IRC:19-2005
STANDARD
SPECIFICATIONS
AND
CODE
OF
PRACTICE
FOR
WATER BOUND
MACADAM
(Third Revision)
THE
INDIAN
ROADS CONGRESS
IRC:
19-2005
STANDARD
SPECIFICATIONS
AND
CODE
OF
PRACTICE
FOR
WATER BOUND
MACADAM
(Third Revision)
Published
by
THE
INDIAN
ROADS
CONGRESS
Kama
Koti
Marg,
Sector
6,R.K.
Puram,
New
Delhi
-
110
022
2005
Price
Rs.
IRC: 19-2005
FirstPublished April,
1966
February,1970
May, 1972
November, 1972
May, 1977
September,
1982
March,
1987
(incorporatesamendment
No.
1&
Corrected
Sieve
sizes)Reprinted Reprinted FirstRevision
Second
Revision Reprinted RepriiK. Reprinted Reprinted Reprinted ReprintedMay, 1988
March,
1999
April,2002
May, 2005
October,2000
ThirdRevision Reprinted ReprintedSeptember,
2006
February,2008
Reprinted October,2009
Reprinted : July,20
11(The Rights
of
Publicationand
Translationare
reserved)The
officialamendments
to thiscode
would
be published
by
theIRC
in itsperiodical, ^Indian
Highways
',which
shallbe
considered as
effective
and
as
part
of
theCode/Guidelines/Manual,
etc.from
thedate
specified thereinPrintedatAravali Printers
&
Publishers (P.) Ltd.New
Delhi 110020
IRC:
19-2005
CONTENTS
Personnel ofthe
Highways
Specificationsand
StandardsCommittee
(i)&
(ii)1. Introduction 1
2.
Scope
33. Materials 4
4. Construction Procedure 7
5. Surface Evenness of
WBM
Course
96. Rectificationof Defective Construction 10
7. Construction of
WBM
overNarrow
Widths 10Digitized
by
the
Internet
Archive
in
2014
IRC:
19-2005
PERSONNEL
OF
THE HIGHWAYS
SPECIFICATIONS
AND
STANDARDS
COMMITTEE
(As
on
10-12-2004)
1. V.Velayutham
(Convenor)
2. G. Sharan
(Co-Convenor)
3. ChiefEngineer
(R&B)
S&R
(
Member-Secretary
) A.P.Bahadur
5. P.K. Chakarabarty 6. P.K. Dutta 7. J.P. Desai 8. Dr. S.L.Dhingra
9.A.N.
Dhodapkar
10. D.P.Gupta
11.S.K.Gupta
12. R.K. Jain 13. Dr. S.S. Jain 14. Dr. L.R. Kadiyali15. Prabha
Kant
Katare16. J.B.
Mathur
17. H.L.Meena
18. S.S.Momin
19.A.B.
Pawar
20. Dr.Gopal Ranjan
21. S.S. Rathore22.
Arghya
PradipSaha
23. S.C.
Sharma
24. Dr. P.K.
Nanda
25. Dr. C.K. Singh
Addl. Director General, MinistryofShipping,
Road
Transport&
Highways,
New
DelhiMember
(Tech),NHAI,
New
DelhiMinistryofShipping,
Road
Transport&
Highways,New
DelhiMembers
Chief Engineer, Ministry of Shipping,
Road
Transport&
Highways,
New
DelhiChief Engineer
Ministry of Shipping,Road
Transport&
Highways,
New
DelhiExecutive Director, Consulting Engg. Services (I) Pvt. Ltd.,
New
DelhiSr.Vice-President (Tech.Ser.),Gujarat
Ambuja
Cements
Ltd.,Ahmedabad
Professor, IndianInstituteofTechnology,
Mumbai
Director,
NITHE,
NOIDA
DG
(RD)
&
AS,
MOST
(Retd.),New
Delhi ChiefEngineer, UttaranchalPWD,
Almora
Chief Engineer(Retd.), Sonepat
Professor
&
Coordinator
(COTE),
Indian Institute of Technology,Roorkee
ChiefExecutive, L.R. Kadiyali
&
Associates,New
DelhiJointDirector(PI.),NationalRural
Roads
Dev.Agency
(Min
of Rural Dev.),New
DelhiChief Engineer (Retd.),
NOIDA
ChiefEngineer-cum-Addl. Secy, to the Govt, of Rajasthan,
PWD,
JaipurSecretary (Works), Maharastra
PWD,
Mumbai
Secretary (Works) (Retd.),
Pune
Director,College ofEngg.
Roorkee
Secretary to the
Govt, of
Gujarat,R&B
Department,
GandhinagarSr.Consultant,
New
DelhiDG
(RD)
&
AS,
MORT&
H
(Retd.),New
DelhiDirector, Central
Road
Research Institute,New
Delhi Engineer inChief-cum
Addl.Comm
cum
Spl Secy. (Retd.)Ranchi
IRC:
19-2005
26. NirmalJitSingh
27. A.V. Sinha 28. N.K. Sinha 29 V.K. Sinha 30. K.K. Sarin 31. T.P.
Velayudhan
32. Maj. V.C.Verma
33.
The
Chief Engineer(NH)
34.
The
Chief Engineer(Pig.)
35.
The
Chief Engineer(Mech)
36.
The
Chief Engineer(Mech)
37.
The
Chief Engineer(NH)
38.
The
Engineer-in-Chief39.
The
Chief Engineer40. President
Indian
Roads
Congress41. Director General
(Road Development)
&
Special Secretary42. Secretary
Indian
Roads
Congress1.
M.K.
Agarwal
2. Dr. C.E.G. Justo3.
M.D.
Khattar4.
Sunny
C.Madhathil5. N.V.
Merani
Member
(Tech.), NationalHighways
Authority of India,New
DelhiChiefGeneralManager,National
Highways
AuthorityofIndia,New
DelhiDG
(RD)&SS,
MOSRT& H
(Retd.),New
DelhiChief Engineer, Ministry of Shipping,
Road
Transport&
Highways,
New
DelhiDG
(RD)
&
AS,
MOST
(Retd.),New
DelhiAddl. D.G., Directorate General Border Roads,
New
DelhiExecutive Director, Marketing, Oriental Structural Engrs.
Pvt. Ltd,
New
Delhi(B. Prabhakar Rao),
R&B
Department,Hyderabad
(S.B. Basu), Ministry of Shipping,
Road
Transport&
Highways,
New
Delhi(V.K. Sachdev), Ministry of Shipping,
Road
Transport&
Highways,
New
DelhiPWD,
Kolkata(Ratnakar Dash), Sachivalaya
Marg, Bhubaneshwar
(TribhuvanRam)
U.P.PWD,
Lucknow
vlational
Highways,
PWD,
BangaloreEx-Officio
Members
(S.S.
Momin),
Secretary (Works),Mumbai
(Indu Prakash), MinistryofShipping,
Road
Transport&
Highways,
New
Delhi(R.S. Sharma), Indian
Roads
Congress,New
DelhiCorresponding
Members
Engineer-in-Chief,
Haryana
PWD
(Retd.), PanchkulaEmeritusFellow, BangaloreUniversity, Bangalore
ExecutiveDirector,Hindustan ConstructionCo.Ltd.,
Mumbai
Director(Project), Bhagheeratha Engg. Ltd.,
Cochin
Principal Secretary, Maharashtra
PWD
(Retd.),Mumbai
IRC:
19-2005
STANDARD
SPECIFICATIONS
AND CODE
OF PRACTICE
FOR
WATER BOUND
MACADAM
1.
INTRODUCTION
1.1 This standard
was
originallypublishedin 1966.The
first revision ofthe standardwas
approved bythe SpecificationsandStandardsCommittee
intheirmeeting held
on
the 29th&
30
thSeptember,
1972,bytheExecutive
Committee
in theirmeetingheldat
Gandhinagar on
the 25thNovember,
1972
and by the Council in their
79
thmeeting held at
Gandhinagar on
the 25thNovember,
1972
for publication. Following the decision of theIRC
Councilatitsmeetingheldonthe28th
August, 1976,
thetoleranceofsurfaceevenness
were
revisedon
the basis of
IRC
Special Publication 16 "SurfaceEvennessof
Highway
Pavements" andthesecondrevision of standard
was
published inMay,
1977
which
was
furtheramended
in March, 1987.The
decisiontoreviewand
revise thecode
ofpractice
was
taken during meeting of FlexiblePavement Committee on
10thFebruary,2001.
The
task
was
assigned
to Dr. P.K. Jainand
K.
Sitaramanjaneyulu, Scientists of Central
Road
Research Institute.
The
draftofthe revised codewas
presentedand
discussed in the meeting ofFlexible
Pavement Committee
heldon
17
th
May,
2002 and
itwas
decided thatthe draftdocument
may
be modified inthe light ofthecomments
ofthe
members
and
sent toConvenor,
FlexiblePavement Committee
forforwardingtoHighways
Specifications
&
Standards(HSS)
Committee.Dr. P.K.Jain,andShri K.Sitaramanjaneyulumodifiedthe
document
and forwardedtoConvenor,FlexiblePavement
Committee.
The
draft standardwas
reviewed
by
the FlexiblePavement Committee
(constituted inJanuary, 2003) in itsmeeting held
on
1st
August,
2003
and
authorized aGroup
consistingofShri S.C. Sharma,Shri K.K. Singal
and
Dr. P.K. Jain to finalise thedocument
incorporatingthesuggestionsofthe
members
andforward the
same
toHSS
Committee.The
draftstandard
was
finalisedbytheGroup
initsmeetingheld
on
7thMay, 2004
and
then
sent forconsideration of
HSS
Committee.
Members
of FlexiblePavement Committee up
toDecember
2002
S.C.Sharma
Secretary
R&B,
Gujarat.(S.S.Rathore) Dr.S.S.Jain D.Basu Dr.A.K. Bhatnagar S.K.Bhatnagar Dr.Animesh Das Dr.M.PDhir D.P.Gupta Dr.L.R.Kadiyali Dr.CE.G.Justo H.L.
Meena
Prof.B.B.Pandey R.K.Pandey SukomalChakrabarti Dr. P.K. JainMembers
CorrespondingMembers
R.S.Shukla Convenor Co-Convenor Member-Secretary Prof.C.G.SwaminathanC.E (R)
S&R,
T&T
(JaiPrakash) Rep. ofDG(W),
E-in-CBr.(Col.R.N.Malhotra)
Rep. of
DGBR
(Hargun Das)Head,
FP
Dn.,CRRI
(Dr.SunilBose) Director,HRS,
Chennai S.KNirmal Smt.A.P.JoshiAHQ
IRC:
19-2005
Members
of FlexiblePavement
Committee
reconstituted w.e.f.January 2003
S.C.
Sharma
Convenor
Chief Engineer(Roads), ....
Co-Convenor
PWD,
Guwahati
Dr. S.S. JainMember-Secretary
Members
Aran
BajajSukomal
Chakraborty Dr.Animesh Das
D.P.Gupta
Dr. L.R. Kadiyali D.Mukhopadhyay
Dr. B.B.Pandey
R.K.Pandey
R.S.Shukla K.K.Singal Dr. A. Veeraragavan Dr. P.K. Jain Dr. C.E.G. Justo J.T. NashikkarCorresponding
Members
Chief Engineer
(R&B)
S&R
MORT&H
A
Rep. ofIOC,
Faridabad(B.R. Tyagi)
A
Rep. ofE-in-C'sBranch
(Col. V.K.P. Singh)
A
Rep. ofDGBR
(P.K.
Mahajan)
Area
Co-ordinator(FP
Dn.),CRRI
(Dr. SunilBose)
Director,
HRS,
Chennai
S.K.Nirmal
The Manager
(Bitumen),HPC,
Mumbai
(VijayKr. Bhatnagar)The
draftdocument
finalisedby
the FlexiblePavement Committee was
consideredby
theHighways
SpecificationsandStandardsCommittee
in its meeting heldon
10thDecember,
2004
and approvedwithcertainmodifications.The
Council in its 173rdmeeting held
on
8thJanuary,
2005
atBangaloreapprovedthedocument
forpublication subjecttomodificationinlightof
the
comments/suggestions
given
by
theparticipants.
The
document was
modifiedsuitablyby
Shri S.C.Sharma, Convenor,
FlexiblePavement Committee
andprintedby
IRC
asThird Revision ofIRC:19.1.2.
Symbols and
Abbreviations
1.2.1
For
thepurpose
of this Standard, thefollowing
symbols
forSIunitsand
abbreviationsshallapply.
1.2.1.1
Symbols
forSI UnitskN
kilo-newtonm
mm
metre millimetre 1.2.1.2 AbbreviationsBS
BritishStandardsIRC
IndianRoads
CongressIS Indian Standard
by Bureau
ofIndianStandards
LL
Liquid LimitPI PlasticityIndex
WBM
Water
Bound
Macadam
1.3.
References
1.3.1
The
followingIRC,
ISand
BS
standardscontainprovisions,which, through referenceinthe
text,constituteprovisionsofthis standard.
At
thetime of publication, the editions indicated
were
valid. All standards are subject to revision andparties to agreements based
on
this standardareencouragedto investigate thepossibilityof applying
IRC: 19-2005
the
most
recenteditions ofthestandard indicatedbelow
No.
Title IRC:SP: 16-2004 IS460:Part 1 : 1985 IS460:Part2 : 1985IS460:Part3:
1985 IS2386:Part 1-1963 IS2386:Part3-1963 IS 2386:Part4-19 IS2430:1986 IS5640:1970 IS 14685-1999BS
1047:1983Guidelines for Surface
Evenness
ofHighway
Pavements
(First Revision)
Specificationfortestsieves: Part 1 clothtestsieves(Third
Revision)
Specification for test sieves: Part 2 Perforated plate test
sieves (Third Revision)
Specification fortestsieves:Part3
Methods
ofexami
nationof apertures oftest sieves (Third Revision)
Method
of Test for Aggregates for Concrete-
Part 1 :Particle Size
and
Shape
(Reaffirmed2002 Amds.
3)Method
of Test forAggregates
for Concrete-
Part 3:Specific gravity, density, voids, absorption
and
bulking(Reaffirmed
2002)
Method
ofTestforAggregatesforConcrete-
Part4:Methods
forSampling
of Aggregates for Concrete (First Revision) (Reaffirmed 2000)Method
oftestfordetermining aggregate impactvalueofsoft coarse aggregates (Reaffirmed
1998 Amds.
1)
Specification for air-cooled blast furnace slag aggregate
foruse inconstruction (Replaced by
EN
12620)2.
SCOPE
This Standard covers the specification for
construction of
Water
Bound
Macadam
asSub-base,
Base Course
andSurfacingCourse
ofaroad pavement.2.1.
Description
2.1.1
Water
Bound
Macadam
(WBM)
shallconsist of clean,
crushed
coarse aggregatesmechanically interlocked
by
rolling,and
voidsthereoffilledwith screening
and
bindingmaterialwith the assistance ofwater, laid
on
a preparedsubgrade, sub-base, base orexisting
pavement
asthe case
may
be.WBM
may
be used as asub-base, base course or surfacing course depending
upon
category ofroad. In each case, it shall beconstructedinaccordance withthe specifications
givenin this
Code
andinconformitywiththelines,grades
and
cross-sectionsshown
on
thedrawingsor as directed.
2.1.2
The
WBM
shallnotbelaidon
anexistingbituminous
top surface without scarifying orprovidingadequate measuresforproper
bond
anddrainage at the interface of existing bituminous
IRC:
19-2005
2.1.3
WBM
should not be laiddirectly over asilty or clayey subgrade. It is advisable to lay a
suitableintervening granularlayer.
3.
MATERIALS
3.1.
Coarse
Aggregates
Requirements
General
3.1.1 Coarse aggregates shall consist of clean
crushedorbrokenstone,crushed slag,overburnt
brick
(Jhama)
metal or naturally occurringaggregatessuchaskankarandlateriteofrequisite
quality as stated hereinafter.
Use
of crushabletype aggregates should generally be restrictedto
lowerlayersofthepavement.
The
aggregatesshallconform
to thephysical requirements setforth inTable 1.
3.1.2.
Crushed
or
broken
stone :Crushed
or broken stone shall be hard, durable
and
freefrom
flat, elongated, softand
disintegratedparticles, dirtorotherdeleterious materials.
3.1.3
Crushed
slag :Crushed
slag shall bemanufactured
from
air-cooled blastfurnace slag.Itshallbeangularinshape,reasonablyuniformin
quality anddensity, andgenerally free
from
soft,elongated
and
flatpieces,dirtorotherdeleteriousmaterial.
Crushed
slag shall notweigh
less than11.2
kN
perm
3and theglassy material init shall
not be in excess of 20 per cent. It should also
comply
withthefollowing requirements.(i) Chemicalstability
(ii) Sulphurcontent
(IS
14685-1999
) (iii)Water
absorption(IS 2386, Part 3)
To
comply
withrequirementof
Appendix
ofBS
:1047
Maximum
2 per centMaximum
10percentTable
1: PhysicalRequirements
ofCoarse
Aggregates
forWBM
SI.
No.
Type
of Construction Test+
TestMethod
equirements
1. Sub-base
Los
Angeles Abrasion Value* or IS2386
(Part 4)Max.
50%
Aggregate Impact Value* IS
2386
(Part 4)or IS
5640**
Max.
40%
2.
Base
course withbituminoussurfacing
Los
Angeles Abrasion Value* or IS2386
(Part4)Max.
40%
Aggregate Impact Value* IS
2386
(Part 4)orlS 5640**
Max.
30%
FlakinessIndex*** IS
2386
(Part 1)Max.
20%
3. Surfacing course
Los
Angeles Abrasion Value* or IS2386
(Part 4)Max.
40%
Aggregate Impact Value* IS
2386
(Part4)or IS
5640**
Max.
30%
FlakinessIndex*** IS
2386
(Part 1)Max.
15%
Notes :
* Aggregates
may
satisfy therequirements ofeithertheLosAngelestestorAggregate Impact Value Test.** Aggregateslikebrickmetal,kankar,laterite, etc.,whichgetsoftenedinpresence ofwatershouldinvariablybe
tested forimpactvalueunderwetconditionsinaccordancewithIS 5640.
***
The
requirement of FlakinessIndexshallbeenforced only inthecaseof crushed/brokenstone andcrushed
slag.
+ Samples for tests shall be representative of the materials to be used and collected in accordance with the
proceduresetforthinIS2430.
IRC:
19-2005
3.1.4
O
verburnt
(Jhama)
brickmetal:B
rickmetal shall be
made
out of overburnt bricks orbrick bats
and be
freefrom
dustand
otherdeleterious materials.
3.1.5
Kankar
:Kankar
shall be tough having abluealmost opalescentfracture. Itshall notcontain
any clay in the cavities
between
nodules.3.1.6 Laterite : Laterite shall be hard, compact,
heavy and of dark colour. Light coloured sandy
laterities, as also those containing ochreous clay
shall notbe used.
3.2
Coarse Aggregates-Size
and Grading
Requirement
3.2.1
The
coarse aggregates shallconform
toone of the grading given in Table 2. Grading 1
shall be used only for sub-base courses, with a
compacted
layerthicknessof 100mm.
3.2.2
The
sizeofaggregates to be usedwould
depend
on
the type of aggregates availableand
compacted
thickness ofthe layer.3.2.3
The
crushable typeaggregates likebrickmetal, kankar
and
laterite shall also generallysatisfy the grading requirements of Table 2.
Relaxation ingrading
may
be permittedforsuchmaterialswiththe permission ofthe Engineer.
3.3
Screenings
3.3.1 Screenings to fill voids in the coarse
aggregatesshallgenerallybe ofthe
same
materialas the
coarse aggregates.
However,
from
economicconsiderations,predominantlynon-plastic
materialsuchaskankar,
moorum
or gravel(otherthan river-bornerounded aggregate)
may
also beused forthispurpose providedthatthe liquidlimit andplasticityindex ofsuchmaterial are
below
20
and 6respectivelyandthefractionpassing75micronsieve does not exceed 10 percent.
3.3.2
As
Tar
as possible, screenings shallconform
to thegrading
shown
inTable
3. Screeningsof typeA
shallbe usedinconjunctionwith coarse aggregates of grading 1,
and
of typeB
with coarse aggregatesofgrading3.With
coarseTable 2 : Size
and Grading Requirement
ofCoarse Aggregate
forWBM
Grading
SizeRange
and compacted
SieveDesignation
Per
centby Weight
No.
thickness for layer (IS 460)Passing
the Sieve1
90
mm
to45
mm
(100mm)
125mm
10090
mm
90-10063
mm
25-6045
mm
0-15 22.4mm
0-5 2 63mm
to45
mm
(75mm)
90
mm
10063
mm
90-100 53mm
25-75 45mm
0-15 22.4mm
0-5 353
mm
to22.4mm
(75mm)
63
mm
100 53mm
90-10045
mm
65-90 22.4mm
0-10 11.2mm
0-5IRC:
19-2005
Table
3 :Grading
Requirements
of Screenings forWBM
Grading
Classification
Size of
Screenings
(IS 460)
Sieve
Designation
Passing
the SievePercent
by Weight
A
13.2mm
13.2mm
100 11.2mm
95-100 5.6mm
1<K
180
micron 0-10B
11.2mm
11.2mm
100 5.6mm
90-100 180
micron 15-35aggregates ofgrading 2, either type
A
or typeB
screenings
may
beused.Forcrushable screeningslike
moo
rum
andgravel,thegradinggiveninTable3 shallnotbebinding.
3.3.3
The
use ofscreeningsmay
be dispensedwith
when
crushable type soft aggregates suchas brick metal, kankar, laterite, etc., are used as
coarse aggregates, as these are likely to get
crushedtoa certainextentduringrolling. 3.4
Binding Material
3.4.1 Binding material tobe usedfor
WBM
asfillershallconsistofafinegrainedmaterialpassing
100
per centthrough
425
micron
sieveand
possessing PIvalueof4-8
when
theWBM
isusedas a surfacing course, and less than 6
when
theWBM
is adopted as a sub-base/base course withbituminous surfacing. Iflimestoneformations are
availablenearby, limestone dust orkankarnodules
may
be usedasbindingmaterial.3.4.2 Application ofbinding material
may
notbe
necessary,where
the screenings consist ofcrushable type material like
moorum
or gravel.However,
forWBM
used as a surfacing course,where
the PIofcrushable type screeningsis lessthan 4,applicationofa small quantityofbinding
materialhavingPIof 4-6
would
berequiredatthetop.
The
quantityofscreeningscouldbe reducedcorrespondingly.
3.5 Quantities of
Material
3.5.1
Approximate
quantitiesof
coarseaggregates
and
screenings required for 100mm
compacted
thickness ofWBM
sub-base course are given in Table 4. Likewise, quantities ofmaterials for
WBM
sub-base/base or surfacingTable
4
:Approximate
Quantities ofCoarse Aggregates
and
Screenings Required
for100
mm
compacted
thickness ofWBM
Sub-base
Course
per
10m
2Coarse Aggregates
Screenings
Classification Size
Loose
Stone
ScreeningsCrushable
Type Such
Range
Quantity
Grading
Loose
asMoorum
orGravel
classification quantity
Properties
Loose
and
sizeand
size quantity(mm)
(m
3 )(m
3 )(m
3 ) 1 2 34
5 6 7 Grading 190
to 1.21 toType
A
0.27toLL<20,
0.30to 45 1.43 13.2mm
0.30PI<6
Per cent passing75 micron<
10 0.326
IRC: 19-2005
Table
5 :Approximate
Quantities ofCoarse
Aggregates
and
Screenings
Required
for75
mm
compacted
thickness ofWBM
Sub-base/Base Course/Surfacing
Course
per 10
m
2Coarse Aggregates Screenings
Classification Size Loose Stone Screenings Crushable
Type Such
Range
Quantity Grading Loosequantityor asMoorum
or Gravel(nun)
(m
3 ) classificationand
sizeWBM
sub-base/base course(m
3 )WBM
surfacing course*(m
3 ) Propertiesand
size(m
3 ) Loose quantity(m
3 ) 1 2 3 4 5 6 7 8 Grading2 63to45 0.91 to 1.07 TypeA, 13.2mm
0.12to 0.15 0.10to 0.12 LL<20, PI<6 Percent passing 75 micron <10 0.22to 0.24 i Grading 2 63to45TypeB,
11.2mm
0.20to022
0.16to 0.18 Grading3 53to22.4 0.18to 021 0.14to 0.17QuantitiesinCol.6are80per centofthoseinCol.5as largerquantityofbindingmaterial willneedtobe usedwhere
the
WBM
isto actasa surfacingcourse(seeClause3.5.2.).grade
and
camber and
cleanedofalldust,dirtand
otherextraneousmatter.
Any
rutsorsoftyieldingplaces that
have
appeared
due
toimproper
drainage, service
under
traffic or other reasonsshall
be
correctedand
rolleduntilfirm.4.1.2
Where
theWBM
is tobe
laidon
anexisting un-surfaced road, the surface shall be
scarified
and
re-shapedtotherequiredgradeand
camber
as necessary.Weak
places shallbe
strengthened,
corrugations
removed
and
depressions
and
potholesmade
good
withsuitablematerial before spreading the coarse aggregates
for
WBM.
4.1.3
As
faras possible,layingofWBM
courseover an existing bituminous surface should
be
avoidedsinceitwillcauseproblems ofproper
bond
and
internal drainage of thepavement
at theinterface of
two
courses. It is desirable tocompletely
remove
theexisting thin surfacing of bituminouslayer,where
WBM
is proposedtobelaidoverit.
Where
theintensityofrainislow
andinterfacedrainagefacilityis efficient,
WBM
can belaidoverexisting thinbituminoussurfacingby
course for a
compacted
thickness of75
mm
aregiveninTable5.
3.5.2
The
quantityofbinding materialwhere
itistobe used (seeClause3.4.), will
depend on
thetypeofscreeningsandfunctionof
WBM.
Generally,the quantity required for
75
mm
compacted
thicknesswillbe0.06-0.09
m
3/10
m
2inthecaseofWBM
sub-base/basecourseand
0.10-0.15m
3/10m
2when
theWBM
is to function as a surfacingcourse.For 100
mm
thickness,thequantityneededwill be0.08-0.10
m
3/10
m
2forsub-basecourse.3.5.3
The
above
mentionedquantitiesshouldbetakenasaguideonly,forestimationofquantities
for construction,etc.
4
CONSTRUCTION
PROCEDURE
4.1
Preparation
ofFoundation
for ReceivingWBM
Layer
4.1.1
The
subgrade,sub-baseorbasetoreceiveIRC:
19-2005
cutting
50
mm
x50
mm
(minimum)
furrowsat 1metre intervals at 45 degrees to the centre line of
thecarriagewaybeforeproceedingwiththelaying
ofWBM.
The
directionand
depth of furrows shall besuchthatthey provideadequate
bondage
andalsoserveto drain waterto the existing granularbase
coursebeneath the existingbituminous surface.
4.1.4 In all cases, the foundation shall be kept
welldrainedduringtheconstructionoperations.
4.2
Provision of Lateral
Confinement
of
Aggregates
Forconstructionof
WBM,
arrangementshouldbe
made
forthelateralconfinementof aggregates. Thisshallbedone by
building adjoining shouldersalongwith
WBM
layers.The
practice ofconstructing
WBM
in a trench section excavatedin the finished formation
must
be completelyavoided.
4.3
Spreading
ofCoarse
Aggregates
4.3.1
The
coarse aggregates shall be spreaduniformly
and
evenlyupon
the prepared base inrequiredquantities
from
stockpiles along the sideof the road or directly
from
vehicles. Inno
caseshallthesebe
dumped
inheapsdirectlyon
theareawhere
these are to be laid norshall their haulingover a partly completed base be permitted.
The
aggregatesshallbespreadtoproperprofile
by
usingtemplatesplacedacross the road about6
m
apart.Where
possible,approved mechanicaldevicesshall be used to spread the aggregates uniformly so astominimizetheneedfortheirmanipulation
by
hand.4.3.2
The
WBM
Course
shallbeconstructedinlayerssuchthatthicknessofeach
compacted
layerisnot
more
than 100mm
forgrading 1 (Table 2).The
compacted
thicknessoflayershall be75mm
for grading 2
and
grading 3.Each
layer shall betested
by
depthblocks.No
segregationoflarge orfine particles shall
be
allowed.The
coarseaggregatesasspreadshallbe ofuniformgradation
with
no
pocketsoffine material.4.3.3
The
coarse aggregates shall normally notbe spread in lengthsexceeding threedays average
work
ahead
of the rollingand bonding
of theprecedingsection.
4.4 Rolling
4.4.1 After the laying of coarse aggregates,
these shall be
compacted
to full widthby
rollingwitheither three
wheel-power
rollerof80
to 100kN
capacity oranequivalent vibratoryroller.4.4.2
The
rolling shall beginfrom
edges withrollerrunningforwardand
backward
untiltheedgeshavebeenfirmlycompacted.
The
roller shallthenprogress gradually
from
edgestothecentre, parallelto the centre line of the road
and
overlappinguniformlyeach precedingrearwheeltrackby
one
halfwidth
and
shall continueuntil the entireareaofthe course has
been
rolledby
the rear wheel.Rolling shall continue until the road metal is
thoroughly
keyed
and
thecreeping of stoneaheadoftherolleris
no
longervisible.Slightsprinklingofwater
may
be done, ifrequired.4.4.3
On
super elevated portions of the road, rolling shallcommence
from
the loweredge andprogress gradually towards the upperedge ofthe
pavement.
4.4.4
Rolling
shall notbe
done
when
thesubgrade is soft or yielding or
when
it causes awave-like
motion
in thebase course or subgrade.If irregularities
develop
during rolling,which
exceed 12mm
when
tested with a 3m
straightedge,thesurface shallbe loosened
and
aggregatesadded
orremoved
as required before rollingagain
so as toachieve
alluniform
surfaceconforming
tothedesired cross sectionandgrade.The
surface shallalso bechecked
transversely bytemplateforcamber,and anyirregularitiescorrected
in the
manner
described above. Inno
case shallthe use of screenings to
make
up
depressions bepermitted.
4.4.5 Material,
which
getscrushedexcessivelyduring
compaction
orbecome
segregatedshallberemoved
and
replaced with suitable aggregates.IRC:
19-2005
4.5 Application of
Screenings
4.5.1 After coarse aggregates have been rolled
as per Clause 4.4, screenings to fill interstices
shall be applied gradually over the surface.
Dry
rollingshallbe
done
when
thescreeningsarebeingspread so that the jarring effect of roller causes
them
tosettleintothevoidsofthecoarseaggregate.The
screenings shall not bedumped
in piles butapplied uniformly in successive thin layers either
by
thespreading
motion
of
hand
shovels, mechanical spreaders, or directlyfrom
trucks.Trucks
plying over the base course to spreadscreeningsshall beequippedwithpneumatictyres
and
operated such as not to disturb the coarseaggregates.
4.5.2
The
screenings shall be appliedat a slow rate in three ormore
applications as necessary. Thisshallbeaccompanied byrollingand brooming.Either mechanical
brooms/hand
brooms
or bothmay
be used. Inno
case shall the screenings beapplied sofast
and
thick as toform
cakesorridgeson
thesurfacemaking
thefillingofvoidsdifficultor preventing the direct bearing of roller
on
thecoarse aggregates.
The
spreading, rollingand
brooming
of screenings shallbe
takenup
on
sections,
which
can becompletedwithinone
day'soperation.
Damp
andwet
screenings shall notbeused in any circumstances.
4.6 Sprinkling of
Water and
Grouting
4.6.1 After application
of
screenings, thesurface shall be copiously sprinkled with water,
swept and rolled.
Hand
brooms
shall be used tosweep
the wet screenings into the voids,and
to distributethem
evenly.The
sprinkling,sweeping
and
rolling operations shall be continuedand
additionalscreeningsapplied,
where
necessaryuntilthe coarse aggregates are
bonded and
firmly setand a grout of screenings
and
water forms aheadofthewheels oftheroller. Care shallbetakenthat the baseorsubgrade doesnotget
damaged
due
toadditionof excessivequantitiesofwaterduringthe
construction.
4.6.2 In case of lime treated soil sub-base, construction of
WBM
on
top of itcan
causeexcessive water to flow
down
to the lime treatedsub-basebefore it has picked
up
enough
strength(isstill"green")
and
thuscausedamage
tothe sub-baselayer.The
layingofWBM
layer insuchcasesshall be
done
after the sub-base attains adequatestrength, as directed
by
the Engineer.4.7 Application of
Binding
Material4.7.1 After theapplication ofscreenings asper
Clauses 4.5
and
4.6, binding materialwhere
it isrequiredtobe used(seeClause3.4), shallbeapplied
at an
uniform and slow
rate intwo
ormore
successive thin layers. After each application of
binding material, the surface shall be copiously
sprinkledwithwater
and
the resulting slurrysweptin with
hand
brooms/mechanicalbrooms
or bothsoastofillthevoidsproperly.Thisshallbefollowed
byrollingwith 80-100
kN
rollerduringwhich
watershall be applied to the wheels to
wash
down
thebinding material that
may
getstuckto them.The
spreadingof bindingmaterial,sprinklingofwater,
sweeping
withbrooms and
rolling shall continueuntilthe slurryofbindingmaterial
and
waterformsa
wave
ahead ofthe wheels ofmoving
roller.4.8 Setting
and Drying
4.8.1 After final
compaction
ofthe course, thelayer shall be
allowed
to dry overnight.Next
morning,hungryspotsshallbefilledwith screenings
orbindingmaterial, lightlysprinkledwithwaterif
necessary,
and
rolled.No
traffic shallbe
allowedtillthe
macadam
sets.4.8.2 In the case of
WBM
base course to beprovidedwithbituminoussurfacing, thelatter shall be laid only after the
WBM
course is completelydryandbefore allowinganytraffic
on
it.5.
SURFACE
EVENNESS
OF
WBM
COURSE
5.1
The
surfaceunevenness
ofcompleted
WBM
courseinlongitudinalandtransversedirectionsshallbewithinthe limits specifiedinTable6.
5.2
The
longitudinal profileshall be checkedIRC: 19-2005
Table
6 : PermissibleSurface
Unevenness
forWBM
Courses
SI Size
Range
ofx^UdlbC /AgglCgalCS
Longitudinal Profilemeasured
witha 3-Metre Straight
Edge
Transverse Profile
Max.
permissible Surface unevennessMaximum
number
of undulations permittedinany 300-metrelength, exceedingMax
nprmissihlp variationfrom specifiedprofile undercamber
templatemm
12mm
10mm
mm
1. 90-45mm
15 30 12 2. 63-45mm
or 53-22.4mm
12 30 8eachtrafficlanealongaline parallel tothecentre
line of the road.
The
transverse profile shall be checked with a series of threecamber
templatesat intervalsof 10m. Fordetailed guidancein this
respect, reference
may
bemade
toIRC:SP:16-2004
"Guidelines
forSurface
Evenness
ofHighway
Pavements
(First Revision)".6.
RECTIFICATION
OF
DEFECTIVE
CONSTRUCTION
Where
the surface irregularity of theWBM
courses exceeds the tolerances given in Table 6
or
where
thecourseis otherwise defective duetosub-gradesoilmixingwiththeaggregates, the layer
to its full thickness shall be scarified over the
affected area, reshaped with added material, or
removed
and
replaced with fresh material asapplicable, and recompacted in accordance with
Clause4.
The
areatreatedintheaforesaidmanner
shall not be less than 10 nr. In
no
case shalldepressionsbefilledupwith screeningsorbinding
material.
7.
CONSTRUCTION OF
WBM
OVER
NARROW
WIDTHS
Where
theWBM
course isto beconstructedin
narrow
widths forwidening
of an existingpavement,
the existing shoulders should be excavatedtotheirfull depth and width up to thesubgrade
levelexcept
where
thewidening
specificationsenvisagelayingofastabilised-soilsub-base usingin-situoperationsinwhichcase the
same
should be
removed
only upto the sub-base level.The
construction ofWBM
shall be carried out asperthe procedure prescribed inClause4.
8.
MAINTENANCE OF
WBM
WEARING
COURSES
8.1
The
successful performance ofWBM
asa surfacing course depends to a large extent on
timely maintenance. Maintenance measures for
thiscan beconsideredunderthreeheads: periodic
patching of potholes along with removal ofruts
and
depressions, blinding of the surface,and
surface renewals.
8.1.1
Patching
of pot-holes
along
with
removal
of rutsand
depressions : Potholes,ruts and other depressions should be drained of
waterandcuttoregularshapewithvertical sides.
All the loose and disintegrated material shall be
removed
and the exposed surfaces swept clean.The
holes/depressions shall then be filled withsalvaged coarse aggregates
mixed
withsufficientquantity offresh aggregates and recompacted as
normal
WBM
tooperations describedinClause4
sothatthepatched area
merges
withtheadjoiningsurface.
Where
the area so treated is small,hand
rammers
may
be used forcompactioninstead ofrollers.
8.1.2 Blinding of surface : Blinding of the
surface shall be resorted to periodically as soon
as the blinding material applied earlierhas been
eroded
away
due
to a traffic or weather actionIRC: 19-2005
and
the surface has startedshowing
signs ofravelling. Blinding operations shall consist of
applicationof binding materialinthinlayers
and
groutinginaccordance with theprocedure given
inClause4.7.
8.1.3
Surface
Renewal
:WBM
wearing
courseshallbe
renewed
when
thesurfaceisworn
out, is corrugated
and
badly ravelled or has aprofusionofpotholes
and
depressionswhich
cannot
be
treatedeconomically
with patching orblindingoperations.
For
renewal,
the existing surface shallbe
scarified to a depth of50-75
mm
and
theresultingmaterial
removed
toberms
forscreeningto salvage the usable coarse aggregates.
The
exposed
pavement
shallbescarifiedagainathighspots so as to ensure proper grade
and
camber.The
salvaged
coarse aggregatesmixed
withsufficient quantity of fresh aggregates (usually
between one
halftoone
third ofthequantity ofsalvaged
aggregates) shallthen
be used
toconstructa
new
WBM
courseinaccordance withThe
officialamendments
tothiscode
would
be publishedby
theIRC
initsperiodical,'IndianHighways',
which
shallbe consideredaseffective