• No results found

A great business opportunity is waiting for you.

N/A
N/A
Protected

Academic year: 2021

Share "A great business opportunity is waiting for you."

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

EXPOSITION

Check below the several area and assembly options available.

Promoted by:

R i o d e J a n e i r o | B r a z i l

The Exhibition is held concurrently to the conference, allowing to promote the interaction among the delegates, visitors and companies operating in the pipeline sector.

A great business opportunity is waiting for you.

10

th

EDITION

SUBSEA PIPELINES:

AN IMPORTANT ROLE ON

PRE-SALT DEVELOPMENT

EXPOSITION

Event figures

*Figures regarding the 2013 edition.

100

EXHIBITING COMPANIES

27

COUNTRIES PARTICIPATING

226

TECHNICAL PAPERS

2.200

VISITORS

1.140

DELEGATES

The IBP – Brazilian Petroleum, Gas and Biofuels Institute | Rio Pipeline 2015 - September 22 to 24, 2015 Rio de Janeiro - Brazil | Phone: (55 21) 2112-9079 | Email: riopipeline@ibp.org.br | riopipeline.com.br

Versão em português

(2)

2.1 - Model Basic Assembly - Middle

1. Free net area

Net areas available from 6m². Contact our sales team and choose the area that best fits your company’s needs. In this option, the company is free to develop a booth and assembly design. The assembly and disassembly guidelines can be found in the exhibitor’s handbook.

2. Basic Assembly

Available for booths of up to 50m²

FLOOR 10cm high wooden floor cased with nylon carpet or similar material in gray color, with ramp for wheelchair users. WALLS Laminate partitions in white, applied in aluminum columns in octagonal profile; 1-m² storage area with door. LIGHTING AND

ELECTRICITY

1 spot light with 100W bulbs every 3m, 1 billboard spot light and 2 500W outlets of the universal type, being 1 in the storage area. Power consumption regarding these items is included.

FURNITURE 1 round table with glass top, 4 chairs, 1 reception desk and 1 stool and 1 trash can; 2 shelves in the storage area. BILLBOARD Billboard with company logo, applied in decorative projection item. Corner booths, corner booths’ islands or islands will have two billboards, with logo

(3)

2.2 - Model Basic Assembly - Corner

Available for booths from 25m² up to 70m²

FLOOR 10cm high wooden floor cased with nylon carpetor similar material in gray color, with ramp for wheelchair users.

WALLS

Duraplac-cased dividers or similar material in white, applied in aluminum columns; One enclosed office area, with partitions and

½ glass/½ panel door with pergola ceiling. 3m² storage area located at the back of the booth, closed by TS panels and door.

LIGHTING 1 spot light with 100W bulbs every 3m, 3 billboard spot lightsand 3 500W outlets of the universal type, being 1 in the storage area. Power consumption regarding these items is included.

FURNITURE 1 mini fridge, 1 round table with glass top, 4 fixed chairs, 1 corner table, 2 armchairs, 1 trash can, 1 reception desk-mounted system with inner shelf, door and lock and 1 stool; 2 shelves in the storage area.

BILLBOARD 2m x 0.50m billboard with exhibiting company’s logo. Corner booths, corner booths islands or islands will have two billboards, with logo applied in both sides.

LANDSCAPING 1 cachepot vase with plant.

3. Special Assembly

The IBP – Brazilian Petroleum, Gas and Biofuels Institute | Rio Pipeline 2015 - September 22 to 24, 2015 Rio de Janeiro - Brazil | Phone: (55 21) 2112-9079 | Email: riopipeline@ibp.org.br | riopipeline.com.br

(4)

3.1 - Special assembly - Middle

(5)

Exhibition Hall Floor Plan

The IBP – Brazilian Petroleum, Gas and Biofuels Institute | Rio Pipeline 2015 - September 22 to 24, 2015 Rio de Janeiro - Brazil | Phone: (55 21) 2112-9079 | Email: riopipeline@ibp.org.br | riopipeline.com.br

s ESCADA 17 QS QS Sanitário Feminino Sanitário Masculino Atendimento médico Administration office Service Street Rua de Serviço Sanitário Feminino Sanitário Masculino Sanitário Feminino SanitárioMasculino

E4 A C D E F H 3X39M² SECURITY D7 D4 D6 E2 F1G3 D11 B6 D3 D5 D8 E5 D9 C5 I6 D1 16m² - 4x4 C8 60m² - 5x12 156m² - 13x12 25m² - 5x5 16m² - 4x4 30m² - 6x5 42m² - 7x6 42m² - 7x6 42m² - 7x6 50m² - 5x10 25m² - 5x5 Registration

Access to Mezanine and 2nd Floor

Entrance 46m² - 5x10 39m² - 6,5x6 39m² - 6,5x6 39m² - 6,5x6 39m² - 6,5x6 16m² - 4x4 H10 9m² - 3x3 A1 16m² - 4x4 B H9 I10 16m² - 4x4 H17 18m² - 6x3 118m² - 12x10 H7 A 25m² - 5x5 A3 16m² - 4x4 B1 B5 PETROBRAS A. HAK OMNISENS CANUSA IEC ATMOS OPTEC OIL STATES ROSEN VANASA BUTTING BRASIL SOLAR REVEST. HERRENKNECHT TD WILLIAMSON PETRO & QUIMICA PH DUTOS PIPEW AY WEIR MINERALS TEAM FORUM ENERGY 16m² - 4x4 IBP NACE MTS 72m² - 9x10 16m² - 4x4 PLANT INTEGRITY I1 I4 8m² - 4x2 9m² - 3x3 9m² - 3x3 16m² - 4x4 9m² - 3x3 9m² - 3x3 H30 C4 C2 C7 16m² - 4x4 CTDUT E3 C1 SONDEQ C6 C3 TUBOLIT TECNOFINK ANP H22 18m² - 4,5x4 H20 NDT PEA TERRITÓRIOS DO PETRÓLEO 266m² - 19x14 TRANSNEFT DIASKAN 4PIPE 9m² - 3x3 18m² - 6x3 H26 2m 3m TN PETRÓLEO D15 16m² - 4x4 28m² 4x7 40m² - 4x10 Lounge

Panel «you are here»

3m 2mH12d H12e H12f H12c H12b H12a H12 ABENDI DNVGL ARGENTERA CHERO PIPING BEA GROUP MORKEN PETROBRAS / IBAMA H5 NETWORKING AREA ENGECORR B3 16m² - 4x4

ABRACO NMI OURO NEGRO

ASME 16m² - 4x4 B4 B2 16m² - 4x4 16m² - 4x4 CREAFORM H12e1 H12a1 SIMDUT BALLTEC START UPS PAVILION Food Court Assembly Company Storage Area Publications Display

Access Controlentrance

exit Ele vator ELEVATORS ENTRANCE Men’s Room Women’s Room ACESS SHUTTLE Auditorium

References

Related documents

Floor Cream fitted carpet Good condition  professionally cleaned CZBAMS Walls White emulsion Brown scuff mark to near RHS at low level BH BXV

I felt cold and dizzy (like there was too much of oxygen). My hands were trembling and my head grew heavy. While coming away from the Mirror, the feelings went down. We went off to

Frankston and get forklift licence test victoria to complete training gives you for this class in a sound working knowledge quiz: how long does not load and to drive.. Enrolment

A bail solicitor's license shall not be issued until there is filed with the commissioner an appointment of such solicitor, effective upon issue of the license executed by the

Using the results obtained from the analysis and validation from Fuji film test, cylinder head was modified accordingly to ensure the gasket pressure is enough to withstand

Floor Walls Ceiling MASTER BEDROOM Floor Walls Ceiling OTHER BERROOMS Floor Walls Ceiling BALCONIES Floor Walls Ceiling Parapet Railing BATHROOM Floor Walls Ceiling Counter CP

● Hall, ground floor, open plan, kitchen area, dining area. ● Lighting, ceiling lamps, wall lights. ● Floor, hall area, laminate, colour, oak, stairs, carpet, short pile,.

floor heating element in connection with a wooden floor or similar material, always use a floor sensor and never set the maximum floor temperature to more than 35 °C. Note: