It’s All About the Data

-Eventually

Presented by

Bev Lindquist Bev Lindquist

Vice President – Information Services September 20, 2011

About WPPI

50 municipal Members and 1 co-op

– Wisconsin – 41 – Upper Michigan – 7 – Iowa - 3

Member profile

– Size varies from 1,000 – 14,000 retail customers – Electric, water, sewer, stormwater, gas, cable ….

System sales for 2010

– Peak demand – 1,007 MW

– Energy requirements – 5,336 GWh – Operating revenue - $420.8M

(2)

WPPI 2010 Energy Sources

By Ownership

By Ownership

– 14.1% WPPI-owned generation – 85.9% Purchased Power

By Fuel Type

– 62.3% Coal – 0.1% Oil – 7.4% Gas – 17.0% Nuclear – 13.2% Renewable

About WPPI

Governance

– 51 Member Board of Directors – 11 Member Executive Committee – Variety of member advisory groups

Staff

– Corporate - 21Corporate 21

– Power Supply and Operations - 20 – Member and Customer Services – 42 – Accounting and Finance - 14

(3)

Data Points

Federal debt

$15,476,000,000

$

,

,

,

US 2010 population

311,800,000

Smart meters shipped Q1 2011 17,400,000*

WPPI member retail customers 200,000

– Annual data points – 60 min 1,752,000,000 – Annual data points – 15 minAnnual data points 15 min 7,008,000,0007,008,000,000

*Pike Research

WPPI’s Road to the Smart Grid

Where we are

How we got here

What we’re working on

What’s ahead

(4)

Strategies

Smart Metering/Smart Grid

Vision

Customer Information (CIS)

Objective

DATA

Objective

Where we are

Smart Meter partners

– Sensus – 2 members – Elster

Meter Data Management

– Siemens/eMeter

CIS business partners

– NorthStar

(5)

How we got here

Internal group created in 2008

– Identify WPPI needs

– Are there joint action benefits

Smart Metering / Smart Grid Task Force

established in 2009

– Define a SM/SG vision

– Develop plan for moving forwardDevelop plan for moving forward

Task Force activities

– Research, member survey, education – Engage a consultant

(6)

Task Force Activities

Engaged consultant to:

– Complete technology assessment – Create plan to implement technologies – Interact with vendors

– Manage RFP process

– Facilitate education for staff and membersFacilitate education for staff and members – Present final report and recommendations

Key Findings

Joint purchasing benefits by selecting partners

MDM is a key component

Costs are significant

Significant savings with limited number of CIS

t

(7)

Task Force Recommendations

Members should not make further AMR

investments

Establish standard meter strategy

Reduce number of CIS systems

Implement a centralized MDM

Develop financial incentive programs

Develop financial incentive programs

Share best practices among members

Offer educational opportunities for members

Delivering to Members

Meter Data Collection and Management Service

– WPPI hosted services

~AMI collection for member use ~MDM software for member use ~Technical support for both

– Member costs

~Start up fee to participate (covers capital cost)

~Ongoing fee per meter basis (covers recurring support) ~Ongoing fee per meter basis (covers recurring support)

(8)

CIS Strategy

Reduce number of CIS systems

y

– Positions members for transition to SM/SG world – Less costly, more reliable integration

– Members benefit from joint purchasing licenses, support

and services

– Implement complex time-based rates

– Provide retail customers with enhanced online services – Capture and measure power supply benefits

Build on 10 years of CIS activities

CIS Activities

Member survey

– Satisfaction and need

Engage consultant

– Complete functional and needs assessment – Manage RFP process

– Interact with vendors

– Facilitate member evaluation processFacilitate member evaluation process

Develop financial incentives

(9)

CIS Committee Tasks

Provide business and functional requirements

Input on evaluation criteria and ranking

Attend structured demos

Conduct reference checks

Recommend 2 3 vendors

Recommend 2-3 vendors

Completed in fall of 2010

Delivering to Members

CIS Upgrades

– 28 NorthStar members – 8 Caselle members

CIS Incentives

– One-time incentive of $25K

– One-time incentive to change partners – Zero percent interest loanZero percent interest loan

~Additional CIS costs

(10)

Member Responsibilites

Coordinate version upgrades

Maintain support agreements

Follow standardizations, where possible

Agree to WPPI access to CIS data

Participate in user groups

Participate in user groups

What we’re working on

Smart Meter preferred partners

p

p

– Elster contract in progress

– Data collection for Sensus installed at WPPI – AMI trouble shooting

Meter data management software

– MDM configuration

Functional in mid 2012

(11)

CIS business partners

– New or amended service and licensing agreementsNew or amended service and licensing agreements – Marketing

– Upgrading – Standardization

~CIS Billing components ~MDM interface points

– New implementations

What’s ahead

Complete upgrades

Install MDM

Develop MDM <– > CIS interfaces

Test interfaces with 2 pilot members

Develop replication process

Enhance customer information programs

(12)

Customer information programs

– Online presentment of customer interval data – Associate customer interval data with costs – Bill print enhancement

~Outsourcing - joint purchase

~Graphs, peer comparisons, targeted messaging

– Large retail customer information package

Billi

– eBilling

Putting it all Together

Data sources

– Meter head ends

– Meter Data Management Software

~15 and 60 minute interval data ~MV-90 – CIS Partners ~Billing Customer ~Customer – Enterprise data ~Cognos BI

(13)

Lessons Learned

Don’t underestimate the time commitment

Don’t underestimate the cost

Don’t underestimate the complexity

Select business partners wisely

Don’t rush

Where we Don’t

want to Be

References

Related documents

[r]

 Comprehensive final report with invoices, receipts and payroll records or summary of expenses and proof that the work has been completed Audited schedule of project

The following scholarships are available to junior and senior nursing students with a grade point average of at least 2.5 (A=4.0) and are awarded based on financial need through

We present the first search for HNLs in a liquid-argon TPC using data recorded with the MicroBooNE detector in 2017 –2018 with a novel trigger recording events that arrive at

One is the medico-legal context (medical documentation is used in social security contexts, courts, or by local administration) requiring doctors to keep record of the

Depending on the fees set by the Schedule, the Subscriber will be charged for this service on a monthly basis, either by calculating a per User fee, a fixed monthly fee, or based

These include: passing component reliability data; supplying engineering data and information; supplying lists of part and dash numbers; issuing various technical manuals;

Or if at any later date the items or services contained herein shall not meet all applicable state and federal requirements after the bidder is awarded the contract hereunder