• No results found

References. References 227

N/A
N/A
Protected

Academic year: 2021

Share "References. References 227"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

(1)

References

Adam, D. 1988, "Die Eignung der belastungsorientierten Auftragsfreigabe für die Steurerung von Fertigungsprozessen mit diskontinuierlichem Materialfluss",

Zeitschrift für Betriebswirtschaft, vol. 58, no. 1, pp. 98-115.

Adam, D. 1989, "Probleme der belastungsorientierten Auftragsfreigabe", Zeitschrift

für Betriebswirtschaft, vol. 59, pp. 443-447.

Baker, K. R. 1974, Introduction to sequencing and scheduling. John Wiley & Sons Inc., USA.

Baker, K. R. & Bertrand, J. W. M. 1981, "An investigation of due date assignment rules with constrained tightness", Journal of Operations Management, vol. 1, no. 3, pp. 109-120.

Baker, K. R. & Kanet, J. J. 1983, "Job shop scheduling with modified operation due-dates", Journal of Operations Management, vol. 4, no. 1, pp. 11-22.

Baker, K. R. 1984, "Sequencing rules and due-date assignments in a job shop",

Management Science, vol. 30, no. 9, pp. 1093-1104.

Bakker, W. 1965, De levertijd in machinefabrieken, een oriënterend onderzoek (dissertation) Uitgeverij Waltman, Delft.

Bechte, W. 1980, Steuerung der Durchlaufzeit durch belastungsorientierte

Auftragsfreigabe bei Werkstattfertigung. VDI-Verlag (dissertation), Düsseldorf.

Bechte, W. 1988, "Theory and practice of load-oriented manufacturing control",

International Journal of Production Research, vol. 26, no. 3, pp. 375-395.

Bechte, W. 1994, "Load-oriented manufacturing control just-in-time production for job shops", Production Planning & Control, vol. 5, no. 3, pp. 292-307.

Bergamaschi, D., Cigolini, R., Perona, M., & Portioli, A. 1997, "Order review and release strategies in a job shop environment: a review and a classification",

International Journal of Production Research , vol. 35, no. 2, pp. 339-420.

Bertrand, J. W. M. & Wortmann, J. C. 1981, Production control and information

systems for component-manufacturing shops. Elsevier Science Publishers B.V.,

North-Holland.

Bertrand, J. W. M. 1983, "The effect of workload dependent due-dates on job shop performance", Management Science, vol. 29, no. 7, pp. 799-816.

Bertrand, J. W. M. & Ooijen, H. P. G. v. 1991, "Flow rate flexibility in complex production departments", International Journal of Production Research, vol. 29, no. 4, pp. 713-724.

Bertrand, J. W. M. & Ooijen, H. P. G. v. 2002, "Workload based order release and productivity: a missing link", Production Planning & Control, vol. 13, no. 7, pp.

(2)

Blackstone, J. H., Phillips, D. T., & Hogg, G. L. 1982, "A state-of-the-art survey of dispatching rules for manufacturing job shop operations", International Journal

of Production Research, vol. 20, no. 1, pp. 27-45.

Blazewicz, J., Domschke, W., & Pesch, E. 1996, "The job shop scheduling problem: conventional and new solution techniques", European Journal of Operational

Research, vol. 93, pp. 1-33.

Breithaupt, J.-W., Land, M. J., & Nyhuis, P. 2002, "The workload control concept: theory and pratical extensions of Load Oriented Order Release", Production

Planning & Control, vol. 13, no. 7, pp. 625-638.

Burmeister, M. 1997, Auslegung der Verbrauchssteuerung bei vernetzter Produktion. Forschritt-Berichte VDI, Reihe 8, Nr 658, Düsseldorf.

Buzacott, J. A. & Shanthikumar, J. G. 1993, Stochastic Models of Manufacturing

Systems. Prentice-Hall, Englewood Cliffs.

Cheng, T. C. E. & Gupta, M. C. 1989, "Survey of scheduling research involving due date determination decisions", European Journal of Operational Research, vol. 38, no. 2, pp. 156-166.

Christy, D. P. & Kanet, J. J. 1990, "Manufacturing systems with forbidden early shipment: implications for choice of scheduling rules", International Journal of

Production Research, vol. 28, no. 1, pp. 91-100.

Cigolini, R., Perona, M., & Portioli, A. 1998, "Comparison of order review and release techniques in a dynamic and uncertain job shop environment",

International Journal of Production Research, vol. 36, no. 11, pp. 2931-2951.

Cigolini, R. & Portioli Staudacher, A. 2002, "An experimental investigation on workload limiting methods within ORR policies in a job shop environment",

Production Planning & Control, vol. 13, no. 7, pp. 602-613.

Conway, R., Maxwell, W. L., & Miller, L. W. 1967, Theory of scheduling. Addison-Wesley Reading, Mass.

Easton, F. F. & Moodie, D. R. 1999, "Pricing and lead time decisions for make-to-order firms with contingent make-to-orders", European Journal of Operational Research, vol. 116, pp. 305-318.

Eilon, S. & Chowdhury, I. 1976, "Due dates in job shop scheduling", International

Journal of Production Research, vol. 14, no. 2, pp. 223-237.

Enns, S. T. 1994, "Job shop leadtime requirements under conditions of controlled delivery performance", European Journal of Operational Research, vol. 77, pp. 429-439.

Enns, S. T. 1995, "An integrated system for controlling shop loading and work flow",

(3)

Enns, S. T. & Costa, M. P. 2002, "The effectiveness of input control based on aggregate versus bottleneck work loads", Production Planning & Control, vol. 13, no. 7, pp. 614-624.

Fandel, G., François, P., & Gubitz, J.-M. 1998, PPS- und integrierte betriebliche

Softwaresysteme - Grundlagen, Methoden, Marktanalyse. Springer-Verlag,

Berlin, Heidelberg, New York.

Fowler, J. W., Hogg, G. L., & Mason, S. J. 2002, "Workload control in the semiconductor industry", Production Planning & Control, vol. 13, no. 7, pp. 568-578.

Fredendall, L. D. & Melnyk, S. A. 1995, "Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop", International Journal of Production Research, vol. 33, no. 6, pp. 1521-1534.

Fry, T. D., Philipoom, P. R., & Blackstone, J. H. 1988, "A simulation study of processing time dispatching rules", Journal of Operations Management, vol. 7, no. 4, pp. 77-92.

Glassey, C. R. & Resende, M. G. C. 1988, "Closed-loop job release control for VLSI circuit manufacturing", IEEE Transactions on Semiconductor Manufacturing, vol. 1, no. 1, pp. 36-46.

Goldratt, E. M. & Cox, J. F. 1984, The Goal. North River Press, New York.

Greiner, T. 1989, "Belastungsorientierte Auftragsfreigabe - nicht immer die beste Lösung", AV, vol. 26, no. 2, pp. 65-68.

Hansmann, K.-W. 1993, "Capacity oriented production control for a job shop production", Preprints "Management and New Production Systems", EIASM, London, pp. 245-257.

Haskose, A., Kingsman, B. G., & Worthington, D. 2002, "Modelling flow and jobbing shops as a queueing network for workload control", International Journal

of Production Economics, vol. 78, pp. 271-285.

Haskose, A., Kingsman, B. G., & Worthington, D. 2003, "Performance analysis of make-to-order manufacturing systems under different workload control regimes",

International Journal of Production Economics (to appear).

Häfner, H. 1992, Ein Warteschlangenansatz zur integrierten Produktionsplanung Physica-Verlag, Heidelberg.

Hendry, L. C. & Kingsman, B. G. 1988, "A decision support system to manage shop floor throughput times in make-to-order companies", Preprints 5th International

Working Seminar on Production Economics, Igls, Austria, vol. 32, no. 1, pp.

(4)

Hendry, L. C. 1989, "A decision support system to manage delivery and manufacturing lead times in make-to-order companies.", University of Lancaster,

PhD dissertation.

Hendry, L. C. & Kingsman, B. G. 1989, "Production planning systems and their applicability to make-to-order companies", European Journal of Operational

Research, vol. 40, no. 1, pp. 1-15.

Hendry, L. C. & Kingsman, B. G. 1991, "A decision support system for job release in make-to-order companies", International Journal of Operations & Production

Management, vol. 11, no. 6, pp. 6-16.

Hendry, L. C. & Kingsman, B. G. 1993, "Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies", Journal of

Operational Research Society, vol. 44, no. 1, pp. 61-70.

Hendry, L. C. & Wong, S. K. 1994, "Alternative order release mechanisms: a comparison by simulation", International Journal of Production Research, vol. 32, no. 12, pp. 2827-2842.

Hendry, L. C., Kingsman, B. G., & Cheung, P. 1998, "The effect of workload control (WLC) on performance in make-to-order companies", Journal of Operations

Management, vol. 16, no. 1, pp. 63-75.

Henrich, P., Land, M. J., Gaalman, G. J. C., & Zee, D. J. v. d. 2003, "The effect of information on workload control," in One world? One view of OM? The

challenges of integrating research & practise (vol 2), G. Spina et al., eds., S.G.E.,

Padova, pp. 611-620.

Henrich, P., Land, M. J., & Gaalman, G. J. C. 2003, "Exploring applicability of the workload control concept", International Journal of Production Economics (to

appear).

Irastorza, J. C. & Deane, R. H. 1974, "A loading and balancing methodology for job shop control", AIIE Transactions, vol. 6, no. 4, pp. 302-307.

Jain, A. S. & Meeran, S. 1999, "Deterministic job-shop scheduling: Past, present and future", European Journal of Operational Research, vol. 113, pp. 390-434. Jewell, W. S. 1976, "A simple proof of L = λ x W", Operations Research, vol. 15,

no. 6, pp. 1109-1116.

Kanet, J. J. & Christy, D. P. 1984, "Manufacturing systems with forbidden early order departure", International Journal of Production Research, vol. 22, no. 1, pp. 41-50.

Kanet, J. J. 1988, "Load-limited order release in job scheduling systems", Journal of

Operations Management, vol. 7, no. 3, pp. 44-58.

(5)

Kingsman, B. G., Worden, L., Hendry, L. C., Mercer, A., & Wilson, E. 1993, "Integrating marketing and production planning in make-to-order companies",

International Journal of Production Economics, vol. 30-31, pp. 53-66.

Kingsman, B. G., Hendry, L. C., Mercer, A., & de Souza, A. A. 1996, "Responding to customer enquiries in make-to-order companies, Problems and solutions",

International Journal of Production Economics, vol. 46-47, pp. 219-231.

Kingsman, B. G. 2000, "Modelling input-output workload control for dynamic capacity planning in production planning systems", International Journal of

Production Economics, vol. 68, pp. 73-93.

Kingsman, B. G. & Hendry, L. C. 2002, "The relative contribution of input and output controls on the performance of a workload control system in Make-To-Order companies", Production Planning & Control, vol. 13, no. 7, pp. 579-590. Knolmayer, G. 1991, "A widely acclaimed method of load-oriented job release and

its conceptual deficiencies," in Modern production concepts, G. Fandel & G. Zäphel, eds., Springer Verlag, Berlin.

Land, M. J. & Gaalman, G. J. C. 1994, "The choice of performance indicators for job shops," in Operations Strategy and Performance, K. W. Plattw, M. J. Gregory, & A. D. Neely, eds., Cambridge University Press, Cambridge, pp. 101-106.

Land, M. J. & Gaalman, G. J. C. 1996a, "Workload control concepts in job shops: A critical assessment", International Journal of Production Economics, vol. 46-47, pp. 535-548.

Land, M. J. & Gaalman, G. J. C. 1996, "Towards simple and robust workload norms," in Proceedings of the workshop production planning and control, Mons, Belgium, pp. 66-96.

Land, M. J. & Gaalman, G. J. C. 1998, "The performance of workload control concepts in job shops: Improving the release method", International Journal of

Production Economics, vol. 56-57, pp. 347-364.

Law, A. M. & Kelton, W. D. 1991, Simulation modeling & analysis, 2 edn. McGraw-Hill, Singapore.

Little, J. D. C. 1961, "A proof for the queuing formula: L = λ W", Operations

Research, vol. 9, pp. 383-387.

Melnyk, S. A. & Ragatz, G. L. 1988, "Order review/release and its impact on the shop floor", Production and Inventory Management Journal, vol. 29, no. 2, pp. 13-17.

Melnyk, S. A. & Ragatz, G. L. 1989, "Order review/release: research issues and perspectives", International Journal of Production Research, vol. 27, no. 7, pp. 1081-1096.

(6)

Melnyk, S. A., Ragatz, G. L., & Fredendall, L. D. 1991, "Load smoothing by the planning and order review/release systems: a simulation experiment", Journal of

Operations Management, vol. 10, no. 4, pp. 512-523.

Melnyk, S. A., Denzler, D. R., & Fredendall, L. D. 1992, "Variance control vs. dispatching efficiency", Production and Inventory Management Journal, vol. 3, no. 1992, pp. 6-13.

Melnyk, S. A., Denzler, D. R., Magnan, G. L., & Fredendall, L. D. 1994, "An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters", Production and Operations

Management, vol. 3, no. 1, pp. 64-76.

Muda, S. & Hendry, L. C. 2002, "Developing a new world class model for small and medium sized make-to-order companies", International Journal of Production

Economics, vol. 78, pp. 295-310.

Nyhuis, P. 1991, Durchlauforientierte Losgrössenbestimmung. VDI Fortschritt-Berichte reihe 2, Nr.225, VDI Verlag, Düsseldorf.

Nyhuis, P. 1992, "Logistische rationalisierungspotentiale erkennen und bewerten",

Beitrag zum 9.östereichischen Logistik-Dialog, Wien.

Nyhuis, P. & Wiendahl, H.-P. 1999, Logistische Kennlinien: Grundlagen, Werkzeuge

und Anwendungen. Springer-Verlag, Berlin.

Ooijen, H. P. G. v. 1996, Load-based work-order release and its effectiveness on

delivery performance improvement. (dissertation) FEBO, Enschede.

Ooijen, H. P. G. v. & Bertrand, J. W. M. 2003, "The effects of a simple arrival rate control policy on throughput and work-in-proces in production systems with workload dependent processing rates", International Journal of Production

Economics, vol. 85, pp. 61-68.

Oosterman, B. 1995, Een vergelijking van werklastbeheersing in verschillende

productiesituaties. Unpublished Master Thesis, University of Groningen.

Oosterman, B., Land, M. J., & Gaalman, G. J. C. 2000, "The influence of shop characteristics on workload control", International Journal of Production

Economics, vol. 68, pp. 107-119.

Panwalker, S. S. & Iskander, W. 1977, "A survey of scheduling rules", Operations

Research, vol. 25, no. 1, pp. 45-61.

Park, P. S. & Bobrowski, P. M. 1989, "Job release and labor flexibility in a dual resource constrained job shop", Journal of Operations Management, vol. 8, no. 3, pp. 230-249.

Park, P. S. & Salegna, G. J. 1995, "Load smoothing with feedback in a bottleneck job shop", International Journal of Production Research, vol. 33, no. 6, pp.

(7)

1549-Perona, M. & Portioli, A. 1996, "An enhanced loading model for the probabilistic workload control under workload imbalance", Production Planning & Control, vol. 7, no. 1, pp. 68-78.

Perona, M. & Portioli, A. 1998, "The impact of parameters setting in load oriented manufacturing control", International Journal of Production Economics, vol. 55, pp. 133-142.

Philipoom, P. R. & Fry, T. D. 1992, "Capacity-based order review/release strategies to improve manufacturing performance", International Journal of Production

Research, vol. 30, no. 11, pp. 2559-2572.

Plossl, G. W. & Wight, O. W. 1971, "Capacity planning and control", Working paper

presented at the APICS International Conference in St.Louis, Missouri.

Plossl, G. W. 1988, "Throughput time control", International Journal of Production

Research, vol. 26, no. 3, pp. 493-499.

Ragatz, G. L. & Mabert, V. A. 1984, "A framework for the study of due date management in job shops", International Journal of Production Research, vol. 22, no. 4, pp. 685-695.

Ramasesh, R. 1990, "Dynamic job shop scheduling: a survey of simulation research",

Omega, vol. 18, no. 1, pp. 43-57.

Riezebos, J., Korte, G. J., & Land, M. J. 2003, "Improving a practical DBR buffering approach using Workload Control", International Journal of Production

Research, vol. 41, no. 4, pp. 699-712.

Roderick, L. M., Phillips, D. T., & Hogg, G. L. 1992, "A comparison of order release strategies in production control systems", International Journal of Production

Research, vol. 30, no. 3, pp. 611-626.

Rohleder, T. R. & Scudder, G. D. 1993, "A comparison of order-release and dispatch rules for the dynamic weighted early/tardy problem", Production and Operations

Management, vol. 2, no. 3, pp. 221-238.

Salegna, G. J. & Park, P. S. 1996, "Workload smoothing in a bottleneck job shop",

International Journal of Operations & Production Management, vol. 16, no. 1,

pp. 91-110.

Shimoyashiro, S., Isoda, K., & Awane, H. 1984, "Input scheduling and load balance control for a job shop", International Journal of Production Research, vol. 22, no. 4, pp. 597-605.

Stidham Jr., S. 1972, "L = λ x W : a discounted analogue and a new proof",

Operations Research, vol. 20, no. 6, pp. 1115-1126.

Stidham Jr., S. 1974, "A last word on L = λ x W", Operations Research, vol. 22, no. 2, pp. 417-421.

(8)

hierarchical backlog control and lead time management methodology", University

of Lancaster, PhD dissertation.

Tatsiopoulos, I. P. 1993, "Simplified production management software for the small manufacturing firm", Production Planning & Control, vol. 4, no. 1, pp. 17-26. Tobin, N. R., Mercer, A., & Kingsman, B. G. 1987, "A study of small subcontract

and make-to-order firms in relation to quotation for orders", International Journal

of Operations & Production Management, vol. 8, no. 6, pp. 46-59.

Vig, M. M. & Dooley, K. J. 1993, "Mixing static and dynamic flowtime estimates for due-date assignment", Journal of Operations Management, vol. 11, no. 1, pp. 67-79.

Wein, L. M. 1990, "Scheduling networks of queues: heavy traffic analysis of a two-station network with controllable inputs", Operations Research, vol. 38, no. 6, pp. 1065-1078.

Wein, L. M. 1992, "Scheduling networks of queues: heavy traffic analysis of a multistation network with controllable inputs", Operations Research, vol. 40, no. 2, p. S312-S334.

Wein, L. M. & Chevalier, P. B. 1992, "A broader view of the job-shop scheduling problem", Management Science, vol. 38, no. 7, pp. 1018-1033.

Wiendahl, H.-P. 1987, Belastungsorientierte Fertigungssteuerung, Grundslagen,

Verfahrensaufbau, Realisierung. Carl Hanser Verlag, München.

Wiendahl, H.-P. & Springer, G. 1988, "Manufacturing process control on the basis of the input/output chart - a chance to improve the operational behaviour of automatic production systems", International Journal of Advanced

Manufacturing Technology, vol. 3, no. 1, pp. 55-69.

Wiendahl, H.-P. 1991, Anwendung der belastungsorientierten Fertigungssteuerung. Carl Hanser Verlag, München.

Wiendahl, H.-P., Glässner, J., & Peterman, D. 1992, "Application of load-oriented manufacturing control in industry", Production Planning & Control, vol. 3, no. 2, pp. 118-129.

Wiendahl, H.-P. (Ed.) 1993, Neue wege der PPS. Gmft-Verlag, München,.

Wiendahl, H.-P. & Ullmann, W. 1993, "Logistics performance measurement of shop floor activities", Annals of the CIRP, vol. 42, no. 1, pp. 509-512.

Wiendahl, H.-P. 1995, Load-oriented manufacturing control. Springer-Verlag, Berlin.

Wiendahl, H.-P. & Nyhuis, P. 1996, "Logistic operating curves - a comprehensive method of rating logistic potentials," in Annals of the German Academic Society

(9)

Wight, O. 1970, "Input/output control: a real handle on lead time", Production &

Inventory Management, vol. 11, no. 3, pp. 9-31.

Wisner, J. D. 1995, "A review of the order release policy research", International

Journal of Operations & Production Management, vol. 15, no. 6, pp. 25-40.

Zäpfel, G. & Missbauer, H. 1993, "Production planning and control (ppc) systems including load-oriented order release - problems and research perspectives",

International Journal of Production Economics, vol. 30/31, pp. 107-122.

References

Related documents

In this review, the research carried out using various ion-exchange resin-like adsorbents including modified clays, lignocellulosic biomasses, chitosan and its derivatives, microbial

[r]

[r]

[r]

Fig. Analysis of a pedigree with a mutation in the EXT2 gene. a) segregation analysis of EXT2 polymorphic markers. A-F refer to positions in the map shown in b. b) position of

theoretical framework features a standard two-goods inter-temporal model, which is specifically designed to uncover the role of permanent and temporary output shocks and

"Economic production quantity model for deteriorating inventory with random machine unavailability and shortage," International Journal of Production

Test Production Rates