SUMMARY REVISION PAGE 0 1 1 PURPOSE OF TESTS 2 X 2 REFERENCE DOCUMENT 2 X 3 SCOPE 2 X 4 METER TERMINLOGY 3 X 5 TEST EQUIPMENT 3 X 6 PRE-REQUISTES 3 X 7 TEST PROCEDURES 4 X
8 RECORD TEST SHEET 5 X
8.1 METER INFORMATION X
8.2 PROGRAMMED METER SETTINGS
8.3 DISPLAY CHECK X
8.4 FINAL CHECK
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date Date
1 PURPOSE OF TESTS
The purpose of the tests is to check the full functionality of the energy meter. This procedure must be used with the complete Diameter Test Procedure, which provides the list of all panel wiring tests. This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures.
2 REFERENCE DOCUMENTS
DOCUMENT REFERENCEDOCUMENT VERSION/DATE REMARKS
Protection Line Diagram Schematic Drawing Service Manual Operation Manual 3 SCOPE Substation Name :- Diameter: Bay : Panel Number :
Meter Denomination in Scheme (RM)
4 TERMINOLOGY
Code ( ANSI) Terminology
MAIN, CHECK ENERGY METER
5 TEST EQUIPMENT USED
Sl No Description Make Equipment
Sl No. Calibration date Calibration due date 1. Secondary Injection Kit 2. Multimeter 3. Laptop NA 6. PRE - REQUISITES PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test Ac & Dc Supply Availability And Security PPE Safety Available.
All Other Relevant Safety Instructions Been Followed Coordination With Other Parties ( GIS, Transformer, Etc..)
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date Date
7. TEST PROCEDURES
The following procedures are written for demonstrating the main functions of the energy meters using an Omicron test set or similar. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.
7.1. Operational tests:
7.1.1 Meter Display (Instant Readings)
Program the meter with correct ratio of Current Transformer and Voltage transformer.
Apply rated voltage and check the meter readings and record the different readings such as Phase
to phase voltage and Phase to neutral voltage.
Now apply rated current and check the readings and record.
Apply rated voltage and current with phase angle 0° and check the Power Factor and note the
readings.
Similarly, apply rated voltage and current with different phase angle and note down the readings.
7.1.2 Meter Display (Accumulated Readings)
Apply rated voltage and rated current with Unity power factor for 30 Minutes and check the initial readings and final readings.
8. RECORD TEST SHEET 8.1 METER INFORMATION Designation: Type No.: Model No : Serial Number : Rated Voltage (V) Rated Current (A) Frequency (HZ) Auxiliary Power (V)
8.2 PROGRAMMED METER SETTINGS
CT Ratio: VT Ratio:
Multiply by Constant:
Primary Watt Hour Constant:
8.3 DISPLAY CHECK (a) VOLTAGE
Phase
Voltage Applied
(V) Expected Reading(kV) Meter Display Reading(kV) Remarks
R-N Y-N B-N R-Y Y-B B-R (b) CURRENT
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date Date
Phase Injected Current(A) Expected Reading(kA) Meter Display Reading(kA) Remarks R-N Y-N B-N (c) POWER FACTOR Phase Angle
(between V&I) Expected Reading Meter Display Reading Remarks
R-N Y-N B-N RYB (d) ACTIVE POWER Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected
Reading Meter Display Reading Remarks R-N
Y-N B-N RYB
(e) REACTIVE POWER
Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected
Reading Meter Display Reading Remarks R-N
Y-N B-N RYB
Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected
Reading Meter Display Reading Remarks R-N Y-N B-N RYB (g) WATT HOUR Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Time Applied Expected
Reading Meter Display Reading RYB (g) VAR HOUR Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Time Applied Expected
Reading Meter Display Reading RYB
8.4 FINAL CHECKS
Item Description Result
1 All test equipment, leads, shorts and test block removed safely?
2 Disturbed customer wiring re-checked?
3 Alarms reset?
4 Secondary front cover replaced? (If applicable)
REMARKS
……… ……… ………
END OF REPORT
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date Date