC Back-to-back LCC Point-to-point

VSC

McNeill: 150 MW

Nelson River OHL: 3,000 MW

Dürnrohr: 380 MW IFA2000 (Fra/UK): 2,000 MW Konti-Skan 1: 380 MW SACOI: 380 MW South West VSC: 2x720 MW China-Russia: 750 MW Lingbao II: 750 MW 3G-Shanghai II: 3,000 MW Nindong-Shandong: 4,000 MW Cheju-Haenam: 300 MW Cheju-Jindo: 400 MW GCCIA: 3x600 MW Cahora Bassa: 1,920 MW Chandrapur: 2x500 MW Vizag: 500 MW Sasaram: 500 MW Champa: 3,000 MW Rivera: 70 MW Melo: 500 MW Rio Madeira: 3,150 MW

Alstom Grid HVDC

> 30 GW installed, 50 years of experience

Source: Alstom P 21

(22)

22 Porto Velho Araraquara Sao Paulo Kurukshetra Champa

Rio Madeira (Brazil): the longest DC line in the world (2,375 km)

− Technology: LCC

− 600 kV - 3,150 MW

− Contract award: 2009 – Completion 2013

Champa (India): a reference in 800 kV

− Technology: LCC

− 800 kV - 3,000 MW

− Contract award: August 2012 – Completion 2015

South West Link (Sweden): world’s first multi-terminal VSC

− Technology: VSC

− 300 kV - 1,440 MW

− Contract award: December 2011 – Completion 2015

Phase 2

Phase 1

Alstom Grid HVDC

Main projects in execution

(23)

23

Target ~€2.5 billion orders over the next 3 years

− Break into offshore wind (Germany, Baltic Sea)

− Leverage partnerships for entry in Korea, China and Russia

− Build talent base: R&D, Engineering, Project Management

Be at the edge of innovation in both technologies

Integrated offering up to 1,100 kV (valves + converter transformers+ bushings)

Stafford Centre (UK): HVDC / UHVDC equipment up to 1,100 kV

4 Transformer units qualified to 800 kV

Create world-class reference with Svenska Kraftnät (Sweden)

VSC 2nd Generation under developmentControlled development in offshore

LCC VSC

Alstom Grid HVDC

Ambition: sustainable 20+% market share

(24)

24

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(25)

25

39

20

€ 20 billion market with T&D

contributing to the bulk of it

Market driven by

− Renewable integration (intermittency)

− Need to reduce consumption peaks

− Increasing distributed generation

− EV integration

− Requirements for more cyber security

Source: Alstom

Smart Grid market to double in 10 years

Global Smart Grid market (in € billion) 2012 2020e Homes Buildings T&D Generation P 25

(26)

26

Segment ALSTOM Grid

Presence Control Rooms Telecom SAS-DA Smart Meters Power Electronics 2012 2020e 9% 4% 4% 16% Power Electronics SAS-DA Control Rooms Telecom 7% 12% Smart Meters 21 10

Full ALSTOM offering No ALSTOM offering

Alstom Grid Smartgrid

Present across the value chain

Smart Grid T&D market (in € billion)

CAGR

Source: Alstom P 26

(27)

27

Alstom Grid Smartgrid

Leader in Control Room applications

# 1 in Control Rooms

Over €40 billion transactions per year on our systems

> 70% of USA deregulated markets

Online Stability Renewable Integration Integrated DMS / Demand Response

Smart-Cities

Continuous integration of new control room applications

(28)

28

Alstom Grid Smartgrid

Deploying its solutions all across the Grid

Digital substation Energy Storage Distribution Automation

Leading innovator in automation and

storage for the grid

> 1,000 HV substations equipped

Extension towards new distribution automation and storage

(29)

29

EU DERMS (Grid4EU)

Alstom Grid Smartgrid

Joint innovation through strategic demonstrations

ERDF DERMS (Vendée) ERDF DERMS (NiceGrid) Veolia DERMS (Reflexe) GDF Suez EMBIX (Greenlys) GDF Suez DERMS (smart campus) Pilots Issy Les Moulineaux EMBIX (IssyGrid) Duke Energy DERMS (DOE) RTE Digital Substation WPD Distribution Automation (Falcon) UKPN Distribution Automation (FPP) SNCF / Econoving Program Gare CEA Meshed DC (Winpower) ESB Fast Charging DC (Green e-motion) EU DC breakers, WAMS (Twenties1) MEW - Kuwait DRMS MEW - Kuwait On-line Asset Innovation, Prototype Philadelphia

DERMS (Navy yard)

Strategy, Early Concept

BOUYGUES EMBIX (Eco2charge) EDF DRMS B2C Twenties + (WP2013) EU EMBIX (Cooperate) Infrax DERMS (Slim) BPA DRMS (DOE) ELIA Online Stability (AFTER) ELIA DERMS (e-storage) P 29

(30)

30

Alstom Grid Smartgrid

Ambition: double digit growth

End-to-end offering for Transmission & Distribution

• Transform our 30 R&D demonstrators into large scale commercial projects

• Consolidate key markets

− USA: Demand Response, integration of renewable energies

− Europe: integration of renewable energies, Smart Cities

• Roll-out of new systems

− Digital Substations (Russia, France)

− Smart control rooms: distributed generation & storage management

• Co-developments on plant flexibility + offshore connections (Alstom Thermal & Renewable)

• Commercial focus: Distribution Automation (Demand Response)

• R&D: converters for renewables and storage, Demand Response IEDs

• Partnerships in Smart Buildings & Cities and public transport (Alstom Transport)

Transmission Distribution

(31)

31

Agenda

I.

Grid within Alstom

IV.

Focus on HVDC

V.

Focus on Smart Grid

II.

Growing but challenging market

VI.

Conclusion

III.

Grid 3 strategic priorities

(32)

32

Conclusion

Well positioned to capture growth

Strong technology offering

Significant R&D spending

Key partnerships in place

Focus on operational excellence

Optimise footprint

Cut overheads

Competitiveness through new or re-designed products

Extract cost savings in sourcing, quality, project execution

Still targeting 8% operating margin

Current market tension will delay but ambition unchanged

References

Related documents

Company: Tanken Teller by Elisabet Thorsell Year:

Declines in the industry have been associated with declines in the provision and maintenance of site facilities, particularly social opportunities for on-site staff (Education

The light shaded region represents the 95% Bayesian confidence interval for the prediction of the streamflow measurement (i.e., the total prediction uncertainty associated

Next estimator, labeled QMLiid, uses the in- correctly speci…ed likelihood function under the assumption of independent disturbances, while the estimator labeled QMLco, uses the

“it is important to take time to celebrate 25 years of Powering Hispanic inclusion by recognizing individuals, corporations and our coalition members who have helped us

After reviewing the state credentialing and professional development requirements for school counselors, there appears to be a missing link between obtaining a credential or

Selected measurements run by Schindler and third parties show that the Schindler 3300 AP elevator can provide an energy efficiency classification in the “green” range from “A”