Slide #2

Overview

• ONR’s Current Process/Needs

• ONR’s Award Decision

• Award Structure (Proof of Concept)

• Lessons Learned

(3)

ONR’s Current Process

PR’s created in Legacy System (NAVRIS)

– Commitment sent from NAVRIS to STARS

Contracts created in Microsoft Word

– Contracting Personnel manually enter select data into NAVRIS (including obligation information)

Award Execution in NAVRIS

– Obligation sent from NAVRIS to STARS

Word Document signed and scanned

Send Award info to other procurement/assistance related

systems

– Data clerk manually posts to FPDS

– Select POCs manually post to FedBizOps

– Custom interfaces built for other systems (EDA, DAADS, etc.) -requires manual intervention

(4)

Slide #4

ONR’s General Needs

Contracts AND Grants functionality

FAR/DFARS compliance

Deployment by Oct 2012 (when Navy ERP is deployed at ONR)

Web-based (no client footprint - to eliminate NMCI issues

related to upgrades)

Ability to send XML to external systems (EDA, FPDS, etc.) (PDS

Compliance)

(5)

ONR’s Requirements (Solicitation)

Software Functionality

– Functional Requirements (FAR/DFARS/DODGARS)

(create/execute/administer awards/solicitations, workflows, clauses, milestones, reports, closeout, archiving, etc.)

– Intuitiveness / Ease of use

– Flexibility of software to accommodate agency unique requirements

• Grants (no CLINs)

• S&T focus (issue BAA, then PR, then Award)

Integration and Technical Adaptability

– System Architecture, Extensibility, Security, System Management, etc.

– Interfacing/Integration Ability – Scalability of Software

(6)

Slide #6

Options (Business Case)

• Deploy Existing System (SPS)

– Pro – already in production throughout DoD

– Con – Lack of grants functionality

– Con – Outdated architecture (client/server)

– Con – Program being sunset (users know they would have to be trained and re-trained)

• Wait for Navy next-gen CWS solution

– Pro – Will be in-line with the rest of Navy

– Con – Not guaranteed to be ready in time to prepare for a NERP deployment at ONR in Oct 2012 (still unknown) – extends manual processes

• Expand Navy ERP to meet ONR’s functional needs

– Pro – everything would be in one system (reduces integration)

– Con – Too costly and previous efforts by other organizations to incorporate contract writing into ERPs has not been successful

• Build GOTS System

– Pro – Will have some control over functionality and enhancements (govt. owns)

– Con – Starting from scratch (takes a lot to get to an 80% solution)

– Con – Not guaranteed to be ready in time to prepare for a NERP deployment at ONR in Oct 2012 (still unknown) – extends manual processes

*Deploy COTS CWS*

– Pro – Existing product already in production throughout the Federal government

(7)

ONR’s Decision / Way Ahead

• Compusearch’s PRISM system was selected • Benefits of PRISM:

– Deployed at other Federal Granting Organizations (i.e. NASA)

– Integrated with other SAP and Oracle requirements/financial systems (similar to Navy ERP/NAVRIS)

– Configurable system

ONR Needs PRISM

Contracts AND Grants functionality Yes

FAR/DFARS compliance Yes – regular updates

Deployment by Oct 2012 (when Navy ERP is deployed at ONR)

Yes – deployment (without integration) expected in 6 months

Web-based (to eliminate NMCI issues related to upgrades)

Yes – web page look and feel (intuitive GUI)

Ability to send XML to external systems EDA, FPDS, DAADS, etc.)

Yes – Will be accommodating all PDS requirements

(8)

Slide #8

Award Structure

Base Contract – Proof of Concept

Option 1 – Integration to legacy financial system

Option 2 – Implementation (configuration, testing, training,

deployment)

Option 3 – Operations and Maintenance

Option 4 – Operations and Maintenance

(9)

Proof of Concept

Mini-deployment

– User demo

– Configuration and testing of select scenarios – No user licenses

Scenarios (included integration to NAVRIS)

– Basic FFP Award Created from CR

• Line Items

– 1 fully funded line

– 1 fully funded line obligated for less than CR amount – 1 unfunded line (future funding)

– 1 Option line

– Incremental Funding Mod – Exercise Option Mod

– Reduction Mod (De-Ob and reduce TAV) – Admin Mod

(10)

Slide #10

POC Results

Basic Data exchange between NAVRIS and PRISM worked

User Comments

– Quick learning curve of PRISM functionality by users

– Appears to improve processing time (especially with Mods)

– Users liked many of the features included with PRISM (look and feel, help options, etc.)

– No training needed for testing (intuitive)

(11)

Lessons Learned

What Didn’t Work

– Administrative delays led us to realize that integration to the legacy system was not going to provide an effective ROI

– Will need additional contract for integrating with Navy ERP

• Need Navy ERP Program Office approval for integration with non SPS system (Support from DASN)

What Worked

– POC was a success

• Early user involvement

– Users were involved with developing business processes and testing the system – this gave them an early look at the solution and helped form bottom-up buy-in for the product

– Users can’t wait for the system to be deployed – Users invited to the product demos

– Flexibility in contract structure (provided an “out” for integration and implementation)

(12)

Slide #12

The Way Ahead

Skipping Option 1 (Integration)

PRISM will be deployed on its own - No longer integrating to

legacy financial system

– Users will become familiar with the product – Integrations to external systems still exist – Reduced processing time for mods

Next Steps

– Hold Configuration Workshops with users

– Integration requirements will focus on Navy ERP

– Data Migration (needs to be complete prior to Navy ERP deployment)

(13)

References

Related documents

We will check our proposal by arguing that all genus zero A/2 model correlation functions will match those of the B/2-twisted mirror Landau-Ginzburg theory given above, using

In this paper we focus on approaches which aim at discovering communities of people in Opportunistic Networks. We first study the behaviour of three community detection

Net revenue for the PC Client Group (PCCG) operating segment, the Data Center Group (DCG) operating segment, the other Intel architecture (Other IA) operating segments, and

One point more than 3.00 sigmas from center line... One point more than 3.00 sigmas from

To participate in the study you must (a) identify Native American as your primary ethnic identity, (b) have lived with a parent or guardian during the past year, (c) have

Second-generation migrants and those who had not spent any of their adult lives in Greece or Cyprus were not included in the research, simply because they would not be able to

High Level Description / ROLE Routes page requests/data between the kernel on the destination machine and the network towards the source machine Success indicator Running guest