March 2013

Brought to you by

Data Center Knowledge Guide to

Optimization in the Virtual Data Center

Realizing the full potential of a mission critical investment

(2)

Executive Summary

The modern data center faces challenges from dynamic technology lifecycles and a demanding business envi-ronment. Evolving from server closets to multi-million dollar facilities, the modern data center incorporates a number of innovations that contribute to its effective and efficient operation. Facility and IT infrastructure must be agile and keep pace with the business, while maintaining mission-critical distinction.

To foster an agile, proactive approach towards facility and IT operations, data center owners and operators must adopt suitable engineering tools and techniques. Moni-toring, management and simulation techniques help to:

fUnderstand the cadence of business.

f Function as a link to illustrate the efficiency of the data center investment.

f Identify, assess and determine the risk of vulnerabilities.

f Develop business and technical planning scenarios to deal with risk and uncertainty.

fIdentify and mitigate lost capacity.

Using the right tools and techniques for the right job equates to monitoring, simulation and DCIM (Data Cen-ter Infrastructure Management) working in harmony to protect and sustain the data center investment. Using simulation techniques in a data center prior to or in pro-duction can identify conditions that lead to unnecessary costs, lost capacity, and service interruptions.

This paper will explore the value that monitoring, simula-tion and DCIM offer, and the addisimula-tional value of integrat-ing these engineerintegrat-ing tools and techniques. It explores the importance of promoting an environment where IT and Facilities departments present a unified approach towards the data center. The engineering tools available to data center managers also present the risk of inaccu-rate interpretations and unreliable forecasting. Finally, this paper explores the misnomer of perceived capacity, the complexities of capacity management, and having an integrated simulation platform act as a catalyst for re-gaining lost capacity in the data center.

Contents

Engineering Tools . . . 3 Simulation . . . 3 DCIM . . . 4 Integration . . . 4 Risk Management . . . 5

The Dangers of Extrapolation . . . . 5

Predictive Analytics . . . 5

The Virtual Facility. . . 6

Capacity Management . . . 6

Investment Efficiency . . . 7

(3)

Engineering Tools

A data center monitoring system is a fundamental in-strument used for IT and Facilities alike, to help avoid and recover form operational outages. It is put in place to provide real-time data on the operational condi-tions that impact the ability to do business. A growing number of elements are being examined in the data center — from the chip level of individual compo-nents, through data center infrastructure compocompo-nents, all the way to factors external to the data center that have the potential to impact facilities. Real-time data is gathered from sensors looking at facility conditions such as temperature, humidity, water, power, intrusion detection, and IT monitoring looking at equipment availability, network parameters, and a variety of ser-vices. Engineering tools for monitoring range from monitoring via SNMP (Simple Network Management Protocol) for small components or software services, to complete building management systems.

The diversity and range of things that are now tored has fueled innovation for how they are moni-tored. Monitoring methods range from wireless solu-tions, to new software standards, and have added asset management with RFID tags. Monitoring is an impor-tant tool for aggregating and reviewing real-time data about the enterprise, and responding accordingly.

Simulation

Another engineering tool in the data center is simula-tion. Simulation is powerful technique that combines aspects of data center design, management, strategy and optimization. It enables a great deal of insight into design efficiencies, operational simulations such as airflow, power and other efficiency calculations, and overall ‘what-if’ scenario planning. It is a vital practice for the data center, where multiple complex processes and interdependent systems are at work.

Derived insights from simulations shed light on design flaws, and let the operator visualize the facility in three dimensions. Modern simulation tech-niques can also aggregate the wealth of data being captured throughout the data center, presenting a real-time view into operational parameters, conditions

and alerts. It can digest a variety of inputs from moni-toring, DCIM, CAD drawings and other resources, and then provide rich output in the form of visualizations and predictive analytics. A fully engaged simulation analysis will empower a real-time, 3-dimensional ca-pacity model of the data center.

A key element of data center simulation that is most often thought of is CFD (Computational Fluid Dynam-ics). It has been used for many years and in many in-dustries to simulate things like racecars, aircrafts and most manufactured goods. CFD provides a scientific and comprehensive design approach to data center cooling management and helps visualize current con-ditions and analyze proposed modifications. Cooling is a primary aspect of both designing and operating a data center, and CFD serves design and operations in exploring cooling path management, identifying and assessing the impact of various risks, and (virtually) demonstrating the effect a change will have without making it in production.

CFD visualizations can analyze model variants and the impact of configuration changes in the data center. This allows for validation in the virtual facility before imple-mentation in the real facility. In existing facilities, as long as the model is built accurately and calibrated, opera-tors can review current conditions, troubleshoot prob-lem areas, or evaluate the potential impact of design upgrades.

A key element of data center simulation

that is most often thought of is CFD

(Computational Fluid Dynamics).

CFD provides a scientific and

compre-hensive design approach to data center

cooling management and helps visualize

current conditions and analyze proposed

modifications.

(4)

DCIM

DCIM (Data Center Infrastructure Management) is the integration of IT and facility disciplines to centralize monitoring, management, and intelligent capacity planning of critical systems in a data center. It is viewed as a convergence across logical and physical layers with-in the data center. DCIM solutions are implemented to address the growing complexity in IT systems, improve management and capacity planning, improve visibility, improve availability, and balance supply with demand. Having grown exponentially in the past several years DCIM is sure to expand in adoption, as infrastructure visibility, energy consumption tracking and many other aspects demonstrate the strategic value of it.

Integration

The large investment made in a mission critical facil-ity warrants a commensurate investment in the tools selected to develop and operate it. These tools are the means that will shape the success of implement-ed data center designs, and serve as the operational backbone. Monitoring provides the essential visibility into operations that is needed, DCIM provides an even further holistic view, and simulation has the ability to bring it all together, complementing and integrating them into an essential approach to managing the vir-tual facility.

The concept of a virtual facility, as pioneered by Future Facilities, is a full 3-dimensional mathematical repre-sentation of physical and logical attributes of a data center. This comprehensive visualization captures all simulation data from past, present and future states. The virtual facility captures all facility and IT attributes and monitoring points, and then produces predictive analytics, allowing the operator to visualize and solve capacity problems before committing to change. Every characteristic of a data center plays a part in the greater data center production, and as such a com-plete simulation includes building, room, rack and equipment level views for architectural geometry, cooling and ventilation, power and IT configurations. Future Facilities’ 6Sigma suite of design and manage-ment software incorporates data input from 2D and 3D CAD drawings, as well as integrating with asset man-agement tools, monitoring and DCIM software. Mod-els are built with the purpose of evaluating the risks and benefits of a data center design, in a virtual envi-ronment. With 6Sigma software the data center can not only be easily built, but also continuously modi-fied as changes are made, and operated with live data fed into the model. In addition to CFD simulations the virtual facility portrays the comprehensive data center environment — including assets, network distribution, cable management and power feeds, among others.

DCIM INTEGRATION

DCIM

IT

Disciplines

Facility

Disciplines

Centralizes monitoring, management, and intelligent capacity planning of critical systems in the data center.

(5)

Risk Management

A data center owner and operator face a tremendous amount of risk, in all tangible and intangible aspects of managing an effective facility. Redundant, highly avail-able infrastructure is engineered, and processes are carefully mapped and executed to ensure maximum availability.

Relying on assumptions and spreadsheets to miti-gate risk and manage capacity throughout the life of the data center, while certainly an economical route, will surely lead to inescapable failure. A principle of risk management is to be dynamic, iterative and re-sponsive to change. To accomplish this in the com-plex ecosystem of a data center is challenging, but is achievable when armed with tools to respond and techniques that enable predictions. Integrating moni-toring and DCIM solutions with simulation allows for properly identifying and characterizing risks, assessing vulnerabilities, and empowers both IT and facilities to respond dynamically.

Data center monitoring and DCIM solutions generate valuable data about assets for IT and data center in-frastructure. Utilized properly, monitoring presents the opportunity to identify issues as they occur in produc-tion and react accordingly. Independently it is an im-portant tool for managing operations and awareness, however when integrated with DCIM and simulation it packs a powerful, visual punch.

The Dangers of Extrapolation

The speculative nature of data center operators, cou-pled with aggregated, real-time data about a facility leads to false perceptions about future trends. Engi-neering schools now have courses in simulation, that instruct on both proper use and how to interpret re-sults. They are also taught that extrapolation is unreli-able, in that trends cannot be predicted. When a

per-and more on the line, the educated guess should not be accepted as a foundation for operating the mission critical facility.

With the increase in DCIM tools as well as the volume of things to monitor, interpolation of data can also be commonplace. Interpolation is the estimation of an unknown quantity between two known quantities (historical data), or drawing conclusions about missing information from the available information. In either case, the notion of the data speaking for itself involves dangerous assumptions and conclusions that lead to costly and irresponsible decisions.

Finance is another area where this kind of prognosti-cation takes place. Trends are identified, guesses are made, and money is on the line. Since the initial out-lay and ongoing costs of a data center are substantial and heavily scrutinized for being run effectively, data centers are often led by Chief Financial Officers or oth-ers in the finance department. In the finance industry, an actuarial scientist uses mathematical and statistical methods to assess risk. Like the actuarial scientist, the data center operator can use simulation, backed by ac-tual data and analytics to develop effective forecasts that predict short and long-term trends.

There is a lot of room for science in analyzing the com-plexity and amount of data center data. However most people seem blissfully unaware of what applying this level of analytics can do for efficiency gains, energy savings and return on investment. Using simulation influences decision management, by discovering, building predictive analytic models, and implement-ing a continuous improvement cycle.

Predictive Analytics

The massive amounts of data collected through moni-toring and other systems, or in popular recent terms — big data, should not just be collected and viewed, but be processed with powerful analytic tools to assist in a mathematically-based approach to predict trends. Pre-dictive analytics gives an operator actionable insight that contributes towards a true understanding of short and long term trends.

The power of predictive analytics lies in complete

in-Data center monitoring and DCIM solutions

generate valuable data about assets for IT and

data center infrastructure.

(6)

The Virtual Facility

Addressing data center challenges is specifically what the 6Sigma suite of software from Future Facilities is designed to do. Its Virtual Facility is a predictive meth-odology and visual communication tool for use by Fa-cilities and IT management. Building a simulated data center in 6Sigma is relevant at any time — from design, construction, and commissioning across to on-going operation of the facility. The 6Sigma suite helps bridge communication gaps among all data center stakehold-ers, with a unified vision of the data center where simu-lation earnestly reflects the production environment. It works with a large vendor community, including IT and infrastructure equipment manufacturers, various consultancies providing architectural, mechanical and electrical services.

The Virtual Facility is a platform to build simulations of a data center that serve IT and Facility managers to ad-minister and optimize data center resources. Utilizing the full potential of a data center is a difficult target to reach, especially when IT assets are in a constant state of flux. Both engineering experimentation and facil-ity management benefit from modeling changes in the simulated facility, with the ability to test the cause and effect of any change prior to final implementation. Data center optimization can take place without put-ting the data center at risk by using the virtual model.

Capacity Management

When a data center project is initiated and designs finalized, the expectation and business case for invest-ment is almost always a perceived utilization rate of 100 percent. All of the IT and supporting infrastructure are assumed to be perfect, and will operate exactly according to plan. Once built and in production how-ever, reality sets in and the only the thing that stays the same is a constantly changing environment. Only when this margin on capacity is closing is it realized that the faulty, human-derived forecasts have con-cealed the lost compute capacity. Even with a gener-ally accepted percentage of lost capacity, it ultimately equates to lost money, and an irreversible impact to return on investment.

Lost capacity is the fragmentation that happens

be-term assumptions have a significant impact on capac-ity fragmentation and the abilcapac-ity to properly man-age the supporting facility power, cooling and space. Similarly, the data center power, cooling and space are based in certain assumptions about IT requirements, which scale with the business, and change dramatical-ly over time. Within IT spending in technology domains for a business, data centers account for a substantial portion — which means capacity losses equate to sig-nificant figures for additional cost and loss of revenue.

Simulation techniques are used to validate designs of new data centers before being constructed. The same methods can be utilized years down the road to re-val-idate, based on current operating conditions. Facility design permutations implemented and dynamic load distributions can cause major problems over time and make capacity management extremely difficult. This ultimately leads to lost efficiency, lost capacity and in-creased costs. Operational validation then combines monitoring data and simulation to look at the continu-ously changing data center, for maximizing IT service availability and long-term capacity.

The 6Sigma suite from Future Facilities presents the comprehensive virtual facility, as a dynamic and pre-dictive simulation of the physical and logical data cen-ter. Real-time monitoring and asset data is entered, and availability for IT services and compute capacity is produced. Additionally the CFD component

visual-Gartner has found that “70% of data center facilities have failed to meet their capacity requirements without some level of renovation, expansion or relocation.”

In an Uptime Institute survey of 21,000 data center operators, 54% of respon-dents ranked “data center capacity” as the driver for their long term approach to data center energy efficiency out-weighing by far all other drivers.

(7)

Investment Efficiency

Data centers cost between $10 and $30 million per megawatt and are engineered for maximum availabil-ity. With this level of investment it is imperative for IT and Facility departments to work together and thor-oughly explore as many avenues as possible to deliver maximum ROI to stakeholders. For the nominal cost of engineering tools there are a number of examples that demonstrate how they deliver investment efficiency.

Initial calculations and business plans outlining the return on investment for the data center acted as the proof that it was a sound business decision. Engineer-ing tools, integrated to properly depict a virtual facility act as proof that the investment is being protected and

Summary

Demonstrate the business value of monitoring, man-agement and simulation effectually by putting big data to work in building a virtual facility, and then us-ing its predictive analytics to avoid lost capacity and achieve maximum efficiency. Applying operational ef-ficiencies across business functions, with the benefit of predictive analytics, evolves the enterprise.

Ultimately, business is an exercise in risk manage-ment. To accurately address the shared IT and Facility risks, the right tools must be implemented. Employing simulation for a data center builds on the base level of big data provided by monitoring, by incorporating additional analytical automation. Every decision an organization makes will impact the risk it is willing to withstand.

Streamlining data center operations while maintaining uptime and a flow of business is a dubious task. Keep-ing IT infrastructure agile and respondKeep-ing to a highly dynamic business environment involves operating at a rapid rate of change and keeping a close check on expenditures. The high cost of data center design, con-struction and operations means business maintains a close watch the investment, while a proactive business partnership approach between IT and Facility groups will manage a return on expectation.

An investment in simulation, fed by monitor-ing and DCIM data is most likely self-funded — being offset by the savings that it has helped enable. it has helped enable.

1

Identifying energy efficiencies within simu-lated facility models can make considerable financial gains.

2

Leverage integrated engineering tools like monitoring, DCIM and simulation tech-niques to prevent costly down time. The cost of inaction and relying on faulty intuitions about mission-critical IT and infrastructure will more than likely be more costly than the minor investment in the engineering tools and profiting from predictive analytics.

3

Identify cost optimization opportunities in a virtual facility, by weighing short and long-term consequences of facility upgrades, en-ergy savings programs and IT deployments. These cost drivers help avoid lost capacity and larger costs such as new construction or expansion projects.

References

Related documents

spectra of the gratings as a function of angle of incidence will show a single resonance line that Figure 1.6: The SPP dispersion relation for coupling by a grating.. The

I We also consider a noisy variant with results concerning the asymptotic behaviour of the MLE. Ajay Jasra Estimation of

the true impact of real estate to business by examining the benefits of optimal alignment among various components including: between, planet, position, purpose, place,

These cavities spent the least amount of time above 35˚C and 40˚C (Fig 9A-F) and thus a model cannot be run because there are so few non- diapausing individuals spending

monthly price series for certain items spanning the requisite time periods. The Hotel sector is notably absent from these item-level regressions.. different demand elasticities

Despite these moves, the approach taken by the three main migration systems (cases No.2, 3 and 4 in Table 1) remains appreciably different. That is what we shall see now in the

Cyber  Analysis:   The  art  of  human-­led  analysis  of  security   and  non-­security  related  data  from  logical  and  physical   domains  in  order  to

Radič ethernetu má totiž vyvedené všetky potrebné vstupy a výstupy na externé piny a preto je možné pripojiť akúkoľvek EPHY, ktorá podporuje rozhranie MII.. Signály