v
VA Real Time Location System (RTLS) Overview
Zack Smith, MS
VISN 1 RTLS Program Manager, VHA RTLS Asset Tracking Co-Chair
Andrew J. Mazotas, MS, PMP
Clinical Engineer, National VHA RTLS PMO
Overview
Applications
Asset Tracking
Cath Lab Supply Management
Sterile Processing Workflow
Temperature Monitoring
Governance and Deployment
Veterans Affairs
“To care for him who shall have borne the battle and for his
widow and his orphan.”
Healthcare Efficiency
Transformational Initiative
•
Improve Patient Care
•
Improve Staff Efficiency
•
Improve Staff Satisfaction
•
Optimize Inventory and
Equipment
•
Improve Managerial Decision
Support
Patients Staff Medical Equipment SuppliesVA RTLS Goals
Largest direct care
healthcare system in
U.S.
• 8.3M+ Veterans cared for each year
• 152 Medical Centers
• 1400 Other Facilities
• $5.6B+ of Medical Technology
RTLS Infrastructure with multiple applications to be
deployed VA-wide Dec 2012 – Dec 2017
Veterans Integrated Service Networks (VISNs
)
Healthcare RTLS Use Cases - Examples
Asset Tracking Management Bed Biological Implants Blood Bank Workflow Dietary
Emergency Department
Workflow
EMS Workflow Hand Hygiene Records Tracking Hard Copy Non-Biological Implants
Organ Tracking Transplants Outpatient Care Patient Workflow Pathology Specimens Patient Elopement and Wandering Patient Fall Notification Pharmaceuticals Primary Care Patient Workflow Research Sterile Processing Workflow Supplies Tracking
• Niche Solutions in Single Hospital
–
Mobile Assets
– Active Wi-Fi + IR
–
Immobile Assets
– Passive UHF
–
Cath Lab Supplies
- Passive HF
–
Instruments
- 2D Barcodes
–
OR Staff/Patients
– Active 900MHz + Ultrasound
–
Hand Hygiene Staff
– Active 433MHz + LF
–
Long Term Care –
Ultra Wide Band
•
Example Issues
–
Redundant
–
Costly
–
Interactions difficult
7
8
Tag 1
Tag 2 IR Beacon
Vendor A IR Beacon Vendor B 433MHz Access Point Vendor A 900MHz Access Point Vendor B
RTLS: Lack of Interoperability
RTLS = Real Time Location System
Veterans Affairs Applications
RTLS Active
Tag
Here it
is!
Base Asset Tracking (AT) Cath Lab Supply Management (CL)
Temperature Monitoring (TM)
Sterile Processing Workflow (SPW)
Developing Emergency Dept.
Workflow (EDW) Hand Hygiene (HH)
Patient Elopement and Wandering (PEW)
Surgical Workflow (SW)
VA RTLS Overview
VA RTLS Overview
National
Data
Repository
GUI/
Database
Readers
Tags/badges/
markings
In Development with IEEE
1) Tags
Location Sensor Communication Technology Telemetry Pushbuttons Batteries2) Location
Sensors
Tag Communication Exciters/ Beacons Interrogators Handhelds3) Location
Engine
Ranging Techniques Position Algorithms Middleware Integration4)
Middleware
Tag, Location Sensor, Location Engine Management Location Data Management Application Integration
5)
Applications
User Interface Business Rules Alerts/ActionsVA RTLS System Model
Sensor Tag Sense
RTLS
Location ItemOperations
RTLS Conceptual Data Model
Output
Associations
Tracking Transaction = Item and Location association over Date/Time
Business Rules Communications
•
Real Time
–
Current Item Location
–
Correlated status
–
Business Rules/Communications
•
Retrospective
–
Workflow analysis to improve
business processes
•
Predictive…
13
RTLS
AT: Components
•
Software
–
Intelligent InSites (+ AEMS/MERS Interface)
–
OATSystems
•
Active Hardware
–
CenTrak Tags
–
CenTrak Supplemental Hardware
•
Passive Hardware
–
Vizinex + Emerson and Cuming Tags
–
Impinj + Motorola Portals
–
Motorola Handhelds
RTLS Asset Tagging Standard
•
Tag Type
(Active, Passive, N/A)
By Equipment Type
(e.g. Infusion
Pump)
–
2,838 Equipment Types
–
Minimal National Standard (may be exceeded)
–
Default to Active unless:
Bolted to Ground, Impedes Function, Non-Clinical Tool, Too Small, Vehicle
RTLS: Blended Technology Example
1
7
Passive Tags Servers Portals Scanner Wireless Active Tags Exciter NetworkServers Workstations Active Tags VA Network Wi-Fi 900MHz Infrared Low Frequency Exciters/Beacons Sensory Infrastructure
18
AT: Software
21
Location in RTLS Actual Location
23
24
Position A B Position 10m 5m 1m Room Beacon Locating PreciselyRTLS: Accuracy Assessment
• Certainty-based accuracy at the room-, bed-, bay- and chair-level
Clinical-Grade Locating™
Asset Tracking
Bed/Bay Level Accuracy
Device Photo Purpose Power
Gen2IR Monitor
- Room-level ~4 years Battery
Gen2IR Virtual Wall
- Bed-level location / Room Level
~2.5 years Battery
Low Frequency Exciter
- Chair-level location - Egress detection ~2 years Battery 900MHz Star - Coordinates w/ Virtual Walls - Alternate to Wi-Fi PoE
WiFi Access Point
- Zone coverage; low-resolution locating
Wired
Multimode technology
Location Sensing / Communication Supplemental Excitation WiFi 900 MHz Gen2IR(Infrared) Low Frequency
4 Technologies
Also used as supplemental
27
Asset Tracking
Light Bulb: An Illuminating Standard
2
8
Edison Screw
–
Accuracy By Room Type
(e.g. ICU Bay)By
Application
(e.g. Sterile Processing Workflow)–
Defines minimal broad initial
implementation
–
Enables multiple RTLS Applications
30
Pump
Patient Room Dirty Utility Clean Utility
Pump RTLS Status
Available
In Use
Dirty
A101 A102 A103
Was it really “In Use” or “In Patient Care Area”?
More data
• Output from device
• Association of Patient and Device
Location
correlates to
Status
v
RTLS Temperature
Monitoring (TM)
TM: Components
•
Software
–
Intelligent InSites
(+ AEMS/MERS interface)
•
Active Hardware
–
CenTrak Temperature Tags
–
CenTrak Temperature and
Humidity Tags
TM: Technology Overview
Servers Workstations w/ InSites Software Active Temperature Tags VA Network Wi-Fi 900MHz Sensory InfrastructureIndicates the flow of information from tag to user
Manufacturer: CenTrak • NIST traceable calibration
• 0.75C standard accuracy (0.5C typical) • Leverages Wi-Fi or 900 MHz
• Instant button‐initiated measurement • On board storage of data
• Multi‐year battery life
• Configurable reporting rates • Low battery condition alerting
Dimensions: 1.6 x 2.5 x 0.7 inches Battery: 1/2 AA Li battery Single Probe Options: → -20C to 50C → -100C to -20C → -200C to -100C Equipment
TM: Tags
Environmentalv
RTLS Cath Lab Supply
Management (CL)
•
Software
–
Intelligent InSites
(+ GIP, CART-CL, Patient and Hemodynamics Interfaces)
–
Wavemark
•
Passive Hardware
–
Wavemark Tags
–
Wavemark Smart Cabinets
–
Wavemark XPOS
–
Wavemark Tagging Station
Locking
Door
Mobile
Cabinet
Hanging
Cabinet
Standard
5-shelf
Standing
Bin
Requirements (other than Mobile)
Power: Standard 110 Volt AC, 15 Amp socket (200 Watt maximum cabinet power)
Data: RJ45 Ethernet data jack required.
HF1500
80 in (w/ wheels) x 44.5 in x 21 in
HF-D1500
(shelf and hanging) 80 in (w/ wheels) x 44.5 in x 21in HFS1500 40 in (w/ wheels) x 44.5 in x 21 in HFH1500 80 in (w/ wheels) x 44.5 in x 21 in HFM1500 67 in (w/ wheels) x 52 in x 31 in 8 Hr Battery 37
CL: Smart Cabinets
Manufacturer: Wavemark
Standard: ISO 15693
Operating frequency: HF 13.56 MHz
Spine Tag
Dimensions: 1.5” x 2.0” Used for foil packaging
Hanging Tag
Dimensions: 1.75” x 2.38” x .5” Used for hanging products
Standard Square Tag
Dimensions: 1.69” x 1.69” Used for most tagging
v
RTLS
Sterile Processing
Workflow (SPW)
SPW: Components
•
Software
–
Intelligent InSites
–
Censitrac (ITS)
•
Instrument Tracking System (ITS)
–
2D Matrix Stencils
–
Workstations
–
Marking Stations
–
Handheld scanners
–
Printers
•
Other Hardware Being Explored
–
Active and Passive Tags
–
Passive Portals and Handhelds
v
Governance and
Deployment
VA
RTLS
1 2 3 4 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 22 23VA RTLS Governance
National, VISN, and Local Programs:
•
RTLS Committee
•
Application Workgroups
•
Asset Tracking
•
Sterile Processing Workflow
•
Cath Lab Supplies
•
Temperature Monitoring
•
Developing Applications
•
PM Workgroups
•
Risk
•
Change Control
VISN RTLS Program Phases
Program Initiation Pre-Procurement Facility Projects Operations & MaintenanceEnhancement Projects
• Pre-Site Assessment • Site Assessment • Pre-Implementation • Design • Implementation Planning • Implementation • Acceptance Testing • Training • Project CloseVISN Implementation
Task Order Award
Contract Close
Period of Performance (PoP)
Facility A Facility B Facility D Facility C Facility E Facility F Facility G Facility Kickoff Facility Close-out
National Schedule
Acquisition Schedule
FY12 Technology demonstrations: V10, V11
FY13 V1, V5, V8 (ITS), V17, V19, V21, V23 (Phase 1), CMOP (Phase 1), National Data Center (NDC), ESE, NDR
FY14 V20, V22, V3 (Phase 1), V6, V16, V23 (Phase 2), CMOP (Phase 2)
FY15 V3 (Phase 2), V7, V8, V15, V18, CMOP (Phase 3), optional pilots