Capital Expenditure Plans

FY 2015 to FY 2019

October 2014

Division of Planning and Accountability

Finance and Resource Planning

(2)

Texas Higher Education Coordinating Board

Harold W. Hahn, Chair

El Paso

Robert "Bobby" Jenkins Jr., Vice Chair

Austin

David D. Teuscher, Secretary of the Board

Beaumont

Gerald

T.

Korty,

Student

Representative

Fort

Worth

Dora G. Alcala

Del Rio

Sada Cumber

Sugarland

Christopher

M.

Huckabee

Fort

Worth

Jacob M. Monty

Houston

Janelle Shepard

Weatherford

John T. Steen, Jr.

San Antonio

Raymund A. Paredes, Commissioner of Higher Education

Mission of the Coordinating Board

The Texas Higher Education Coordinating Board promotes access, affordability,

quality, success, and cost efficiency in the state’s institutions of higher education,

through

Closing the Gaps

and its successor plan, resulting in a globally competent

workforce that positions Texas as an international leader in an increasingly complex

world economy.

Agency Vision

The THECB will be recognized as an international leader in developing and implementing

innovative higher education policy to accomplish our mission.

Agency Philosophy

The THECB will promote access to and success in quality higher education across the state with

the conviction that access and success without quality is mediocrity and that quality without

access and success is unacceptable.

The Coordinating Board’s core values are:

Accountability: We hold ourselves responsible for our actions and welcome every opportunity

to educate stakeholders about our policies, decisions, and aspirations.

Efficiency: We accomplish our work using resources in the most effective manner.

Collaboration: We develop partnerships that result in student success and a highly qualified,

globally competent workforce.

(3)

Table of Contents

Executive Summary ... 1

An Overview of Facilities in Texas Public Universities, Health-Related Institutions, State, and

Technical Colleges ... 2

The Campus Master Planning Process ... 3

Report Details for FY 2015 – FY 2019 ... 4

Capital Projects Planned FY 2015 – FY 2019 ... 5

Planned Expenditures by Project Type FY 2015 – FY 2019 ... 6

Planned Space Acquisition FY 2015 – FY 2019... 7

Expenditures Planned For FY 2015 – FY 2019 ... 8

Projected Financing Types FY 2015 – FY 2020 and Beyond ... 9

Funding Sources FY 2015 – FY 2019 ... 10

Appendix A – Projects Submitted by Institution and Type ... 11

Appendix B – Planned New Space by Institution (New Construction and Additions) ... 36

(4)

1 THECB Oct 2014

Executive Summary

Section 61.0572 of the Texas Education Code requires that the Texas Higher Education

Coordinating Board (THECB) collect information on the capital expenditure plans of public

universities, health-related institutions, state, and technical colleges. This includes information

on the institution’s new construction, major repair and rehabilitation projects, and deferred

maintenance needs.

For a number of years, many higher education institutions had been required to submit their

capital expenditure plans to both the THECB, in the form of the Master Plan (MP1), and to the

Bond Review Board (BRB), in the form of the Capital Expenditure Plan. In response to the

General Appropriations Act of the 77th Texas Legislature, this redundant reporting of

institutional capital expenditure plans was eliminated. Institutions now report to the THECB,

which in turn, shares the data with the BRB.

Institutions were required to submit capital projects greater than $1 million planned for the

Fiscal Year (FY) 2015 – FY 2019 reporting period. Because some of these projects start later in

the reporting period, the financing of the project may continue into FY 2020 and beyond.

Therefore, this report refers to capital projects that will be undertaken during the FY 2015 –

FY 2019 reporting period, but may be financed in FY 2020 and beyond.

Highlights of this summary for FY 2015 – FY 2019 include plans for:

813 capital expenditure projects over the next five years for a total of $21.1 billion.

65 million Gross Square Feet of space to be acquired, constructed, or renovated.

$13.7 billion (65 percent) of new construction projects accounts for projected

expenditures and will add over 36.7 million gross square feet to facilities’ inventories.

$4.9 billion in major renovations for almost 23.7 million gross square feet.

75 infrastructure projects at $695 million.

1073 acres of property to be acquired at $356 million. Additional property acquisitions

reported in new construction, addition, repair, and renovation projects would add an

additional 114 acres.

Six information resources projects at $406 million.

$4.2 billion in tuition revenue bonds accounting for 20 percent of total funding.

$5.1 billion (24.4 percent) of projects funded with an “unknown or unspecified funding

source” (see Table 1).

$516 million (2.5 percent) of total projects funded from the Higher Education Fund.

$758 million (3.7 percent) of projects funded from the Permanent University Fund.

$718 million (3.5 percent) of projects funded with Auxiliary Enterprise Revenues.

(5)

2

THECB Oct 2014

An Overview of Facilities in Texas Public Universities, Health-Related Institutions,

State, and Technical Colleges

This report provides information about facilities at Texas public universities, health-related

institutions, state, and technical colleges. Texas public community colleges are state-assisted

institutions that must support their facilities from local funds or ad valorem tax funds, so their

facilities do not require the THECB’s review and are not included in this report.

The space requirement for institutions of higher education has increased with enrollments. In

recent years, state government revenues have struggled to meet needs. As a result, the

Legislature in 2003 permitted higher education institutions to set a portion of undergraduate

tuition rates, in part to address deficiencies in facilities’ condition. As enrollment growth

continues, institutions must address the needs of their existing facilities as well as provide

additional capacity on their campuses. Additionally, with the focus on

Closing the Gaps

by 2015

,

the quality of facilities can attract and retain high-caliber faculty and research dollars.

A college or university campus consists of many different types of facilities. The composition of

these facilities can be general, such as those that house classrooms, libraries, and offices.

Others serve various research, agricultural, and athletic functions. Bookstores, student unions,

cafeterias, and residence halls make up the ancillary buildings needed to support a better

learning environment. In general, facilities are categorized as follows:

General Purpose Buildings – classroom, laboratory, office and research buildings, and

any other buildings related to the administration of these functions.

Auxiliary Services – student unions, infirmaries, bookstores, intercollegiate athletics

buildings, parking garages, and similar self-funding facilities.

Physical Plant Buildings – power plants, maintenance facilities, and all buildings related

to the physical plant.

Agricultural Services Buildings – facilities for housing livestock, barns, and silos.

Residence Facilities – dormitories, fraternity houses, apartments, and family housing.

Hospitals/Clinics – medical-related facilities.

Renovations – facilities that are temporarily taken out of service for major repair and

(6)

3

THECB Oct 2014

The Campus Master Planning Process

The Texas Education Code, Section 61.0582, gives the THECB responsibility for collecting

planning information from institutions of higher education and using that information for

evaluating and approving campus construction and land acquisition projects.

Accordingly, Section 17.101(2) of the Coordinating Board’s rules and regulations states that

“Institutions of higher education shall submit current data to the Board for the following

reports:

(A)

Facilities Development Plan (MP1). On or before July 1 of every year, beginning

in 2004, an institution shall submit an update to its Facilities Development Plan

(MP1) on file with the Board, as required by Texas Education Code, Section

61.0572(b)(4). In every even-numbered year, the Board shall provide Facilities

Development Plan data to the Bond Review Board for inclusion in the Capital

Expenditure Report. This report may include capital renewal and deferred

maintenance projects. The report shall include:

(i)

any proposed new construction greater than $1,000,000, repair and

rehabilitation greater than $1,000,000, information resource project

greater

than

$1,000,000, and property purchases for any amount that

may be submitted within the next five years to the Board, regardless of

funding

source;

(ii)

the funding source for any planned project identified in paragraph 2(A)(i)

of this section; and

(iii)

a description of the proposals the institution plans to finance with the

Higher Education Fund or Permanent University Fund.

In addition to the Facilities Development Plan (MP1), other reporting required of higher

education institutions include an annual Campus Condition Report, an annual submittal of the

Campus Facilities Inventory, and an annual Project Status and Tracking Report.

Senate Bill 215 (83d Texas Legislature, Regular Session) made sweeping changes to the

Coordinating Board’s role in capital projects. Specifically, the THECB no longer approves or

disapproves capital projects; the role is now to create standards and assess compliance in the

area of cost, efficiency, space need, and space use. In the event a project does not comply with

the published standards, the THECB has the responsibility to notify legislative leaders as well as

the office of the Governor. In addition to reviews for compliance, the THECB will continue to

conduct the onsite campus Facilities Audit to verify the accuracy of the institutional facilities

inventory and approved facilities development projects for each of those institutions.

(7)

4

THECB Oct 2014

Report Details for FY 2015 – FY 2019

This report summarizes the MP1 reports filed in July 2014 and covers planned capital projects

for FY 2015 – FY 2019. Financial information for these projects was collected for the five-year

reporting period of FY 2015 – FY 2019. Because some capital projects extend beyond the

five-year reporting period, respondents were requested to include expenditures for FY 2020 and

beyond as well. This report summarizes planned construction projects, as reported by

institutions, for the next five years. The institutions have been encouraged to view this process

as an instrument to assist them in their long-range facilities planning. The funding types and

financing sources are not all-inclusive because future funding is uncertain. The MP1 thresholds

are $1 million for new construction and $1 million for renovations, and property purchases that

would cumulatively total $1 million. In addition, information resource projects are required to be

included if they cost more than $1 million even though Board consideration is not required. Prior

to the consolidation of the THECB’s report and the Bond Review Board’s report, the MP1 data

were collected in October of each year. The Bond Review Board’s reporting deadlines required

the THECB to move its MP1 submission date to July 1.

For planning and reporting purposes, facilities-related projects are classified within the following

project types:

New Construction – Construction of a new building on a site where no building had

previously existed or on a site on which a building has been demolished. Additions to

existing buildings are a separate category and not considered new construction.

Repair and Renovation (R&R) – A project in which a portion of the building is

renovated. The classic R&R project involves gutting an existing building and replacing

electrical, plumbing, heating, ventilation, and air-conditioning systems and other major

components.

Additions – Additions to existing buildings that will expand the available square footage of

the structures.

Information Resources – Purchase or installation of information technology resources on

a campus. This includes networks, software, and telecommunications.

Infrastructure – Construction of streets, sewers, electrical systems, steam tunnels, and

other facilities necessary to operate the physical plant.

Land Acquisition – Purchase or acquisition of land, with or without a building structure.

Lease Space – Expenditures to lease space from other entities. Institutions typically lease

space to provide space for new programs while permanent space is being constructed, and

for those short-term projects for which providing permanent space is not cost-effective.

(8)

5

THECB Oct 2014

Capital Projects Planned FY 2015 – FY 2019

The institutions submitted 813 projects in their FY 2015 MP1 capital expenditure plans, which is

up 7 percent from the 763 projects submitted for FY 2014 (Graph 1). New construction projects

represent the majority of all projects at 43 percent, with repair and renovation projects

reporting second at 36 percent. Planned repair and renovation projects are up 24 percent from

234 projects in FY 2014 to 291 projects in FY 2015.

Project Type

FY 2015

FY 2014

Percent Chg

New Construction

352

356

-1%

Repair and Renovation

291

234

24%

Land Acquisition

44

57

-23%

Infrastructure 78

76

3%

Addition

41

36

14%

Information Resources

6

4

50%

Leased Space

1

0

100%

813

763

7%

New Construction,

46.7%

Repair and

Renovation, 30.7%

Land Acquisition,

7.5%

Infrastructure,

10%

Addition, 4.7%

Information

Resources, 0.5%

Graph

 

1

(9)

6

THECB Oct 2014

Planned Expenditures by Project Type FY 2015 – FY 2019

Total cost of all projects submitted in the FY 2015 MP1 reports is over $21.1 billion, which is up

10.4 percent from last year’s $19.2 billion (Graph 2). There are $13.7 billion in new construction

projects planned, which represents 65 percent of the total cost. Planned repair and renovation

projects increased from $3.8 million in FY 2014 to $4.9 million this year.

Project Type

FY 2015

FY 2015 PCT

FY 2014 PCT BPS CHG

New Construction

$13,724,873,030

64.87%

65.57%

(70)

Repair and Renovation

4,874,654,290 23.04%

19.75%

328

Infrastructure

723,578,718

3.42%

4.31%

(89)

Addition 1,017,767,795

4.81%

5.59%

(78)

Land Acquistion

366,150,403

1.73%

2.18%

(45)

Information Resources

406,250,000

1.92%

2.59%

(67)

Leased Space

45,000,000

0.21%

0.00%

21

Total

$21,158,274,236

100%

100%

New Construction

65%

Repair and

Renovation

23%

Infrastructure

3%

Addition

5%

Land Acquistion, 2%

Information Resources, 2%

Leased Space,

0.2%

Graph 2

Planned Expenditures by Project Type

FY 2015 - FY 2019

(10)

7

THECB Oct 2014

Planned Space Acquisition FY 2015 – FY 2019

The institutions submitted 65 million gross square feet (GSF) of space to be constructed,

purchased, or renovated in FY 2015 – FY 2019 (Graph 3). The submitted GSF decreased by

500,000 and the E&G NASF increased by 3 million from the previous reporting cycle.

The institutions plan to add 39 million GSF (60 percent) through new construction and addition

projects, adding 12.8 million educational and general net assignable square feet (E&G NASF) to

current facility inventories. The institutions plan to repair and renovate 23.7 million GSF (37

percent), which is an increase of 4.9 million GSF (26 percent) from the previous reporting cycle.

The institutions submitted 1.7 million GSF for land acquisitions in FY 2015 compared to 2 million

GSF in FY 2014. Planned projects will provide institutions with an additional 1,189 acres of

property. This is down seven percent and 84 acres less from the 1,272 acres reported on the FY

2014 MP1 reports. Of these, 308 of the planned acres are associated with one project listed that

is the estimated space needed for the new UT-Brownsville campus as it separates from Texas

Southmost College.

Project Type

GSF

GSF PCT

E&G

E&G PCT

New Construction

36.71

56.25%

11.96

51.38%

Repair and Renovation

23.66

36.25%

9.92

42.61%

Addition

2.36

3.62%

0.87

3.73%

Infrastructure

0.71 1.08% 0.38 1.62%

Land Acquisition

1.72

2.64%

0.10

0.41%

Leased

Space

0.10 0.15% 0.06 0.25%

Total

65.25

100.00%

23.28

100.00%

New Construction

56%

Repair and

Renovation

36%

Addition, 4%

Infrastructure, 1%

Land Acquisition, 3%

Leased Space

0%

Graph 3

Amount of Space (Gross Square Feet) Planned

FY 2015 - FY 2019 in Millions

(11)

8

THECB Oct 2014

Expenditures Planned for FY 2015 – FY 2019

Of the $21.1 billion in planned expenditures, which includes FY 2020 and beyond, only $16

billion (76 percent) is projected to be financed in the first five fiscal years (FY 2015 – FY 2019),

leaving 24 percent of the financing projected in FY 2020 and beyond. This is $1 billion increase

over the amount financed in the previous reporting period. Fiscal Year 2019 and beyond is not

included in the graph, but is included in the data chart. For this five-year period, FY 2017

accounted for the largest share at $4.2 billion (20 percent of the total expenditures). This trend

of the third year cycle and planned percentage associated with it was almost exactly the same

as was projected in the previous reporting cycle.

FY 2015

FY 2016

FY 2017

FY 2018

FY 2019

Balance *

Percent of Total

10%

16%

20%

18%

12%

24%

Total

2,055

3,381

4,220

3,887

2,556

5,049

Leased Space

-

-

-

2

23

20

Addition

102

165

139

134

133

344

Land Acquisition

56

75

42

61

59

63

Information Resources

111

90

72

74

59

-Infrastructure

190

167

118

79

49

119

Repair and Renovation

387

591

746

564

401

2,186

New Construction

1,207

2,294

3,102

2,973

1,832

2,317

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500

$4,000

Millions

Graph 4

Expenditures Planned by Fiscal Year

FY 2015 - FY 2019

(12)

9

THECB Oct 2014

Projected Financing Types FY 2015 – FY 2020 and Beyond

The $21.1 billion of the planned projects for the next five years and beyond will be financed

using $11.4 billion in revenue bonds, which accounts for 54 percent of the total (Graph 5). This

is up $892 million from FY 2014’s report of $10.6 billion. Over $5.8 billion of the projected costs

have an unspecified financing type (28 percent). The “Other” category accounted for $2.6

billion, down slightly from the $2.7 million reported in FY 2014. This accounts for 12 percent of

the total financing, in contrast to FY 2014’s 14.3 percent.

Revenue

Bonds

Unspecified

Other

Current

Appropriati

ons

General

Obligation

Bonds

Master

Lease

Purchase

Program

Lease

Purchase

-Other

FY 2015

$11.445

$5.881

$2.573

$1.104

$0.141

$0.015

$-FY 2014

$10.553

$5.163

$2.737

$0.555

$0.112

$0.015

$0.030

2015 PCT

54.09%

27.80%

12.16%

5.22%

0.67%

0.07%

0.00%

2014 PCT

55.06%

26.94%

14.28%

2.90%

0.59%

0.08%

0.16%

$0 $2 $4 $6 $8 $10 $12 $14

Billions

Graph 5

Projected Financing Types

FY 2015 - 2020 and Beyond

(13)

10

THECB Oct 2014

Funding Sources FY 2015 – FY 2019

The category of Unknown and Unspecified Funding Sources makes up the largest source of

funds at $5.2 billion (24.4 percent) and indicates institutions’ uncertainty of how capital projects

will be funded in the future (Table 1). Tuition Revenue Bonds represent $4.1 billion (20 percent)

in capital expenditures, which is a 29 percent increase over the previous reporting cycle. Private

Development Funds have decreased to $140 million, which is down 40 percent from the

previous reporting year. There is also a large increase in energy savings as the source of

funding this year.

Table 1

Source of Funds

Source FY 2015 2015 PCT FY 2014 2014 PCT PCT CHG

Auxiliary Enterprise Fund $51,865,381 0.25% $75,349,780 0.39% -31.17%

Auxiliary Enterprise Revenues $718,225,254 3.39% $898,215,235 4.69% -20.04%

Available University Fund $387,225,694 1.83% $275,850,000 1.44% 40.38%

Designated Tuition $279,814,283 1.32% $266,036,549 1.39% 5.18% Energy Savings $19,830,000 0.09% $1,385,000 0.01% 1331.77% Federal Funds $2,500,000 0.01% $41,375,000 0.22% -93.96% Federal Grants $78,746,550 0.37% $26,966,000 0.14% 192.02% General Revenue $77,100,506 0.36% $77,507,043 0.40% -0.52% Gifts/Donations $1,032,195,681 4.88% $945,596,715 4.93% 9.16%

Higher Education Fund Proceeds $515,895,473 2.44% $377,651,556 1.97% 36.61%

Housing Revenue $475,841,056 2.25% $499,695,723 2.61% -4.77%

Lease Purchase other than MLPP $0 0.00% $27,700,000 0.14%

Legislative Appropriations $350,030,692 1.65% $56,320,000 0.29% 521.50%

Master Lease Purchase Program $0 0.00% $2,564,500 0.01%

Other $387,498,916 1.83% $60,525,000 0.32% 540.23%

Other Local Funds $945,450,404 4.47% $999,418,469 5.21% -5.40%

Other Revenue Bonds $143,316,693 0.68% $264,000,000 1.38% -45.71%

Energy Savings Performance Contract $1,000,000 0.00% $17,000,000 0.09% -94.12%

Permanent University Fund $758,304,346 3.58% $793,253,428 4.14% -4.41%

Private Development Funds $140,000,000 0.66% $231,900,000 1.21% -39.63%

Revenue Financing System Bonds $5,034,264,042 23.79% $4,742,250,832 24.74% 6.16%

Student Fees $364,033,820 1.72% $340,442,143 1.78% 6.93%

Tuition Revenue Bond Proceeds $4,191,776,164 19.81% $3,239,907,764 16.90% 29.38%

Unexpended Plant Funds $33,555,627 0.16% $24,248,888 0.13% 38.38%

Unknown Funding Source $3,843,170,000 18.16% $3,595,100,000 18.76% 6.90%

Unspecified $1,326,633,654 6.27% $1,285,782,986 6.71% 3.18%

(14)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

11

THECB Oct 2013

System: Non-System Institution

Institution: Midwestern State University

Land Acquisition AQUISITION OF PROPERTY 9 2014 10,000,000

New Construction ACADEMIC EXPANSION & REVITALIZATION 9 2015 73,000,000

New Construction BASEBALL STADIUM 6 2019 6,000,000

New Construction NEW FACILITIES SERVICES & PURCHASING BUILDING 6 2015 3,000,000

New Construction NEW STUDENT RESIDENCE HALL & HOUSING OFFICE 9 2014 22,000,000

New Construction ON CAMPUS FOOTBALL STADIUM 6 2019 22,000,000

New Construction PARKING FACILITIES 6 2015 7,000,000

New Construction UNIVERSITY POLICE STATION BUILDING 6 2015 1,000,000

Repair and Renovation CAMPUS LANDSCAPE IMPROVEMENTS 6 2016 2,000,000

Repair and Renovation DANIEL BUILDING FOOD SERVICE RENOVATION 6 2016 7,000,000

Repair and Renovation HARDIN BLDG INFRSTRUCTURE RENOVATION 6 2019 10,000,000

Repair and Renovation WEST CAMPUS ANNEX RENOVATION 6 2019 2,000,000

Midwestern State University Subtotal 165,000,000

Institution: Stephen F. Austin State University

Addition Construct Recreation Center Addition 5 2018 10,100,000

Addition Construct Student Center Addition 5 2018 6,000,000

Addition Construct/Renovate Athletic Facilities 1 2017 45,000,000

Information Resources IT UPGRADE 9 2014 5,000,000

Infrastructure Construct Vista Dr./Griffith Blvd Connector Road 5 2018 1,000,000

Infrastructure Renovate Utility Infrastructure 9 2016 4,000,000

Land Acquisition Purchase of Land 9 2014 4,000,000

New Construction Construct Housing Operations Warehouse 5 2016 7,900,000

New Construction Construct New Forestry Lab 5 2018 17,900,000

New Construction Construct New STEM Building 1 2017 60,000,000

New Construction Construct Performing Arts Theatre 9 2016 17,600,000

New Construction Construct Residence Hall 5 2017 29,500,000

Repair and Renovation ENERGY MODERNIZATION 1 2015 5,000,000

Repair and Renovation Energy Modernization 5 2017 10,000,000

Repair and Renovation Renovate Griffith Fine Arts 5 2018 7,100,000

Repair and Renovation Renovate Hall 10 5 2015 4,200,000

Repair and Renovation Renovate Mays Hall 5 2017 4,700,000

Repair and Renovation Renovate Miller Science Labs 1 2017 25,300,000

Repair and Renovation Renovate North Hall 5 2016 2,700,000

Repair and Renovation Renovate Raguet Street Pedestrian Way 5 2018 2,000,000

Repair and Renovation Renovate South Hall 5 2018 2,700,000

(15)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

12

THECB Oct 2014

Repair and Renovation Renovate Wright Music Building 5 2017 6,400,000

Stephen F. Austin State University Subtotal 283,300,000

Institution: Texas Southern University

Land Acquisition NORTHWEST CAMPUS AND LAND PURCHASE 9 2014 5,258,769

Land Acquisition PURCHASE LAND RESERVED FOR FUTURE USE 1 2015 7,011,342

New Construction AUXILIARY FACILITIES 9 2014 53,705,718

New Construction H &PE ANNEX & INTRAMURAL SPORTS 1 2015 6,228,567

New Construction HUMANITIES & FINE ARTS BUILDING 9 2014 64,276,758

New Construction LAW SCHOOL AND SCHOOL OF BUSINESS BUILDING 1 2016 25,904,868

New Construction ONE STOP ENROLLMENT & COUNSELING 1 2015 4,695,591

New Construction PHARMACY SCHOOL/HEALTH SCIENCES BUILDING 11 2014 69,263,058

New Construction RICHFIELD (DEMOLISH & BUILDBACK) 9 2014 14,222,316

New Construction ROBERT TERRY LIBRARY 9 2014 70,247,859

Repair and Renovation DEFERRED MAINTENANCE 11 2014 29,215,846

Texas Southern University Subtotal 350,030,692

Institution: Texas Woman's University

Infrastructure Sidewalk Infrastructure Upgrades 7 2015 4,000,000

New Construction Construct Denton Campus Parking Garage (East) 1 2016 10,000,000

New Construction Construct New Freshman Dormitory 6 2015 22,342,466

New Construction Construct New Science and Technology Center 2 2015 47,000,000

New Construction Construct New Sophmore Dormitory 6 2015 30,000,000

New Construction Construct New Student Union 9 2015 54,267,143

New Construction Construct Pioneer Field House 8 2015 2,064,000

New Construction Denton Parking Garage (West) 1 2017 10,000,000

New Construction Satellite Utility Plant 1 2016 15,000,000

Repair and Renovation Demolition of Graduate Research Building 1 2018 1,000,000

Repair and Renovation Former Student Union Facility Adaptation 1 2017 8,000,000

Repair and Renovation Old Main Renovation Phase II 9 2015 19,500,000

Repair and Renovation Renovate Undergraduate Lab Bldg. 8 2015 1,500,000

Repair and Renovation Stark/Guinn Envelope 6 2015 1,870,590

Texas Woman's University Subtotal 226,544,199

Non-System Institution Subtotal 1,024,874,891

System: Texas A&M University System

Institution: Prairie View A&M University

Addition Carden Waller Extension 9 2015 1,100,000

Infrastructure Campus Northwest Loop Extension 9 2017 2,000,000

Infrastructure # 9 Water Well and Ground Storage Tank 9 2014 1,600,000

(16)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

13

THECB Oct 2014

Infrastructure Campus Southwest Road Extension 9 2016 1,600,000

Infrastructure Student Parking/Tailgate Lot 9 2014 2,000,000

New Construction Comprehensive Agricultural Complex 9 2015 8,000,000

New Construction Fab Ctr & Capital Improvements 9 2014 35,790,000

New Construction Football Stadium and Athletic Field House 9 2014 50,000,000

New Construction Goat Creamery 9 2015 1,400,000

New Construction Innovation Commercialization Ctr for Entrepreneurs 9 2015 10,000,000

New Construction Track and Field Facility 9 2014 2,000,000

Prairie View A&M University Subtotal 116,990,000

Institution: Tarleton State University

Addition Memorial Stadium Expansion 9 2014 24,000,000

Infrastructure Campus Street Repairs 9 2014 25,000,000

Infrastructure Construct West Side Central Loop 9 2019 6,000,000

Land Acquisition Property 2015 9 2016 1,276,270

Land Acquisition Property 2016 9 2015 1,219,060

Land Acquisition Property 2017 9 2016 1,229,630

Land Acquisition Property 2018 9 2017 8,173,070

New Construction Applied Sciences Building 1 9 2016 75,000,000

New Construction Applied Sciences Building 2 9 2016 70,000,000

New Construction Aquatic Center 9 2017 7,000,000

New Construction Midilothian Building 9 2015 15,000,000

New Construction Parking Garage 9 2016 17,000,000

New Construction Southwest Metroplex Building 9 2014 55,000,000

Repair and Renovation Rehab Ag Center Facilities ( 9 buildings) 9 2018 4,800,000

Repair and Renovation Rehab Kinesiology (Health & Phys. Ed.) Bldg. 9 2018 16,800,000

Tarleton State University Subtotal 327,498,030

Institution: Texas A&M International University

Addition ADDITION TO SCIENCE CENTER 9 2017 14,000,000

Addition ART STUDIO/ASSEMBLY HALL ADDITION 9 2017 40,000,000

Addition RECREATION CENTER ADDITION AND FIELD 9 2014 3,998,000

Addition UNIVERSITY POOL 9 2015 2,000,000

Addition WESTERN HEMISPHERIC TRADE CENTER ADDITION 9 2015 5,000,000

New Construction BASEBALL COMPLEX 9 2014 14,000,000

New Construction BORDER CENTER FOR HOMELAND SECURITY 9 2016 70,000,000

New Construction CLASSRM/LAB & SUPPT SVCS BLDG/LIBRARY RENOVATION 9 2015 69,000,000

New Construction KINESLGY RENOV/COVOCATION & INFRASTRUCTURE ADD. 9 2015 66,000,000

New Construction TENNIS COURT COMPLEX 9 2014 6,000,000

(17)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

14

THECB Oct 2014

Institution: Texas A&M University

Addition COMMONS BUILDING RENOVATION AND ADDITION 9 2014 32,000,000

Addition STUDENT RECREATION CENTER ADDITION/RENOVATION 9 2014 54,000,000

Addition TEES: BRAYTON FIRE FIELD EXPANSION 9 2014 4,500,000

Infrastructure CAMPUS STORM WATER IMPROVEMENTS 9 2014 5,000,000

Infrastructure CAMPUS WATER SYSTEMS IMPROVEMENTS 9 2014 5,000,000

Infrastructure FY14 UTILITY PRODUCTION UPGRADE 9 2014 20,173,400

Infrastructure FY15 UTILITY PRODUCTION UPGRADE 9 2014 7,388,599

Infrastructure WEST CAMPUS HOUSING INFRASTRUCTURE 9 2014 19,000,000

New Construction 21st CENTURY CLASSROOM BLDG & CLASSROOM RENOV 9 2015 100,000,000

New Construction BSL-3 LABORATORY FACILITY 9 2015 95,000,000

New Construction CENTER FOR INFRASTRUCTURE RENEWAL 9 2015 65,000,000

New Construction COMPUTER DATA CENTER 9 2014 6,750,000

New Construction CONSTRUCT MUSIC FACILITY 9 2015 39,000,000

New Construction CONSTRUCT PARKING GARAGE #6 9 2014 27,200,000

New Construction ENGINEERING EDUCATION COMPLEX 9 2013 137,000,000

New Construction HUMAN CLINICAL RESEARCH FACILITY 9 2014 12,900,000

New Construction SOFTBALL ATHLETIC FACILITY 9 2014 14,000,000

New Construction TAR: AGRICULTURE AND LIFE SCIENCES BLDG. #4 9 2014 32,500,000

New Construction TVMDL: TEXAS A&M VETERINARY MEDICAL DIAGNOSTIC 9 2014 50,000,000

LABORATORY

New Construction Unmanned Aerial Vehicles Test Facility 9 2014 1,000,000

New Construction WEST CAMPUS COMMONS BUILDING 9 2014 17,000,000

Repair and Renovation COMPLETE CORPS DORMS RENOVATIONS 9 2014 115,660,000

Repair and Renovation REIMAGINE THE LIBRARIES PHASE 3 9 2014 7,000,000

Repair and Renovation RENOVATE BRIGHT FOOTBALL COMPLEX BUILDING 9 2014 16,000,000

Repair and Renovation RENOVATE CATER-MATILL HALL 9 2013 6,732,000

Repair and Renovation RENOVATE CHEMISTRY 1972 WING 9 2014 4,585,000

Repair and Renovation TEES: GALVESTON FACILITY IMPROVEMENTS 9 2014 2,232,396

Repair and Renovation TEES: REPAIR TEEX MESQUITE FACILITY 9 2015 500,000

Repair and Renovation TEES: REPAIR TEEX SAN ANTONIO FACILITY 9 2015 500,000

Repair and Renovation TRACK AND FIELD ATHLETIC FACILITY RENOVATION 9 2014 25,000,000

Texas A&M University Subtotal 922,621,395

Institution: Texas A&M University - Commerce

New Construction New Library and Center for Educational Innovation 9 2015 60,000,000

New Construction Nursing and Health Sciences Building 9 2015 60,000,000

Repair and Renovation Campus ADA Improvements 9 2015 1,800,000

(18)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

15

THECB Oct 2014

Institution: Texas A&M University - Corpus Christi

Addition Learning Resources Center Expansion 9 2016 30,000,000

Infrastructure Bridge Construction 9 2018 30,000,000

New Construction Arts & Media Building 9 2016 50,000,000

New Construction Convocation Center 9 2017 101,250,000

New Construction Engineering and Life Sciences Building 9 2016 120,000,000

New Construction Health Center 9 2017 25,500,000

New Construction Momentum Campus Sports Complex - Phase II 9 2016 10,000,000

New Construction Parking Garage 9 2015 25,000,000

Texas A&M University - Corpus Christi Subtotal 391,750,000

Institution: Texas A&M University - Kingsville

Land Acquisition PROPERTY ACQUISITIONS 9 2016 2,500,000

New Construction CONVOCATION CENTER 9 2018 50,000,000

New Construction EDUCATIONAL COMPLEX (STEM and MUSIC) 9 2015 93,000,000

New Construction INTRAMURAL FIELDS & TENNIS COURTS 9 2014 7,000,000

New Construction KINESTHETIC STUDIES FACILITY 9 2018 15,000,000

New Construction NATURAL RESOURCE/AGRICULTURE EDUCATION COMPLEX 9 2017 52,000,000

New Construction NEW ANIMAL SCIENCE RESEARCH FACILITY 9 2016 8,300,000

New Construction NEW BUSINESS ADMINISTRATION BUILDING 9 2017 30,000,000

New Construction NEW CAMPUS HVAC CENTRAL PLANT 9 2018 30,000,000

New Construction NEW PHYSICAL PLANT BUILDING AND SHOPS 9 2016 6,800,000

New Construction SEALE OFFICE BUILDING 9 2014 7,700,000

New Construction STUDENT UNION BUILDING EXPANSION 9 2017 48,250,000

New Construction TECHNOLOGY LEARNING CENTER 9 2017 47,000,000

Repair and Renovation ATHLETIC STADIUM ADA SEATING AND LIGHTING 9 2014 3,500,000

Repair and Renovation ATHLETIC STADIUM RENOVATION 9 2017 20,000,000

Repair and Renovation BUSINESS ADMIN BUILDING RENOVATION 9 2016 4,500,000

Repair and Renovation CAMPUS GROUNDS REDEVELOPMENT 9 2014 1,000,000

Repair and Renovation CAMPUS PAVEMENT/PARKING 9 2014 200,000

Repair and Renovation COUSINS HALL RENOVATION 9 2018 3,950,000

Repair and Renovation DRAMA/ART BUILDING 9 2018 2,000,000

Repair and Renovation ECKHARDT HALL RENOVATION 9 2016 3,500,000

Repair and Renovation HILL HALL RENOVATION 9 2016 5,000,000

Repair and Renovation HOWE AG BUILDING RENOVATION 9 2017 2,500,000

Repair and Renovation HUMAN SCIENCE BUILDING RENOVATION 9 2017 2,000,000

Repair and Renovation LOFTIN HALL-CONNER MUSEUM RENOVATION 9 2018 3,800,000

Repair and Renovation ST THOMAS AQUINAS RENOVATION 9 2014 400,000

(19)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

16

THECB Oct 2014

Institution: Texas A&M University - Texarkana

New Construction Academic and Laboratory Learning Center 9 2016 40,000,000

New Construction Student Engagement and Recreation Center 9 2015 15,500,000

New Construction University Housing Phase II 9 2016 24,000,000

Texas A&M University - Texarkana Subtotal 79,500,000

Institution: Texas A&M University at Galveston

Addition Library Expansion 9 2016 18,500,000

Addition PE Facility Expansion & Athletic Fields 9 2015 6,800,000

Land Acquisition Chouest Warehouse and Dock Purchase 9 2015 5,000,000

New Construction Expansion of Facilities, Infrastructure, & Plant 9 2015 134,000,000

New Construction New Student Center 9 2017 25,000,000

Repair and Renovation Building Assessment Upgrades 9 2015 35,699,800

Texas A&M University at Galveston Subtotal 224,999,800

Institution: Texas A&M University System Health Science Center

Land Acquisition Land Acquisition - Dallas for HPEB Bldg 9 2015 2,863,416

New Construction Alkek Builidng Infrastructure Upgrades-Houston 9 2015 18,000,000

New Construction Animal Resource Unit-Temple 9 2018 15,000,000

New Construction BCD Parking Garage 9 2016 6,000,000

New Construction Bryan Multidisciplinary Research & Education Facil 9 2015 87,000,000

New Construction BSL-3 Facility-TAMU-College Station 9 2015 10,000,000

New Construction Dallas Clinical Dentistry Education Facility 9 2015 126,500,000

New Construction Health Education & Health Policy Building-Bryan 9 2018 50,000,000

New Construction Health Education & Research Building-Kingsville 9 2018 60,000,000

New Construction Health Professions & Educ Bldg Addition-Round Rock 9 2018 9,000,000

New Construction Medical Research & Education 3 - Bryan 9 2018 60,000,000

New Construction Medical Research & Education Building-Temple 9 2017 25,500,000

New Construction Medical Research and Education Building-Houston 9 2016 128,000,000

Repair and Renovation Renovation of Reynolds Medical Sciences Building 9 2017 20,000,000

Texas A&M University System Health Science Center Subtotal 617,863,416

Institution: Texas A&M University Transportation Institute

New Construction TTI: TTI RIVERSIDE RESEARCH BUILDING 9 2014 1,600,000

Texas A&M University Transportation Institute Subtotal 1,600,000

Institution: Texas A&M University-Central Texas

New Construction Multi-Purpose Building III 9 2015 40,000,000

Texas A&M University-Central Texas Subtotal 40,000,000

Institution: Texas A&M University-San Antonio

(20)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

17

THECB Oct 2014

New Construction Central Plant & Recycled Water Connection 9 2015 16,500,000

New Construction General Use Building 9 2015 8,000,000

New Construction Kinesiology/Classroom/Lab Facility 9 2016 41,000,000

New Construction Library/Information Commons Building 9 2016 40,000,000

New Construction Physical Plant and Infrastructure 9 2016 20,000,000

New Construction Science & Technology Building 9 2015 70,000,000

New Construction Student Retention and Success Building 9 2015 31,000,000

Texas A&M University-San Antonio Subtotal 304,500,000

Institution: West Texas A&M University

Land Acquisition Campus Expansion 9 2014 2,000,000

New Construction Acad & Rsrch Facilities for Ag Science & Engr Prog 9 2014 18,000,000

New Construction Bain Athletic Center Phase II (Field house) 9 2014 3,000,000

New Construction Enrichment Center 9 2018 25,000,000

New Construction Nursing and Health Building 9 2017 15,000,000

New Construction Underclassmen Residence Hall - Ph III 9 2016 35,000,000

Repair and Renovation Activities Center Renovation 9 2015 3,000,000

Repair and Renovation Agriculture Science Bldg Renovation 9 2014 3,000,000

Repair and Renovation Amarillo Center - Phase II 9 2014 10,000,000

Repair and Renovation Education Building Exterior Preservation 9 2017 2,000,000

Repair and Renovation MMNH Interior Renovations 9 2016 2,000,000

Repair and Renovation Palo Duro Research Facility Renovation 9 2014 1,000,000

Repair and Renovation Visitor Center 9 2018 20,000,000

West Texas A&M University Subtotal 139,000,000

Texas A&M University System Subtotal 4,028,020,641

System: Texas State Technical College System

Institution: Texas State Technical College - Harlingen

Information Resources All Dormitories Internet Infrastructure 1 2016 1,200,000

Infrastructure Construct Chiller Plant Replacement & Upgrade 10 2015 8,000,000

Infrastructure Purchase Emergency Power Generators and CRAC Units 1 2015 1,200,000

New Construction Coastal Bend Project 1 2017 22,500,000

New Construction New Dorm 1 9 2015 6,000,000

Repair and Renovation Construct Engineering Center Phase 2 10 2015 3,750,000

Texas State Technical College - Harlingen Subtotal 42,650,000

Institution: Texas State Technical College - Marshall

New Construction Health Technology Building 9 2016 3,500,000

New Construction Student Center 9 2019 2,000,000

New Construction Technology Building 9 2019 3,500,000

(21)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

18

THECB Oct 2014

New Construction TSTC North Texas Instructional/Student Services Bu 9 2016 5,000,000

Repair and Renovation HVAC Replacement and Energy Management 9 2018 1,000,000

Repair and Renovation Renovation of North Building 9 2018 1,500,000

Texas State Technical College - Marshall Subtotal 30,300,000

Institution: Texas State Technical College - Waco

Infrastructure Campus Housing Water System Replacement 1 2017 8,800,000

Infrastructure Realignment of East and West Campus Entrances 1 2016 2,000,000

Infrastructure Water Systems (Inflow & Sewage) Replacement 10 2014 8,700,000

New Construction Administration Building 9 2015 5,000,000

New Construction East Williamson County HEC Building 2 1 2015 6,000,000

New Construction Fort Bend Campus Building #1 1 2015 26,644,000

New Construction Fort Bend Campus Building #2 9 2016 14,950,000

Texas State Technical College - Waco Subtotal 72,094,000

Institution: Texas State Technical College - West Texas

New Construction Abilene Industrial Technology Center 9 2015 18,000,000

Repair and Renovation Capital Improvement Projects 9 2015 1,177,380

Texas State Technical College - West Texas Subtotal 19,177,380

Institution: Texas State Technical College System

New Construction Statewide Emergency Command and Com Center 9 2015 2,000,000

Texas State Technical College System Subtotal 2,000,000

Texas State Technical College System Subtotal 166,221,380

System: Texas Tech University System

Institution: Angelo State University

Infrastructure Dr.Robert & Jean Ann LeGrand Multi-Sports Complex 3 2014 1,400,000

Infrastructure Synthetic Turf Intramural Fields 5 2014 1,900,000

New Construction College of Health and Human Services 7 2016 26,700,000

New Construction Engineering Classroom Building 5 2016 10,200,000

Repair and Renovation Academic Building Renovation and Addition 1 2017 23,900,000

Repair and Renovation Carr Hall Office Space Renovation 12 2016 4,200,000

Repair and Renovation Cavness Science Building Renovation 6 2017 33,700,000

Angelo State University Subtotal 102,000,000

Institution: Texas Tech University

Addition Rawls College of Business Addition 8 2015 15,000,000

Infrastructure Utility Infrastructure Upgrade Phase II 1 2015 6,750,000

Infrastructure Utility Infrastructure Upgrade Phase III 6 2018 7,000,000

Land Acquisition Real Property Purchase 8 2015 6,000,000

(22)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

19

THECB Oct 2014

New Construction Indoor Football Practice Facility 1 2016 28,000,000

New Construction Indoor Track Facility 6 2019 45,600,000

New Construction New Data Center 1 2018 21,000,000

New Construction New Residence Hall II 1 2015 50,000,000

New Construction Plant and Soil Sciences Building 6 2014 13,600,000

New Construction Research & Technology Park-Phase I (4th & Quaker) 5 2014 29,045,000

New Construction Research Building (ESB II) 9 2016 97,700,000

New Construction Research Building II in Research Park 1 2018 25,000,000

New Construction Research Building III in Research Park 12 2019 30,000,000

New Construction Synthetic Turf Recreation Fields 9 2014 5,785,000

Repair and Renovation Agricultural Sciences Renovation 6 2018 9,700,000

Repair and Renovation Athletic Facilities Upgrades 1 2018 22,000,000

Repair and Renovation College of Engineering Expansion/Reno (Phase II) 9 2017 67,600,000

Repair and Renovation Doak Hall Renovation and Life Safety Upgrades 12 2019 19,400,000

Repair and Renovation Engineering & Materials Rsrch Ctr Reno (Mass Comm) 1 2015 30,700,000

Repair and Renovation Football Training Facility Renovations 1 2019 24,700,000

Repair and Renovation Library Life Safety Upgrade 1 2015 6,400,000

Repair and Renovation Museum Life Safety Upgrade 1 2016 5,500,000

Repair and Renovation South End Zone Renovation 1 2017 65,000,000

Repair and Renovation Stangel/Murdough Residence Halls Renovation 1 2014 7,568,000

Repair and Renovation United Spirit Arena Renovations 7 2014 4,300,000

Repair and Renovation University College Bldg Research Facility & Green 3 2014 19,316,315

Repair and Renovation Wall/Gates Residence Halls Renovations 1 2017 6,550,000

Repair and Renovation Weeks Hall Abatement and Renovation 9 2018 24,200,000

Texas Tech University Subtotal 699,914,315

Institution: Texas Tech University Health Sciences Center

Addition Abilene School of Pharmacy Addition 9 2014 3,000,000

Addition Clinical & Academic Expansion (HCC) 9 2014 21,800,000

Addition Jenna Welch Expansion 9 2015 4,200,000

Addition Odessa Clinic Building 3rd Floor Expansion 9 2015 2,600,000

Infrastructure Lubbock Infrastructure Improvements 9 2014 5,000,000

Land Acquisition Real Property Purchase - Abilene 9 2014 5,000,000

Land Acquisition Real Property Purchase - Amarillo 9 2014 3,000,000

Land Acquisition Real Property Purchase - Dallas 9 2014 8,500,000

Land Acquisition Real Property Purchase - Lubbock 9 2014 5,000,000

Land Acquisition Real Property Purchase - Permian Basin 9 2014 3,000,000

New Construction Abilene Campus Expansion 9 2014 14,250,000

New Construction Amarillo Panhandle Clinical Sim Center 9 2015 9,750,000

(23)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

20

THECB Oct 2014

New Construction Dental School Building 9 2016 76,300,000

New Construction Lubbock Childcare Center 9 2014 7,700,000

New Construction Lubbock Education, Research & Technology Building 9 2015 45,000,000

New Construction Lubbock Institute on Aging 9 2017 40,700,000

New Construction Lubbock Thermal Energy Plant & Parking Garage 9 2014 45,000,000

New Construction Lubbock VA Clinic 9 2014 64,200,000

New Construction Lubbock West Expansion 9 2015 38,700,000

New Construction Permian Basin Academic Facility 9 2015 19,800,000

Repair and Renovation AMA Renovate Women's Health & Research Institute 9 2015 22,400,000

Repair and Renovation LBK Preston Smith Library Basement Build Out 9 2017 6,400,000

Repair and Renovation Lubbock LARC Expansion and Upgrades 9 2014 18,300,000

Repair and Renovation SW SOP Dallas Renovation 9 2015 4,200,000

Repair and Renovation Various Facility Modernization & Renewal Renovatns 9 2014 5,500,000

Texas Tech University Health Sciences Center Subtotal 485,300,000

Institution: Texas Tech University System

New Construction System Building 1 2015 27,500,000

Texas Tech University System Subtotal 27,500,000

Texas Tech University System Subtotal 1,314,714,315

System: The Texas State University System

Institution: Lamar Institute of Technology

New Construction Student Services Learning Center 11 2016 16,202,972

Repair and Renovation Technical Arts Buildings Renovation/Replacement 11 2015 16,504,638

Lamar Institute of Technology Subtotal 32,707,610

Institution: Lamar State College - Orange

New Construction Construction of a Multi Purpose Center 1 2016 12,500,000

Lamar State College - Orange Subtotal 12,500,000

Institution: Lamar State College - Port Arthur

Infrastructure Campus Central Plant (Phase I) 11 2016 1,500,000

Infrastructure Campus Central Plant (Phase II) 1 2017 7,210,000

Land Acquisition Property Acquisitions 9 2014 250,000

New Construction Allied Health Building Addition 1 2016 9,125,201

New Construction Facility Expansion for Technology Programs 6 2016 10,100,000

Lamar State College - Port Arthur Subtotal 28,185,201

Institution: Lamar University

Addition Cherry Engineering Lab Addition II 9 2017 21,000,000

Infrastructure Campus Infrastruction Upgrade 12 2016 12,000,000

(24)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

21

THECB Oct 2014

New Construction LU Regional Commercialization Center 1 2016 12,200,000

New Construction NEW FACILITIES MANAGEMENT COMPLEX 9 2016 11,760,000

New Construction New Science and Technology Buildling 9 2017 54,000,000

New Construction NEW SOFTBALL FIELD 3 2016 2,600,000

New Construction Performing Arts Center 9 2017 43,200,579

Repair and Renovation Annual Student Housing Refurbishment 5 2016 11,000,000

Repair and Renovation ART BUILDING RENOVATION 9 2016 9,879,102

Repair and Renovation Classroom, Office and Building Upgrades 1 2016 2,000,000

Repair and Renovation HEALTH & HUMAN PERFORMANCE COMPLEX 5 2017 13,117,534

Repair and Renovation Mary & John Gray Library new fire sprinkler system 9 2016 6,000,000

Repair and Renovation Miscellaneos Energy Conservation Projects 6 2016 3,360,000

Repair and Renovation New Administration and Honors Building 11 2015 22,000,000

Repair and Renovation Repurpose Hayes Biology Building 1 2016 8,000,000

Repair and Renovation Setzer Center Re-purpose 9 2016 3,000,000

Repair and Renovation SPEECH & HEARING BLDG. Renovation & ADDITION 9 2016 15,000,000

Repair and Renovation UNIVERSITY THEATRE RENOVATION 9 2017 3,433,688

Repair and Renovation VINCENT-BECK BASEBALL STADIUM RENOVATION 9 2016 5,600,000

Repair and Renovation Wimberlely Building Re-purpose 1 2016 2,000,000

Lamar University Subtotal 266,750,903

Institution: Sam Houston State University

Addition Lowman Student Center Expansion 3 2018 34,500,000

Infrastructure Central Campus Town Creek Storm Water Remediation 9 2018 2,996,712

Infrastructure East Utility Distribution & East Plant Expansion 9 2016 19,997,795

Infrastructure Electrical Distribution for new South Campus 7 2015 5,203,978

Infrastructure Main Campus Domestic Water Upgrade 9 2018 2,547,330

Infrastructure North Off-Campus IT Infrastructure 9 2017 1,517,516

Infrastructure North Utility Distribution Upgrade & Renovation 9 2016 4,407,494

Infrastructure SE Campus Chilled Water Distribution Upgrade 9 2018 1,902,259

Infrastructure SE Campus Utility Distribution Upgrade & Renov 9 2016 2,544,853

Infrastructure South Campus Hot Water Distribution Renovation 9 2017 3,870,089

Infrastructure Storm Water Remediation at Rec Sports Fields -TC17 8 2016 1,800,000

Infrastructure Utility Distribution North Residence Complex 9 2018 1,122,353

Infrastructure Utility Distribution Pirkle to Raven Village 1 2016 2,743,260

Infrastructure Utility Infrastructure Biology Laboratory Bldg 9 2016 2,177,080

Land Acquisition Land Acquisition - Main Campus Expansion 9 2014 5,000,000

New Construction Art Complex 11 2017 34,125,000

New Construction Biology Laboratory Building 8 2016 58,933,673

New Construction Bowers Stadium West Side Improvements 3 2016 23,929,777

(25)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

22

THECB Oct 2014

New Construction Fred Pirkle Engineering Technology Center 4 2015 25,000,000

New Construction Gibbs Ranch Equine Complex 10 2015 10,300,000

New Construction Gibbs Ranch Meat Science Lab 9 2015 1,500,000

New Construction Gibbs Ranch Plant Life Science Field Lab 9 2016 4,216,000

New Construction North Residence Hall Phase 2 2 2019 92,946,419

New Construction Parking Structure at B.K. Marks & Bowers Blvd 10 2019 36,847,138

New Construction Parking Structure Expansion @ Ave I & 17th 2 2019 7,575,000

New Construction South Dining 3 2015 13,200,000

New Construction South District Parking & Infrastructure 7 2014 4,325,000

New Construction South Residential Complex 2 2015 67,400,000

New Construction TDCJ Building 9 2016 27,300,000

Repair and Renovation Beto CJC & Blackwood LEMIT Repurpose 5 2018 2,600,000

Repair and Renovation Dan Rather Building Renovation 9 2014 3,500,000

Repair and Renovation Energy Project Phase 4 8 2015 1,750,000

Repair and Renovation Health & Kinesiology Building Renovation 11 2018 5,411,163

Repair and Renovation Lee Drain Building Renovation 1 2015 3,500,000

Repair and Renovation Music Building Renovation 11 2018 1,806,000

Repair and Renovation Thomason Building Renovation 4 2017 6,390,784

Repair and Renovation University Theater Center Renovation 1 2019 1,500,000

Sam Houston State University Subtotal 570,136,673

Institution: Sul Ross State University

Addition Turner RAS Facility Expansion 10 2018 4,462,967

New Construction Borderlands Research Institute 1 2019 13,227,000

New Construction North Promenade & New Student Housing 8 2019 9,816,693

Repair and Renovation Briscoe Administration Building Renovation 1 2016 8,452,000

Repair and Renovation Campus Access - Phase II - Master Plan 5 2015 3,093,548

Repair and Renovation Campus Access- Phase III - Master Plan 5 2016 2,163,832

Repair and Renovation Fletcher Hall Addition & Renovation 1 2016 8,820,000

Repair and Renovation Industrial Technology Building Renovation 1 2018 6,614,000

Repair and Renovation Jackson Field Renovation 6 2017 3,000,000

Repair and Renovation Kokernot Field 6 2017 2,000,000

Repair and Renovation Kokernot Outdoor Theatres Renovation 10 2017 5,000,000

Repair and Renovation Morelock Academic Building Renovation 1 2017 15,378,958

Sul Ross State University Subtotal 82,028,998

Institution: Texas State University - San Marcos

Addition Bobcat Stadium Expansion: West Side 9 2018 5,061,420

Addition Cogeneration Plant Addition 9 2016 4,055,408

(26)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

23

THECB Oct 2014

Addition Performing Arts Center-Performance Hall & Dance 9 2018 35,000,000

Addition STAR One Expansion 5 2014 15,300,000

Addition Strahan Coliseum Expansion and Renovation 9 2015 49,440,000

Infrastructure Cogeneration Plant Gas Turbines 2 2015 45,000,000

Land Acquisition Land Acquisitions 9 2014 15,000,000

New Construction Alkek Library Repository 2 2015 5,900,000

New Construction Alumni Visitor Center 9 2016 4,990,825

New Construction Baseball/Softball Team Building 9 2015 8,129,557

New Construction Bobcat Stadium Expansion: South End Zone 9 2017 24,000,000

New Construction East West Mall Connection 5 2015 1,212,700

New Construction Education Research & Visitor Center 9 2016 7,000,000

New Construction Engineering & Sciences Building 6 2015 107,012,293

New Construction Music Building 6 2015 56,705,000

New Construction Residence Life Housing: Hilltop Complex 5 2016 147,928,053

New Construction RR Health Professions No. 1 6 2015 67,583,621

New Construction RR Health Professions No. 2 6 2015 37,067,800

New Construction RR Parking Garage 9 2019 32,899,230

New Construction Student Recreation Sports Fields 5 2015 5,000,000

New Construction Vivarium 9 2018 4,000,000

Repair and Renovation Alkek Library Learning Commons 9 2014 2,500,000

Repair and Renovation Alkek Library Renovations 8 2014 8,000,000

Repair and Renovation DHRL: Blanco Hall Renovations 5 2016 25,003,415

Repair and Renovation DHRL: Retama Hall Renovations 1 2017 9,026,199

Repair and Renovation Joann Cole Mitte and Sabinal Renovation 7 2014 6,520,000

Repair and Renovation Jones Dining Hall Renovation 8 2014 23,671,000

Repair and Renovation Lampasas Renovation (4th and 5th Floor) 1 2017 1,998,873

Repair and Renovation LBJ Student Center Renovation 8 2014 15,010,624

Repair and Renovation Old Main Exterior Repairs 9 2018 7,000,000

Repair and Renovation Roy F Mitte Renovations 6 2014 2,750,000

Texas State University - San Marcos Subtotal 815,316,018

The Texas State University System Subtotal 1,807,625,403

System: The University of Houston System

Institution: University of Houston

Addition New Law Center Building & Complex Renovation 1 2016 115,000,000

Infrastructure Cougar Substation & Related Infrastructure Project 1 2015 34,937,000

New Construction MacGregor Development 2 2015 6,000,000

New Construction New Children's Learning Facility 6 2016 12,000,000

New Construction New Fine Arts Building 3 2015 28,000,000

(27)

Appendix A – Projects Submitted By Institution and Type

Project Type

Project Name Estimated Start Date Total

24

THECB Oct 2014

New Construction New Garage Stadium Area 1 2016 16,400,000

New Construction New Health & Biomedical Sciences Building 2 6 2015 165,000,000

New Construction New Moody Towers Residence Hall Replacement 1 2019 85,000,000

New Construction New Multicultural Studies Center 7 2016 27,000,000

New Construction New Quad Housing Replacement 1 2016 90,000,000

New Construction New Research Building at Energy Research Park 1 2016 66,000,000

New Construction New Student Health, Counseling and Career Center 1 2016 21,316,000

Repair and Renovation Renovate AD Bruce Religion Center 1 2015 8,758,000

Repair and Renovation Renovate CRWC Natatorium 9 2014 8,650,000

Repair and Renovation Renovate Energy Research Park - Bldg 3 3 2015 14,300,000

Repair and Renovation Renovate Energy Research Park- Bldg 2 3 2015 6,000,000

Repair and Renovation Renovate Graduate College of Social Work 1 2018 11,163,000

Repair and Renovation Renovate Hofheinz Pavillion 5 2016 78,000,000

Repair and Renovation Renovate Legacy Buildings in the Campus' Academic 1 2016 381,391,000

Repair and Renovation Renovate UC Satellite 1 2015 14,571,000

University of Houston Subtotal 1,222,486,000

Institution: University of Houston - Clear Lake

Infrastructure Bayou Loop Road 9 2015 1,300,000

New Construction Classroom and Office Building 8 2019 66,975,000

New Construction Environmental Institute of Houston Building 6 2017 6,356,000

New Construction Freshmen Housing 1 2015 26,600,000

New Construction Health Sciences and Classroom Building 1 2016 34,200,000

New Construction Recreation and Wellness Center 9 2015 40,296,000

New Construction Research Park Phase I 1 2016 10,500,000

New Construction STEM and Classroom Building 9 2015 120,000,000

Repair and Renovation Dining Facilities Upgrade & Addition 9 2015 6,134,000

Repair and Renovation Renovate Bayou Teaching & Research Science Labs 5 2018 5,977,000

University of Houston - Clear Lake Subtotal 318,338,000

Institution: University of Houston - Downtown

Land Acquisition PROPERTY ACQUISITION - NORTH OF IH10 9 2014 18,000,000

New Construction SCIENCE AND TECHNOLOGY BLDG 9 2015 104,700,000

New Construction STUDENT PARKING GARAGE 9 2015 15,000,000

New Construction STUDENT UNION BUILDING 6 2017 47,025,000

New Construction WELLNESS CENTER 9 2015 41,400,000

University of Houston - Downtown Subtotal 226,125,000

Institution: University of Houston - Victoria

Land Acquisition Land Acquisition - Academic Expansion 9 2015 24,900,000

References

Related documents

Dividend Reinvestment: You can choose to reinvest all or a portion of the regular cash dividends paid on your shares held in the Plan toward the purchase of additional shares

Abstract: This thesis explores image dictionary learning via non-convex (difference of convex, DC) programming and its applications to image reconstruction9. First, the

SIPRI Yearbook 2014 presents a combination of original data in areas such as world military expenditure, international arms transfers, arms production, nuclear forces, armed conflicts

Does early prostate-specific antigen doubling time (ePSADT) after radical prostatectomy, calculated using PSA values from the first detectable until the first recurrence

M Scardamalia, C Bereiter, Knowledge building: Theory, pedagogy, and technology, in Cambridge handbook of the learning sciences , ed. by K Sawyer (Cambridge University Press, New

On 4th September, 2009 the Claimant received a further threatening letter from the Defendant dated 1st September, 2009, and the Claimant’s appointed representative

• The Office of the Data Protection Commissioner advises charities that if an individual is making a credit or laser card donation over the phone they should

“Data Exporter” means any Data Controller located in a Regulated Jurisdiction or Data Processor located in a Regulated Jurisdiction processing Personal Data on behalf of a Data

Capital Expenditure of the companies as per their time phasing plansto be incurred in FY14 has declined to Rs 2.51 lakh crore from the previous year’s total of Rs 3.1 lakh

Listed below are the FY 2022 capital expenditure allocation, split out by Infrastructure and Public Services, Police, Fire and Rescue and Information Technology.. FY 2022

This report brings together the main messages from a workshop held to validate the results of a study on ‘Innovations in new ICT-facilitated Learning Communities’. A large and

Additionally, certain cash deposits have been set aside as collateral for the counterparty‘s exposure to risk of fluctuations on certain derivative and other financing

We are lucky to have some interesting, successful event planners join us for in-depth conversations about their work. To help our guests know that we are engaged, and to make the

Before moving, information will be presented on the strategies employed so far in different countries and their architectures, we move to a study of some aspects of the EHR

• The Texas Education Agency (TEA) and Texas Higher Education Coordinating Board (THECB) should work collaboratively with representatives from colleges and universities,

Section 15 requires the SBEC, in consultation with the Texas Higher Education Coordinating Board (THECB) to develop criteria for evaluating EPPs based on teacher retention and

The purpose of the ALEAP program is to support and serve the needs of adult learners who want to return to or begin college to earn their degree or.. certificate and pursue

Senate Bill 139, 80th Texas Legislature, directed the Texas Higher Education Coordinating Board (THECB) in consultation with the Texas Board of Nursing to conduct a study on improving

NOTES: ACC began reporting student intent data to the Texas Higher Education Coordinating Board in

 Community colleges report contact hour and success points data to the Texas Higher Education Coordinating Board (THECB). THECB compiles the data and provides success points

In any infant with clinical signs of sepsis a full diagnostic evaluation should be done and empirical antibiotic therapy (ampicillin/ amoxicillin or penicillin