RM-METER Test Report Rev 1

N/A
N/A
Protected

Academic year: 2021

Share "RM-METER Test Report Rev 1"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

SUMMARY REVISION PAGE 0 1 1 PURPOSE OF TESTS 2 X 2 REFERENCE DOCUMENT 2 X 3 SCOPE 2 X 4 METER TERMINLOGY 3 X 5 TEST EQUIPMENT 3 X 6 PRE-REQUISTES 3 X 7 TEST PROCEDURES 4 X

8 RECORD TEST SHEET 5 X

8.1 METER INFORMATION X

8.2 PROGRAMMED METER SETTINGS

8.3 DISPLAY CHECK X

8.4 FINAL CHECK

AREVA T&D GCCIA / SNCL

Signature Signature

Name Name

Date Date

(2)

1 PURPOSE OF TESTS

The purpose of the tests is to check the full functionality of the energy meter. This procedure must be used with the complete Diameter Test Procedure, which provides the list of all panel wiring tests. This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures.

2 REFERENCE DOCUMENTS

DOCUMENT REFERENCEDOCUMENT VERSION/DATE REMARKS

Protection Line Diagram Schematic Drawing Service Manual Operation Manual 3 SCOPE Substation Name :- Diameter: Bay : Panel Number :

Meter Denomination in Scheme (RM)

(3)

4 TERMINOLOGY

Code ( ANSI) Terminology

MAIN, CHECK ENERGY METER

5 TEST EQUIPMENT USED

Sl No Description Make Equipment

Sl No. Calibration date Calibration due date 1. Secondary Injection Kit 2. Multimeter 3. Laptop NA 6. PRE - REQUISITES PRE-REQUISITES REMARKS

All Safety Condition Are Ok

All Competent Personnel Available For The Test Ac & Dc Supply Availability And Security PPE Safety Available.

All Other Relevant Safety Instructions Been Followed Coordination With Other Parties ( GIS, Transformer, Etc..)

AREVA T&D GCCIA / SNCL

Signature Signature

Name Name

Date Date

(4)

7. TEST PROCEDURES

The following procedures are written for demonstrating the main functions of the energy meters using an Omicron test set or similar. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.

7.1. Operational tests:

7.1.1 Meter Display (Instant Readings)

 Program the meter with correct ratio of Current Transformer and Voltage transformer.

 Apply rated voltage and check the meter readings and record the different readings such as Phase

to phase voltage and Phase to neutral voltage.

 Now apply rated current and check the readings and record.

 Apply rated voltage and current with phase angle 0° and check the Power Factor and note the

readings.

 Similarly, apply rated voltage and current with different phase angle and note down the readings.

7.1.2 Meter Display (Accumulated Readings)

Apply rated voltage and rated current with Unity power factor for 30 Minutes and check the initial readings and final readings.

(5)

8. RECORD TEST SHEET 8.1 METER INFORMATION Designation: Type No.: Model No : Serial Number : Rated Voltage (V) Rated Current (A) Frequency (HZ) Auxiliary Power (V)

8.2 PROGRAMMED METER SETTINGS

CT Ratio: VT Ratio:

Multiply by Constant:

Primary Watt Hour Constant:

8.3 DISPLAY CHECK (a) VOLTAGE

Phase

Voltage Applied

(V) Expected Reading(kV) Meter Display Reading(kV) Remarks

R-N Y-N B-N R-Y Y-B B-R (b) CURRENT

AREVA T&D GCCIA / SNCL

Signature Signature

Name Name

Date Date

(6)

Phase Injected Current(A) Expected Reading(kA) Meter Display Reading(kA) Remarks R-N Y-N B-N (c) POWER FACTOR Phase Angle

(between V&I) Expected Reading Meter Display Reading Remarks

R-N Y-N B-N RYB (d) ACTIVE POWER Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected

Reading Meter Display Reading Remarks R-N

Y-N B-N RYB

(e) REACTIVE POWER

Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected

Reading Meter Display Reading Remarks R-N

Y-N B-N RYB

(7)

Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Expected

Reading Meter Display Reading Remarks R-N Y-N B-N RYB (g) WATT HOUR Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Time Applied Expected

Reading Meter Display Reading RYB (g) VAR HOUR Phase Voltage Applied (V) Current Injected (A) Angle (between V&I) Time Applied Expected

Reading Meter Display Reading RYB

8.4 FINAL CHECKS

Item Description Result

1 All test equipment, leads, shorts and test block removed safely?

2 Disturbed customer wiring re-checked?

3 Alarms reset?

4 Secondary front cover replaced? (If applicable)

REMARKS

……… ……… ………

END OF REPORT

AREVA T&D GCCIA / SNCL

Signature Signature

Name Name

Date Date

References

Related documents

The focus on political action which we aim to understand in the third dimension of the use of political space has been especially pointed to in com- parative education research as

to six different types of stone have been used in the masonry work and sculpture: Paleocene limestones, Albian sandstones, Miocene sandstones, Upper Cretaceous limestones, and

Relationship between distance from the plantation’s edge (seed source), and basal diameter and tree height of randomly chosen individuals (A, B) and individuals with the

patients treated for recurrent disease, 6 had received prior head and neck radiation, 6 had skull base involvement, and 3 had.. known distant metastatic pulmonary disease, but

112 (Merely in pecuniary terms, plaintiffs may wish to pursue antitrust claims because they call for a trebling of damage awards rather than simply an administrative penalty that

 Course Participation: 2 Original Posts to Discussion Questions per week beginning in week 2 and with a break on week 8 when your paper is due is required.. 4 Response Post per

From 1st January 2015, and for a period of two years the Kennel Club Show Regulations which stipulate that dogs must be entered and exhibited in a breed class before exhibiting in

Correlated continuous time random walk; Ehrenfest-Brillouin Markov chain; Fractional diffusion; Jacobi diffusion; Pearson diffusion.. 2010 Mathematics