PERFORMA P-47A

STATUS OF MAJOR DEVELOPMENT WORKS HAVING BUDGET PROVISION OF RS.1.00 CRORE AND ABOVE

(WHICH ARE LIKELY TO BE COMPLETED DURING THE YEAR 2015-2016) UPTO 31.10.2015

HUDA CIRCLE FARIDABAD

Sr.

No.

Name of work

Estimated cost /

Approval

No. & Date

( Rs. In lacs)

Budget for the year 2015-16 ( Rs. In lacs)

Likely

date/

date of

start

Upto date Expd. (Rs. in lacs)

Likely

date of

completion

Action

Plan

Remarks

1

2

3

4

5

6

7

8

9

Divn.1, Faridabad.

1.

Re-const.

of

Suraj

Kund

road

from

Gurgaon

mod

to

Ankhir

Chowk

to

Prahladpur Boarder

8505

lacs-CA11865-68 Dated 11.07.2013

5000.00

11.04.13

6186.49

31.12.2015

(For clear

area)

Road work completed except one No. culvert. Reasons for delay:-

i) Transmission line at 4 different locations shifted on 02/2014, 05/2014, 07/2014 and 11/2014. ii) Water supply line in the alignment shifted during 06/2014.

iii) Forest Clearance still awaited.

2.

Prov. SWD in new

sectors 75 to 89, Fbd.

144.40 Crore CA

(P) No. 40980-84 dt.

18/10/2012

4500.00

30.10.13

11557.66

31.3.2016

SWD laid = 28.50 KM. Yet to be laid = 5.50 Km. Work held up = 6.43 Km.

a) Section-6 notified on 31.12.2013 & award likely to be announced - 0.41 Km b) Possession held up as CWP disposed off with the direction of Hon’ble High

Court to provide alternate plot to land owners - 0.465 Km c) Possession held up due to protest from the farmers regarding pending

CWPs (10514/2009, 10491/2009, 11143/2008, 8243/2009, 8483/2009, 1165/2008, 8396/2009, 8525/2009, 6782/2009, 13631/2012, 13302/2012,

20830/2013) in Hon’ble High Court - 1.575 Km d) Possession held up due to protest of Farmers regarding land rates.

The Estate Officer is making efforts to get possession at an early date. - 3.75 Km

e) Possession held up due to dispute between Farmers and colonizers - 0.23 Km. Total = 6.43 Km

Reasons of delay:-

i) Technical scheme approved by the competent authority on 9/2013. ii) The structural design Vetted by the NIT Kurukshetra on 11/2013.

The work balance in 6.43 km will be completed within nine months from the date of handing over of possession by LAO / EO / STP, Faridabad.

3.

Prov. Master SWD scheme of Zone VI, Fbd.

38.39 Crore CA No. 19699-703 dt.5.8.14.

1800.00 12.11.14 962.04 31.03.2016 SWD i.e. NP3 RCC pipe of various sizes to be laid 14.70 KM.

Laid upto date 7.10 KM and balance is in progress.

4.

Procurement of 1 no.

Super Sucker Unit along with 2 No. Suction Dump Tank and 1 No. water tank with houses &pump.

275.10 CA (P) 1440-44 dated 14.01.2014.

250.00 19.01.14 0.00 31.10.2015 Super Sucker Machine received.

(3)

No. & Date

( Rs. In lacs)

( Rs. In lacs) lacs)

Divn.-2, Fbd.

5

Dev. of new

sectors across

Agra Canal.

( Ext. Sewer),

Faridabad

5475.00

3781/

30.01.12

800.00

09/2012

4327.31

31.12.2015

(For

completion

of enhanced

work )

Sewer laid = 37.100 KM.

Yet to be laid = 0.500 Km.

Work held up = 6.43 Km.

a) Section-6 notified on 31.12.2013 & award likely to be announced - 0.41 Km b) Possession held up as CWP disposed off with the direction of Hon’ble High

Court to provide alternate plot to land owners - 0.465 Km

c) Possession held up due to protest from the farmers regarding pending CWPs (10514/2009, 10491/2009, 11143/2008, 8243/2009, 8483/2009, 1165/2008, 8396/2009, 8525/2009, 6782/2009, 13631/2012, 13302/2012,

20830/2013) in Hon’ble High Court - 1.575 Km

d) Possession held up due to protest of Farmers regarding land rates.

The Estate Officer is making efforts to get possession at an early date. - 3.75 Km

e) Possession held up due to dispute between Farmers and colonizers - 0.23 Km.

Total = 6.43 Km

Originally the work allotted for 31.865 Km with amounting to Rs.3271.00 lacs. Now, the work is in progress on 37.600 Km.

The work balance in 6.43 km will be completed within nine months from the date of handing over of possession by LAO / EO / STP, Faridabad.

(4)

-:3:-

Sr.

No.

Name of work

Estimated

cost /

Approval

No. & Date

( Rs. In lacs)

Budget for

the year

2015-16

( Rs. In

lacs)

Likely

date/ date

of start

Upto date

Expd.

(Rs. in

lacs)

Likely date

of

completion

Action Plan

Remarks

Divn.-3, Fbd.

6

Consn. of Master

road Sec-75 to 89,

Faridabad.

R/C/E for

master road

75-89, Fbd.

approved

vide CA

HUDA No.

41719 dated

16.12.2011

for Rs.391.77

crores.

1000.00

01/04/12

23778.38

31.3.2016

(Completed

in Clear

area.

Balance will

be

completed

within 9

months after

clear

possession

of land)

The work was allotted for restricted amount of Rs.225.98 Crore for 29.50 km of Master roads. Work completed in 38.495 km.

The total length of Master road Sector – 75 to 89, Faridabad is 44.925 km out of which possession of 38.495 km road length has been given by E.O. Fbd.

The work is held up in 6.43 km & detail is as under :-

a) Section-6 notified on 31.12.2013 & award likely to be announced - 0.41 Km b) Possession held up as CWP disposed off with the direction of Hon’ble High

Court to provide alternate plot to land owners - 0.465 Km

c) Possession held up due to protest from the farmers regarding pending CWPs (10514/2009, 10491/2009, 11143/2008, 8243/2009, 8483/2009, 1165/2008, 8396/2009, 8525/2009, 6782/2009, 13631/2012, 13302/2012,

20830/2013) in Hon’ble High Court - 1.575 Km

d) Possession held up due to protest of Farmers regarding land rates.

The Estate Officer is making efforts to get possession at an early date. - 3.75 Km

e) Possession held up due to dispute between Farmers and colonizers - 0.23 Km.

Total = 6.43 Km

The work balance in 6.43 km will be completed within nine months from the date of handing over of possession by LAO / EO / STP, Faridabad.

Physical progress is as under:-

Target Revised physical target Achievement 29.50 km road to be completed in all respect. 38.495 Km road completed by 31.07.2015 38.495 km road compled

Contd…P/4

(5)

( Rs. In lacs)

( Rs. In lacs)

7 Const. of Indoor Stadium Sector -12, Fbd. CE No. 11777-80 dt.11.03.13 for Rs. 1704.00 Lacs.

500.00 01/07/2013 1029.42 31.03.2016 The physical progress is as under:-

Physical Target Achievement

Erection of Major truss 8 Nos. of size 167 feet span Completed & launched Erection of Minor truss 8 Nos. of 100 feet span Completed & launched Erection of minor truss 6 Nos. of 75 feet span Completed & launched

Stands 4 Nos. 4 Nos. stands completed.

Roof sheeting Work in progress

Flooring - Finishing -

8

R/C/E for

Aug.

of

master

water

supply

scheme

Zone

–I

(For Sec–

33, 34, 39,

41, 42, 45,

91

&

Green

Field

Colony)

Fbd.

55.30 Crores

Secy.

HUDA

Pkl. Letter No.

38872-75

dt.

29.9.2013

2000.00

29.11.13

1436.35

31.03.2016

A)

2Nos.

Ranney

wells for

Rs.25.26

Crores.

A) The Ranney Well construction status is as under:-

Ranney Well No.

Casting ( inmtrs.)

Well sinking ( in mtrs.)

Pushing of laterals

1.

31.00 mtr.

28.00 Mtr.

Ready for pushing

2.

31.00 Mtr.

28.50 Mtr.

Ready for pushing

Work in progress is as under:-

Target

Achievement

2 Nos. Ranney Wells work

Two No. site identified & work is in progress.

400mm DI pipes 3.0 Km

D.I. Pipe received

8 VT pump

8 Nos. received at site

8 motors

8 Nos. received at site.

70 Sluice valve

70 Nos. received at site.

10 Non return valves

10Nos. received at site.

Cutting edge 2 Nos.

Reasons of delay:-

Delay in the finalization of land due to selection of appropriate site for 2 Nos. Ranney Wells and purchase of land from Private owner by the contractor.

(6)

-:5:-

Sr.

No.

Name of

work

Estimated

cost /

Approval

No. & Date

( Rs. In lacs)

Budget for

the year

2015-16

( Rs. In

lacs)

Likely

date/ date

of start

Upto date

Expd.

(Rs. in

lacs)

Likely date

of

completion

Action Plan

Remarks

05.09.14

31.3.2016

B) Boosting

station

&

UGT

B) Work allotted amounting to Rs.1428.70 lacs allotted to M/s Subhash Infraengineers Pvt. Ltd. on 05.09.2014.

Target Achievement

UGT (4540KL) Excavation completed, Raft of UGT completed.

DI. Pipe

DIA QTY. RECEIVED Laid

250 mm 4500 2010 M 300 mm 500 500 M 350 mm 50 50 M 400 mm 50 50 M 450 mm 50 50 M 500 mm 2500 1700 M 990 M 600 mm 4000 4000 M 3998.50 M TOTAL 11650 6350 M 6998.50 M 600mm 4000 M laid at site.

1 No. Pump house PCC Completed

2 Nos. Staff Qtr. (1 BHK 815 Sft. each) 1 No. completed. 11 KV VCB Panel 630 KV Transformer 500 KVA DG Set

Contd…P/6

(7)

Approval

No. & Date

( Rs. In lacs)

2015-16

( Rs. In

lacs)

of start

(Rs. in

lacs)

completion

9

Aug.

of

Master

water

supply

scheme

(Constructi

on

of

Ranney

Well

&

Tube Well

&

Tube

Wells)

Sec-75 to 89,

Faridabad

Rs. 198.50

Crores appd.

vide CA

HUDA

Panchkula

letter No.

40461 dt.

12.10.2012.

(6 Nos.

Ranney

Well)

3500.00

04/2013

8113.02

31.3.2016

A)Work of Rs. 63.48 Crores allot vide EE-3, HUDA Faridabad letter No. 2850-57 dated

25.03.2013. Work in progress.

Target

Achievement

Land

procurement

The land for 6 Nos. Ranney Well have been purchased by the agency

and transferred in the name of E.O. HUDA Fbd.

DI pipe

The DNIT quantity 9000 mtr. of 400 mm DI pipes received at site &

7500 M pipe laid at site.

VT Pump

All 24 Nos. VT pumps received

Motors

All 24 Nos. Motors received

Sluice valve

All 180 Sluice valves received

R/Wells construction status as under:-

R/Well

s Sr.

Nos.

Casting

(in mtrs.)

Well

sinking

(in mtrs.)

Pushing of laterals

5

30.50

29.50

Pushing started, done 254.40 out of 900 mtr.

6

19.30

19.00

Not started yet.

7

32.00

29.50

Pushing completed

8

36.00

33.00

Pushing completed

9

31.50

29.50

Pushing started (Done 208.80 M out of 900 M)

10

33.50

29.50

Pushing started (Done 69.6 mtr. out of 900 M)

Reasons of delay:-

Delay in the finalization of land due to selection of appropriate site for 6 Nos. Ranney Wells and purchase of land from Private owner by the contractor.

(8)

-:7 :-

Sr.

No.

Name of work

Estimated cost

/ Approval

No. & Date

( Rs. In lacs)

Budget for

the year

2015-16

( Rs. In lacs)

Likely date/

date of start

Upto date

Expd.

(Rs. in lacs)

Likely date

of

completion

Action

Plan

Remarks

Boosting &

rising main

14.08.2014

31.3.2016

B)

The work has been allotted to M/s Tirupati Cement Products for main

boosting station and rising main and status is as follows:-

Physical Target

Achievement

Purchase of land

6.7 Acre Land has been

purchased.

Const. of Main boosting station with

electrical , mechanical installation and

boundary wall.

Not started yet.

i) Pump house -1 No

Raft completed

ii) UGT 4500 KL-2 Nos.

Raft completed of 1 No. UGT

iii) Staff Qtr. 1 BHK -2 Nos.

iv) Staff Qtr. 2 BHK -1 Nos.

v) Office cum lab – 1 No.

vi) Guest House-1 No.

D.I. rising main

i) 800 mm -6000 M

5320 Mtr. received & 4440

Mtr. laid.

ii)1000 mm – 9250M

8490 Mtr. DI pipe received &

5900 mtr. laid

iii) 500 mm – 1600 Mtr.

1600

Mtr.

received

&

1138.50 Mtr. laid.

Centrifugal horizontal pumps - 5 Nos.

Independent Feeder – 9.0 km

10 Nos.

tubewells

15.10.2013

31.10.2015

C) The work for Rs.58.96 Lacs for providing and installation of 10 Nos.

Tubewells allotted on 15.10.2013. The work status as under:-

Physical Target

Achievement

Drilling of

Tubewell 10

Nos.

8 Nos. T.Ws. completed within restricted amount

due to increase in depth of tubewells. DNIT for 2

Nos. T.Ws. has been approved recently & tender

under process of approval.

(9)

( Rs. In lacs)

( Rs. In lacs)

10 Nos. pump

chamber

03.03.2014

31.12.2015

D) The Work for Rs.101.00 lacs for the construction of 10 Nos. Pump

chambers (16’x16’) at sector-75 to 89 Fbd. with boundary wall & 3 Nos. of

staff quarters along the green belt of 75M wide master road Fbd. complete

in all respect and all other works contingent thereto” allotted on 03.03.14 to

M/s Dutt builders

Physical Target

Achievement

Pump chamber 10 Nos.

enhanced to 15 Nos.

10 Nos. roof slab for tubewells

12 Nos. Boundary wall

3 Nos. staff qtr.

3 Nos. staff qtr. roof slab

Additional

5

Pump

Chamber & staff qtrs.

Increased from 10 Nos. to 15 Nos. has been

approved vide C.E.-I HUDA, Pkl. memo

No.10293 dt.25.08.2014 and work is in

progress.

Roads

06.08.2014

30.6.2015

Work completed.

15 Nos.

tubewells

Machinery

06.08.2014

31.12.2015

F)

DNIT for 15 Nos. tubewell machinery approved by C.E-I. HUDA

Panchkula vide memo No.4601 dated 15.04.2014 for Rs.26.46 lacs. Work

allotted to the agency M/s. Vishwakarma Engg. On dt.06.08.2014.

Physical Target

Achievement

Providing

and

installation

of

Machinery for tubewells – 15 Nos.

Machinery for 15Nos. tube

wells received at site.

C.I. specials as per DNIT

Except MS pipe received.

5 Nos.

tubewells

21.08.2014

31.01.2015

(Compd.)

G)

Work completed

Contd…P/9

(10)

-:9:-

Sr.

No.

Name of work

Estimated cost

/ Approval

No. & Date

( Rs. In lacs)

Budget for

the year

2015-16

( Rs. In lacs)

Likely date/

date of start

Upto date

Expd.

(Rs. in lacs)

Likely date

of

completion

Action

Plan

Remarks

10

Master water

supply Scheme

Sector -75 to

89, Fbd.

4785 Lacs. CA

No. 40476 dt.

12.10.2012

500.00

04/2013

1493.74

31.12.2015

The Detail of DI pipe received at site is as follows : -

Dia DNIT Qty. Received Laid 200 7940 7673 4939.50 250 2990 2970 1308.00 300 20610 12609 9524.40 350 2200 2021 1705.00 400 3585 3217 2029.00 450 2370 2119 1666.00 500 5990 6028 2989.50 600 4155 4278.50 2086.00 700 1450 1524 555.50 800 1180 1160.50 903.00 900 2235 1800 0.00 TOTAL 54705 45400 27705.90

27.7 km. DI pipes has been laid at site.

Reason for delay

The water supply line & SWD line are to be laid on the same side of road. The

deep excavation of SWD delayed the laying the water supply line which is to be

laid after SWD.

Divn. Palwal

11

Construction of

Gymkhana

Club

Sector-12, Palwal

492.75

41707-11

Dt.16.12.11

150.00

17.04.2012

139.21

31.12.2015

The work was allotted on the risk and cost of the M/s Lakshit Constructions to the

M/s Riyaz Enterprises vide E.E. Palwal letter No.7841-49 dt.03.09.2014.

The building structure has been completed. The finishing work and interior work

are in progress.

(11)

( Rs. In lacs)

( Rs. In lacs)

Divn. Elect.

12 Augmentation of water supply scheme at Faridabad (Ranney well project phase-3) Design , construction, erection & commissioning including purchase of land by the contractor for 6 nos. ranney well(Ranney well no 5 to 10) near village Basantpur to Mahawatpur & adjoining village along the bed of Yamuna river, Distt. Faridabad (Operation & mtc for 5 years on date of commissioning after completion of defect liability period of one year & other work contingent there to ( Electrical works)

198.50 crore

CA

40461, dt

12/10/2012 (E)

Provision 9.75

crore

200.00

15/01/2014 67.50 31/12/2015 12.0 km Poles and accessories have been completed & balance work is in progress.

13 Augmentation of water supply scheme for Sec-75 to 89, Faridabad (“Design, construction erection & commissioning of 20 MGD water supply scheme etc , consisting of main boosting station (MBS). Providing & fixing of DI rising mains from kaboolpur - khadar MBS to Sec-75 to 89, FBD(Electric works).

(12)

PERFORMA P-48A

STATUS OF MAJOR DEVELOPMENT WORKS HAVING BUDGET PROVISION OF RS.1.00 CRORE AND ABOVE

(WHICH ARE LIKELY TO BE COMPLETED AFTER THE YEAR 2015-2016 )

( UPTO 31.10.2015)

HUDA CIRCLE FARIDABAD

Sr.

No.

Name of work

Estimated cost /

Approval No. &

Date

(Rs. In lacs)

Budget for

the year

2015-16

(Rs. In lacs)

Likely

date/ date

of start

Upto date

Expd.

(Rs. in

lacs)

Likely date of

completion

Action

Plan

Remarks.

1

2

3

4

5

6

7

8

9

Divn.-1

1.

Prov. w/s scheme in

Transport Nagar

Sector-61 Faridabad

375.60 CA

(P)-21111

dated

20.08.2014.

150.00

22.7.2015

2.59

21.7.2016

Work started at site.

2.

Prov. SWD scheme in

Transport Nagar

Sector-61 Faridabad

349.50 CA

(P)-21145

dated

21.08.2014.

200.00

22.7.2015

0.00

21.7.2016

Work started at site.

Divn. -3, Fbd.

3.

Dev. of internal roads

Sec-77, Faridabad

1486.66 CA

15191 dt.

19.6.2014

500

Work started at site and in progress

4.

Internal SWD

Sec-77,Faridabad

253.32 / 45547-50

dt. 28.12.2013

200

5.

Internal Water Supply

Sec-77, Faridabad

451/17318-21 dt.

11.7.14

200

6.

Internal SWD Sec-78,

Faridabad

450.76/17338-41

dt. 11.7.14

200

-do-

7.

Internal W/S Sec-78,

Faridabad

693.62 / 17359.62

dt. 11.7.14

200

-do-

8.

Dev. of internal roads

Sec-78, Faridabad

2085

Lacs/19705.08

dt.5.8.14

(13)

(WHICH ARE LIKELY TO BE COMPLETED DURING THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

1

2

3

4

6

5

7

8

9

HUDA DIVISION No. II

1.

Prov. Distribution mains for Recycle

water for Zone-I, II & III, U/E,

Gurgaon.

2465.00

CA 3786

Dt.30.01.2012

1300.00

a

Prov. stringing out, jointing, cutting

and testing of D.I. pipes of 200mm to

600mm i/d sizes for recycled water,

prov. and laying M.S. pipe of size

600mm through trenchless method

etc. and all other works contingent

thereto. A/c Rs.8.45Crores (Work

enhanced from Rs.8,08,59,757/- to

Rs.11.99Crores) (Original Time limit

12 Months from 07.01.2013 to

06.01.2014)

07.01.2013

948.64

31.12.2015

(For clear

area)

--

90% i.e. 19.50Km work completed in

clear available portion, however total

DNIT scope is 21.48Km

1.98Km is under various hindrances

(Court Stay 0.20Km, Permission from

NHAI / IOCL 0.13Km, Encroachment

1.65Km)

b

Prov. stringing out, jointing, cutting

and testing of D.I. pipes of balance

100mm to 450mm i/d sizes for

recycled water, prov. and laying M.S.

pipe of size 300mm to 600mm i/d

through trenchless method, prov. and

fixing of sluice valves haudies and all

other works contingent thereto. A/c

Rs.13.00Crores / Rs.12.25Crores.

(Original Time limit 12 Months from

12.09.2014 to 11.09.2015)

12.09.2014

828.76

11.03.2016

--

70% i.e.28.50Km work completed

out of 41.78 Km, 12.97Km work is in

progress at site.

0.15Km work held up due to court

stay & 0.16Km due to IOCL approval

The progress got affected due to non

payment to the executing agency.

(14)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

2.

Const. of Northern Peripheral

Road from Kherki Daula to

Dwarka, Gurgaon

13178.00

CA 20851

Dt.24.05.2010

1000.00

a)

Const. of road in 14 K.M length of

available land

A/c

Rs.57.00Crores

(Work

enhanced from Rs.44,08,14,640/-

to Rs.50,01,99,531/-)

01.04.2011

4934.37

30.06.2015

Completed

--

Physical Status

16.20Km completed Out of total

length of NPR 18.00Km, details as :-

14.33Km upto Bituminous concrete

(B.C.), 1.20Km upto Granular Sub

Base (GSB) in ROB portion and

0.67Km earth)

0.33Km earth work is in progress under

sub work (b)

1.47Km work under allotment, as per

sub work (c)

Bottlenecks

Shifting of 220 / 66 K.V. Gantry poles

by

HVPNL

and

funds

of

Rs.13.60Crores to be transferred by

DHBVN to HVPNL

Shifting

of

220

K.V

lines

by

Underground

cabling

by

BBMB

Ballabgarh and deposit estimate is yet

to be submitted by BBMB

b)

Const. of Road (2 x 12.5m) of

Balance Portion & Cross Drainage

etc. (1.0Km Length)

Rs.980.00Lacs / Rs.783.90Lacs

01.03.2014

46.93

31.12.2015

--

0.67Km earth work completed and

remaining 0.33Km earth work in

progress.

The work delayed due to the agitation

of New Palam Vihar Residents and

now as per Orders of Hon’ble High

Court alternate plots are to be allotted

under rehabilitation & re-settlement

policy.

(15)

c)

Construction of road (2 x 12.5m)

at various locations (recently clear

from court stay) & cross drainage.

Rs.12.65Crores / Rs.995.25Lacs

--

0.00

--

Tender under process of approval at

Head Office Panchkula and work will

be executed after the clear possession

of land, subsequent to the allotment of

alternate plots to the affected residents

of New Palam Vihar Gurgaon.

d)

Const. of SWD in 14 K.M

available

land.

A/c

Rs.20.61Crores (Work enhanced

from

Rs.18,62,60,082/-

to

Rs.26,91,77,436/-)

(Original Time limit 12 Months

from 01.04.2013 to 31.03.2014)

22.03.2013

2108.70

31.05.2015

--

Work completed

e)

Const. of 4 Nos. Culverts

Rs.528.00Lacs

28.03.2013

401.39

31.03.2015

--

Work completed

3. Providing Distribution mains for

recycle water from Sector – 58 to

80, Gurgaon.

Providing Distribution mains for

recycle water from Sector – 81 to

115 (Zone – VII & VIII), Gurgaon

( M/s L & T Ltd.)

A/c

Rs.115.60Crores

/

Rs.11404.20Lacs.

(Original Time limit 12 Months

from 01.05.2013 to 30.04.2014)

7420.00

CA 3068

Dt.23.01.2012

16160.00

CA 3771

Dt.30.01.2012

3000.00

01.05.2013

10165.56

31.3.2016

(For Clear

area)

--

98% i.e.45.50Km work completed in

clear

available

portion

out

of

50.20Km, however total DNIT scope

is 58.40Km.

Recycling pipe line in 5.06Km in

progress.

7.84Km

in

various

hindrances

(Encroachment

0.79Km,

Railway

Permission

0.16Km,

Road

not

constructed

2.59Km,

Court

Stay

2.27Km & other hindrances 2.03Km)

(16)

Sr. No.

Name of Work Estimated Cost /App. No. & Dt.

(Rs. in Lacs)

Budget for the year 2015 - 2016 (Rs. in Lacs) Likely date/ date of start Upto date Expenditure (10/2015) (Rs. in Lacs) Likely date of completion

Action Plan Remarks.

4.

Providing master sewerage scheme of

Sector -77

-115 Urban Estate

Gurgaon

A/c Rs.124.70Crores

/Rs.12002.25Lacs.

(Original Time limit 18 Months from

16.01.2013 to 15.07.2014)

(Division No. II)

38148.00

CA3776 -80

Dt.30.01.2012

3000.00

21.01.2013

2955.59

31.3.2016

(On clear

available

land)

--

92% i.e. 41.56Km work completed

in

clear available portion (44.56Km) and

DNIT scope is 62.70Km.

Sewer line in 3.00Km in progress.

18.14Km in various hindrances (Under

acquisition 7.07Km, Court Stays 3.09Km,

Encroachments 5.94Km and change of

road alignment 2.04Km)

(Division No. V)

2000.00

2594.00

--

5.

Const. Of 120 MLD 2nd. STP & MPS at Behrampur, Gurgaon. Tender Amt. E/m Rs.90.00Lacs / Rs.98.10Crores.

Const. Cost = Rs.73.58Crores. 10% Commissioning = Rs.9.81Crores 15% O & M Charges = Rs.14.71Crores Total Cost = Rs.98.10Crores (Original Time limit 18 Months from 22.03.2012 to 21.09.2013 + 03 Months trial run)

10078.00

CA 6040

Dt.10.02.2011

200.00

22.03.2012

8367.60

31.05.2015

--

Work Completed

6.

Const. Of 100 MLD 2nd. STP & MPS at Dhanwapur, Gurgaon Tender Amt. E/m Rs.80.00Lacs / Rs.79.43Crores

Const. Cost = Rs.59.58Crores. 10% Commissioning = Rs.7.94Crores 15% O & M Charges = Rs.11.91Crores Total Cost = Rs.79.43Crores (Original Time limit 18 Months from 22.03.2012 to 21.09.2013 + 03 Months trial run)

9440.00

CA 5992

Dt.10.02.2011

500.00

23.03.2012

6566.13

31.05.2015

--

Work Completed

7

Const. of approaches of ROB on

Delhi Rewari Railway line.

A/C Rs.63.20Crores.

Restricted Amt. Rs.71.24Crores

(Original Time limit 15 Months

from 18.02.2014 to 17.05.2015)

7731.00

CA 39568-71

Dt.07.10.2013

1700.00

28.02.2014

5967.95

31.3.2016

--

90% work completed at site in HUDA

portion & balance work is in progress.

The work is affected due to non

availability of funds & likely to be

completed upto 31.3.2016 subjected to

the timely payment to the executing

agency.

(17)

HUDA DIVISION No. III

8.

Laying of water supply line for new

sectors i.e. 58-115

49805.00

CA No. 2655

Dt.19.01.2010

5500.00

25351.73

Total scope of work

D.I. pipe = 147.15 KM MS Pipe= 48.74 KM

a) Providing master water supply scheme(distribution mains) for new Sector-58 to 115 (Zone IV to VIII), U/E, Gurgaon. “Providing, stringing out, jointing, cutting and testing of 1600mm i/d, 1500mm i/d & 1400mm i/d M.S. pipe, providing and laying of sluice valves, construction of sluice valve haudies and all other works contingent thereto.” (including A/Mtc. 3 years) Rs.176.10Crores / Rs.144.40Crores 15.12.2012 31.03.2016 Length as per Agreement – 32.21Km. Total length = 32.21 Km 1600mm & 1500mm i/d MS pipe laid = 26.69 Km Bottle necks CPR = 3200 Mtr NH-8 Crossing = 150 Mtr SPR = 150 Mtr Railway = 2 x 110 Mtr Padmini = 1 x 250 Mtr Along GWS = 2 x 500 Mtr Multi Utility Corridor = 1 x 250 Mtr

NPR = 300 Mtr

Work Completed in Clear Land

b) Providing master water supply scheme for new sector 58 - 115 (distribution mains) for (Zone-IV to VIII), Gurgaon. "Providing, stringing out, jointing, cutting and testing of DI pipes (K9) of 200mm to 1200mm i/d sizes and 1200mm MS pipe, providing and fixing of sluice valves, zero velocity valve, scour valve, double action air valve and construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years).

Rs.76.10Crores / Rs.79.78Crores

01.04.2013 31.12.2015 72.925Km. pipe of

various sizes from 200mm i/d to

1200mm i/d

29.00Km pipe laid at site & work is in progress.

i) Total length of pipe line under

this agreement. = 73.00 Km. ii) Length already laid. = 29.00 Km. iii) Length of Dia of Pipe 200 to 400mm i/d can

be laid due to non acquisition of land. (on 24Mtr. road) = 34.00 Km. iv) Total length where SWD not constructed.

= 2.00 Km. v) Stay / Litigation / Encroachment / Non

acquisition of land. = 5.00 Km. vi) Balance work is in progress = 3.00 Km.

c)

Providing master water supply scheme

for new sector 58 - 115 (distribution mains) for (Zone-IV to VIII), Gurgaon. "Prov., stringing out, jointing, cutting and testing 1600mm &1500mm i/d MS pipe, providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years)

Rs.7630.00Lacs/Rs.7176.84Lacs

29.08.2014

31.12.2015

Total length =

13.80 Km.

Work allotted to M/s Tirupati Cement

Products

Total length = 13.80 Km.

Pipe received = 13.80 Km.

Laid = 10.20 Km.

(18)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

9.

Designing

constructing

testing

commissioning

operation

and

maintenance for 5 years after 12

months defect liability period of

second water works comprising of

Raw Water pumping Machinery 22

MGD Automated Water Treatment

plant clear water tank clear water

pumping machinery Pre and post

chlorination lowering of sub soil

water 1000mm diameter MS rising

main for clear water pumps up to

Gurgaon water supply canal near

water works transformer SCADA and

all other works contingent thereto

complete in all respect on Turnkey

basis for HUDA at village Chandu

Budhera

District

Gurgaon

Haryana.(3

rd

unit)

Rs.3000.00Lacs / Rs.2668.25Lacs

3830.00

CA.11802-05

Dt.11.03.2013

200.00

15.04.2013

3346.85

31.05.2015

Work

Completed

Work Completed

The Water Treatment Plant has been

completed and tested.

10.

Augmentation of master water supply

scheme (Zone-I), U/E, Gurgaon.

“Providing, stringing out, jointing,

cutting and testing of DI pipes (K9)

of 200mm to 1200mm i/d sizes,

providing and fixing of sluice valves,

zero velocity valve, scour valve,

double

action

air

valve

and

construction of sluice valve haudies

and all other works contingent

thereto." (including A/Mtc. defect

liability period for 3 years).

Rs.852.00Lacs / Rs.948.65Lacs

2649.00

CA.11807-10

Dt.11.03.2013

500.00

02.12.2013

1862.83

31.12.2015

Total scope of

work

D.I. Pipe =

20.54Km.

12.50 Km D.I. pipe laid at site and work is in

progress.

MS pipe of size 1200mm i/d = 1.06 Km &

800mm i/d = 0.18 Km received at site.

(Work is in progress)

(19)

HUDA DIVISION No. V

11. Construction of Master Roads in

New Sector – 99 to 115, Gurgaon.

21255.00

CA.23387

Dt.09.06.2010

1000.00

8749.74

Total Road length against approved

estimate = 30.88Km.

a)

A/C Rs.82.70Crores,

Const. of 60Mtr. & 75 Mtr. Road

20.11.2011

Work

completed

(in clear area)

Work completed

b)

A/C Rs.856.30Lacs,

Const. of 60Mtr. Road recently

acquired road.

29.03.2013

Work

completed

Work completed

c)

A/C Rs.5.30Crores,

Const. of 2 Nos. bridges / culvert

16.04.2013

Work

completed

Work completed

d) A/C Rs.13.00Crores

Construction of Balance road

dividing Sector – 101/104

27.04.2015

26.01.2016

Earth work completed in 450Mtr. length

(one side).

e)

A/C Rs.2.30Crores

Const. of road work for part

connectivity in dividing Sector –

99/102, 102/102A, 102A/103 &

106/109 with NPR road.

27.04.2015

26.12.2015

Earth

work

completed

&

WMM

(20)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

12. Construction of Govt. College of

Commerce Balance Sector – 51,

Gurgaon.

Rs.2958.00Lacs / Rs.2723.00Lacs

4003.30

CA.24523-27

Dt.17.05.2013

Education

Deptt. =

3450.50Lacs

HUDA =

522.80Lacs

400.00

15.07.2013

2847.88

31.12.2015

Main building, Boy’s Hostel, Girl’s

Hostel have been completed upto

flooring & plastering. Painting &

sanitary work in progress.

The Auditorium & Staff quarters

completed upto plaster work &

flooring work in progress.

Over all 93% work completed. The

progress is affecting due to shortage

of funds.

13.

Master Sewer Leg No. V (58 to 76) Rs.3540.00Lacs

11650.00

CA.41727-31

Dt.16.12.2011

700.00

01.04.2012

2931.40

31.12.2015

(100%

Work

Completed

on

available

land on

31.03.2015)

Total length against allotted work

= 23.44Km.

Completed = 20.43Km.

Length of sewer laid by MCG on

Sohna road

=2.31 Km

Superintending Engineer,

HUDA Circle – I, Gurgaon.

(21)

(WHICH ARE LIKELY TO BE COMPLETED AFTER THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date of

completion

Action Plan

Remarks.

1

Const. of Railway portion of

ROB on Delhi – Reweri Railway

line.

6391.00

CA 13629

Dt.18.03.2013

3195.00

21.09.2015

3196.00

21.06.2016

--

a) Physical Status

1. Rs.31.96Crores i.e. 50% amount released & deposited to Railway Deptt. by the XEN-II vide his office memo No. 17757 dated 11.09.2013 for inviting tenders in C.E. of Railway, however Railway has demanded balance 50% amount in the meeting held on 29.07.2015

2. The work was allotted on 21.09.2015. The completion period is 9 months & work is in progress and therefore work likely to be completed upto 21.06.2016, if Railway adheres to its time schedule.

3. Deposit estimate of service crossing to be submitted by Railway Deptt.

Superintending Engineer,

HUDA Circle – I, Gurgaon.

(22)

PERFORMA P-47A

STATUS OF MAJOR DEVELOPMENT WORKS HAVING BUDGET PROVISION OF Rs.1.00 CRORE AND ABOVE

(WHICH ARE LIKELY TO BE COMPLETED DURING THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

1

2

3

4

6

5

7

8

9

HUDA DIVISION No. II

1.

Prov. Distribution mains for Recycle

water for Zone-I, II & III, U/E,

Gurgaon.

2465.00

CA 3786

Dt.30.01.2012

1300.00

a

Prov. stringing out, jointing, cutting

and testing of D.I. pipes of 200mm to

600mm i/d sizes for recycled water,

prov. and laying M.S. pipe of size

600mm through trenchless method

etc. and all other works contingent

thereto. A/c Rs.8.45Crores (Work

enhanced from Rs.8,08,59,757/- to

Rs.11.99Crores) (Original Time limit

12 Months from 07.01.2013 to

06.01.2014)

07.01.2013

948.64

31.12.2015

(For clear

area)

--

90% i.e. 19.50Km work completed in

clear available portion, however total

DNIT scope is 21.48Km

1.98Km is under various hindrances

(Court Stay 0.20Km, Permission from

NHAI / IOCL 0.13Km, Encroachment

1.65Km)

b

Prov. stringing out, jointing, cutting

and testing of D.I. pipes of balance

100mm to 450mm i/d sizes for

recycled water, prov. and laying M.S.

pipe of size 300mm to 600mm i/d

through trenchless method, prov. and

fixing of sluice valves haudies and all

other works contingent thereto. A/c

Rs.13.00Crores / Rs.12.25Crores.

(Original Time limit 12 Months from

12.09.2014 to 11.09.2015)

12.09.2014

828.76

11.03.2016

--

70% i.e.28.50Km work completed

out of 41.78 Km, 12.97Km work is in

progress at site.

0.15Km work held up due to court

stay & 0.16Km due to IOCL approval

The progress got affected due to non

payment to the executing agency.

(23)

2.

Const. of Northern Peripheral

Road from Kherki Daula to

Dwarka, Gurgaon

13178.00

CA 20851

Dt.24.05.2010

1000.00

a)

Const. of road in 14 K.M length of

available land

A/c Rs.57.00Crores (Work enhanced

from

Rs.44,08,14,640/-

to

Rs.50,01,99,531/-)

01.04.2011

4934.37

30.06.2015

Completed

--

Physical Status

16.20Km completed

Out of total length of

NPR 18.00Km, details as :-

14.33Km upto Bituminous concrete (B.C.),

1.20Km upto Granular Sub Base (GSB) in

ROB portion and 0.67Km earth)

0.33Km earth work is in progress under

sub work (b)

1.47Km work under allotment, as per sub

work (c)

Bottlenecks

Shifting of 220 / 66 K.V. Gantry poles by

HVPNL and funds of Rs.13.60Crores to be

transferred by DHBVN to HVPNL

Shifting of 220 K.V lines by Underground

cabling by BBMB Ballabgarh and deposit

estimate is yet to be submitted by BBMB

b)

Const. of Road (2 x 12.5m) of

Balance Portion & Cross Drainage

etc. (1.0Km Length)

Rs.980.00Lacs / Rs.783.90Lacs

01.03.2014

46.93

31.12.2015

--

0.67Km earth work completed

and

remaining 0.33Km earth work in progress.

The work delayed due to the agitation of

New Palam Vihar Residents and now as

per Orders of Hon’ble High Court

alternate plots are to be allotted under

rehabilitation & re-settlement policy.

(24)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

c)

Construction of road (2 x 12.5m)

at various locations (recently clear

from court stay) & cross drainage.

Rs.12.65Crores / Rs.995.25Lacs

--

0.00

--

Tender under process of approval at

Head Office Panchkula and work will

be executed after the clear possession

of land, subsequent to the allotment of

alternate plots to the affected residents

of New Palam Vihar Gurgaon.

d)

Const. of SWD in 14 K.M

available

land.

A/c

Rs.20.61Crores (Work enhanced

from

Rs.18,62,60,082/-

to

Rs.26,91,77,436/-)

(Original Time limit 12 Months

from 01.04.2013 to 31.03.2014)

22.03.2013

2108.70

31.05.2015

--

Work completed

e)

Const. of 4 Nos. Culverts

Rs.528.00Lacs

28.03.2013

401.39

31.03.2015

--

Work completed

3. Providing Distribution mains for

recycle water from Sector – 58 to

80, Gurgaon.

Providing Distribution mains for

recycle water from Sector – 81 to

115 (Zone – VII & VIII), Gurgaon

( M/s L & T Ltd.)

A/c

Rs.115.60Crores

/

Rs.11404.20Lacs.

(Original Time limit 12 Months

from 01.05.2013 to 30.04.2014)

7420.00

CA 3068

Dt.23.01.2012

16160.00

CA 3771

Dt.30.01.2012

3000.00

01.05.2013

10165.56

31.3.2016

(For Clear

area)

--

98% i.e.45.50Km work completed in

clear

available

portion

out

of

50.20Km, however total DNIT scope

is 58.40Km.

Recycling pipe line in 5.06Km in

progress.

7.84Km

in

various

hindrances

(Encroachment

0.79Km,

Railway

Permission

0.16Km,

Road

not

constructed

2.59Km,

Court

Stay

2.27Km & other hindrances 2.03Km)

(25)

4.

Providing master sewerage scheme of

Sector -77

-115 Urban Estate

Gurgaon

A/c Rs.124.70Crores

/Rs.12002.25Lacs.

(Original Time limit 18 Months from

16.01.2013 to 15.07.2014)

(Division No. II)

38148.00

CA3776 -80

Dt.30.01.2012

3000.00

21.01.2013

2955.59

31.3.2016

(On clear

available

land)

--

92% i.e. 41.56Km work completed

in

clear available portion (44.56Km) and

DNIT scope is 62.70Km.

Sewer line in 3.00Km in progress.

18.14Km in various hindrances (Under

acquisition 7.07Km, Court Stays 3.09Km,

Encroachments 5.94Km and change of

road alignment 2.04Km)

(Division No. V)

2000.00

2594.00

--

5.

Const. Of 120 MLD 2nd. STP &

MPS at Behrampur, Gurgaon. Tender

Amt. E/m Rs.90.00Lacs /

Rs.98.10Crores.

Const. Cost =

Rs.73.58Crores.

10% Commissioning =

Rs.9.81Crores

15% O & M Charges =

Rs.14.71Crores

Total Cost =

Rs.98.10Crores

(Original Time limit 18 Months from

22.03.2012 to 21.09.2013 + 03

Months trial run)

10078.00

CA 6040

Dt.10.02.2011

200.00

22.03.2012

8367.60

31.05.2015

--

Work Completed

6.

Const. Of 100 MLD 2nd. STP &

MPS at Dhanwapur, Gurgaon Tender

Amt. E/m Rs.80.00Lacs /

Rs.79.43Crores

Const. Cost =

Rs.59.58Crores.

10% Commissioning =

Rs.7.94Crores

15% O & M Charges =

Rs.11.91Crores

9440.00

CA 5992

Dt.10.02.2011

500.00

23.03.2012

6566.13

31.05.2015

--

Work Completed

(26)

Total Cost =

Rs.79.43Crores

(Original Time limit 18 Months from

22.03.2012 to 21.09.2013 + 03

Months trial run)

7

Const. of approaches of ROB on

Delhi Rewari Railway line.

A/C Rs.63.20Crores.

Restricted Amt. Rs.71.24Crores

(Original Time limit 15 Months from

18.02.2014 to 17.05.2015)

7731.00

CA 39568-71

Dt.07.10.2013

1700.00

28.02.2014

5967.95

31.3.2016

--

90% work completed

at site in HUDA

portion & balance work is in progress.

The work is affected due to non

availability of funds & likely to be

completed upto 31.3.2016 subjected to the

timely payment to the executing agency.

(27)

HUDA DIVISION No. III

8.

Laying of water supply line for new

sectors i.e. 58-115

49805.00

CA No. 2655

Dt.19.01.2010

5500.00

25351.73

Total scope of work

D.I. pipe = 147.15 KM MS Pipe= 48.74 KM

a)

Providing master water supply scheme(distribution mains) for new Sector-58 to 115 (Zone IV to VIII), U/E, Gurgaon. “Providing, stringing out, jointing, cutting and testing of 1600mm i/d, 1500mm i/d & 1400mm i/d M.S. pipe, providing and laying of sluice valves, construction of sluice valve haudies and all other works contingent thereto.” (including A/Mtc. 3 years) Rs.176.10Crores / Rs.144.40Crores

15.12.2012

31.03.2016

Length as per

Agreement –

32.21Km.

Total length = 32.21 Km 1600mm & 1500mm i/d MS pipe laid = 26.69 Km Bottle necks CPR = 3200 Mtr NH-8 Crossing = 150 Mtr SPR = 150 Mtr Railway = 2 x 110 Mtr Padmini = 1 x 250 Mtr Along GWS = 2 x 500 Mtr Multi Utility Corridor = 1 x 250 Mtr

NPR = 300 Mtr

Work Completed in Clear Land

b)

Providing master water supply scheme for new sector 58 - 115 (distribution mains) for (Zone-IV to VIII), Gurgaon. "Providing, stringing out, jointing, cutting and testing of DI pipes (K9) of 200mm to 1200mm i/d sizes and 1200mm MS pipe, providing and fixing of sluice valves, zero velocity valve, scour valve, double action air valve and construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years).

Rs.76.10Crores / Rs.79.78Crores

01.04.2013

31.12.2015

72.925Km. pipe

of various sizes

from 200mm i/d

to 1200mm i/d

29.00Km pipe laid at site & work is in progress.

vii)Total length of pipe line under

this agreement. = 73.00 Km. viii) Length already laid. = 29.00 Km. ix)Length of Dia of Pipe 200 to 400mm i/d can be laid

due to non acquisition of land. (on 24Mtr. road) = 34.00 Km.

x) Total length where SWD not constructed. = 2.00 Km.

xi)Stay / Litigation / Encroachment / Non acquisition of land. = 5.00 Km.

xii) Balance work is in progress = 3.00 Km.

c)

Providing master water supply scheme for new sector 58 - 115 (distribution mains) for (Zone-IV to VIII), Gurgaon. "Prov., stringing out, jointing, cutting and testing 1600mm &1500mm i/d MS pipe, providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years)

Rs.7630.00Lacs/Rs.7176.84Lacs

29.08.2014

31.12.2015

Total length =

13.80 Km.

Work allotted to M/s Tirupati Cement

Products

Total length = 13.80 Km.

Pipe received = 13.80 Km.

Laid = 10.20 Km.

(28)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

9.

Designing

constructing

testing

commissioning

operation

and

maintenance for 5 years after 12

months defect liability period of

second water works comprising of

Raw Water pumping Machinery 22

MGD Automated Water Treatment

plant clear water tank clear water

pumping machinery Pre and post

chlorination lowering of sub soil

water 1000mm diameter MS rising

main for clear water pumps up to

Gurgaon water supply canal near

water works transformer SCADA and

all other works contingent thereto

complete in all respect on Turnkey

basis for HUDA at village Chandu

Budhera

District

Gurgaon

Haryana.(3

rd

unit)

Rs.3000.00Lacs / Rs.2668.25Lacs

3830.00

CA.11802-05

Dt.11.03.2013

200.00

15.04.2013

3346.85

31.05.2015

Work

Completed

Work Completed

The Water Treatment Plant has been

completed and tested.

10.

Augmentation of master water supply

scheme (Zone-I), U/E, Gurgaon.

“Providing, stringing out, jointing,

cutting and testing of DI pipes (K9)

of 200mm to 1200mm i/d sizes,

providing and fixing of sluice valves,

zero velocity valve, scour valve,

double

action

air

valve

and

construction of sluice valve haudies

and all other works contingent

thereto." (including A/Mtc. defect

liability period for 3 years).

Rs.852.00Lacs / Rs.948.65Lacs

2649.00

CA.11807-10

Dt.11.03.2013

500.00

02.12.2013

1862.83

31.12.2015

Total scope of

work

D.I. Pipe =

20.54Km.

12.50 Km D.I. pipe laid at site and work

is in progress.

MS pipe of size 1200mm i/d = 1.06 Km

& 800mm i/d = 0.18 Km received at site.

(Work is in progress)

(29)

HUDA DIVISION No. V

11. Construction of Master Roads in

New Sector – 99 to 115, Gurgaon.

21255.00

CA.23387

Dt.09.06.2010

1000.00

8749.74

Total Road length against approved

estimate = 30.88Km.

a)

A/C Rs.82.70Crores,

Const. of 60Mtr. & 75 Mtr. Road

20.11.2011

Work

completed

(in clear area)

Work completed

b)

A/C Rs.856.30Lacs,

Const. of 60Mtr. Road recently

acquired road.

29.03.2013

Work

completed

Work completed

c)

A/C Rs.5.30Crores,

Const. of 2 Nos. bridges / culvert

16.04.2013

Work

completed

Work completed

d) A/C Rs.13.00Crores

Construction of Balance road

dividing Sector – 101/104

27.04.2015

26.01.2016

Earth work completed in 450Mtr. length

(one side).

e)

A/C Rs.2.30Crores

Const. of road work for part

connectivity in dividing Sector –

99/102, 102/102A, 102A/103 &

106/109 with NPR road.

27.04.2015

26.12.2015

Earth

work

completed

&

WMM

(30)

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

12. Construction of Govt. College of

Commerce Balance Sector – 51,

Gurgaon.

Rs.2958.00Lacs / Rs.2723.00Lacs

4003.30

CA.24523-27

Dt.17.05.2013

Education

Deptt. =

3450.50Lacs

HUDA =

522.80Lacs

400.00

15.07.2013

2847.88

31.12.2015

Main building, Boy’s Hostel, Girl’s

Hostel have been completed upto

flooring & plastering. Painting &

sanitary work in progress.

The Auditorium & Staff quarters

completed upto plaster work &

flooring work in progress.

Over all 93% work completed. The

progress is affecting due to shortage

of funds.

13.

Master Sewer Leg No. V (58 to 76) Rs.3540.00Lacs

11650.00

CA.41727-31

Dt.16.12.2011

700.00

01.04.2012

2931.40

31.12.2015

(100%

Work

Completed

on

available

land on

31.03.2015)

Total length against allotted work

= 23.44Km.

Completed = 20.43Km.

Length of sewer laid by MCG on

Sohna road

=2.31 Km

Superintending Engineer,

HUDA Circle – I, Gurgaon.

(31)

(WHICH ARE LIKELY TO BE COMPLETED AFTER THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date of

completion

Action Plan

Remarks.

1

Const. of Railway portion of

ROB on Delhi – Reweri Railway

line.

6391.00

CA 13629

Dt.18.03.2013

3195.00

21.09.2015

3196.00

21.06.2016

--

a) Physical Status

4. Rs.31.96Crores i.e. 50% amount released & deposited to Railway Deptt. by the XEN-II vide his office memo No. 17757 dated 11.09.2013 for inviting tenders in C.E. of Railway, however Railway has demanded balance 50% amount in the meeting held on 29.07.2015

5. The work was allotted on 21.09.2015. The completion period is 9 months & work is in progress and therefore work likely to be completed upto 21.06.2016, if Railway adheres to its time schedule.

6. Deposit estimate of service crossing to be submitted by Railway Deptt.

Superintending Engineer,

HUDA Circle – I, Gurgaon.

References

Related documents

The purpose of this phenomenological study is to interpret the stories of the greater Atikokan community and provide content in the development of Quetico Provincial Park‟s

In this study, it is aimed to develop the Science Education Peer Comparison Scale (SEPCS) in order to measure the comparison of Science Education students'

Proprietary Schools are referred to as those classified nonpublic, which sell or offer for sale mostly post- secondary instruction which leads to an occupation..

The key segments in the mattress industry in India are; Natural latex foam, Memory foam, PU foam, Inner spring and Rubberized coir.. Natural Latex mattresses are

Online community: A group of people using social media tools and sites on the Internet OpenID: Is a single sign-on system that allows Internet users to log on to many different.

Control of working capital - An understanding of the methods a business might use to stock, debtor and creditor improve the control of its working capital. Links here should be

All of the participants were faculty members, currently working in a higher education setting, teaching adapted physical activity / education courses and, finally, were

[r]