INTRODUCTION

Meggering of Signalling cable is done to test the continuity and insulation of the cable conductors. The Meggering should be carried out at initial stages, before and after cable laying. For maintenance purposes these tests shall be performed periodically. Low insulation of cable leads to inadvertent energisation or de-energisation of circuits. Check for insulation values periodically enables to ensure integrity of circuits.

If a sudden fall in the value of insulation is observed during the test, the cause should be investigated and immediate action should be taken to repair or replace the defective cable.

PREPARATORY STEPS

1. Before commencement of cable Meggering necessary disconnection from traffic shall be obtained.

2. All working circuits and power supply shall be disconnected from the cable at both ends.

3. Communication between the ends of cable under test shall be established by magneto telephones with other cable which is not under test if possible, otherwise by VHF sets.

4. Competent staff, required instruments and material shall be available at both the ends.

5. Meggering shall be carried out when conductors and insulated parts like terminal blocks are clean and dry.

6. Cable conductors shall be shorted/earthed momentarily to discharge the accumulated charge, if any, before the commencement and after the end of Meggering.

PROCEDURE OF CABLE MEGGERING

Following tests are performed for Meggering of Signalling cable: (A) CONTINUITY TEST

(2)

Tools & Equipments required 1. Multimeter 2. Wire nipper 3. Screw driver set 4. Box spanner E 1 2 3 4 5 6 LOCATION A 1 2 3 4 5 6 LOCATION B Multimeter Armour Earth

This test is carried out to confirm that the core under test is either showing break between both ends or continuous. Testing can be commenced as per the following procedure:

• Set the knob of multimeter to check resistance at 200 ohm range. (At Location A)

• Connect one probe of multimeter to earth and other probe to the end of the cable conductor to be tested, as shown in above figure.

• Instruct staff at the other end (at Location B) to connect earth to same conductor of the cable.

• If earth is light at both ends, connect earth to armour also at both the ends.

• Deflection of multimeter needle shows that the conductor under test is OK; otherwise there is a break in the conductor.

• Then test continuity of all other conductors with respect to this tested conductor. For example to test conductor 2,

(3)

connect the one probe of the multimeter to conductor 2 and other probe to the tested conductor (at Location A). Instruct the staff at other end (at Location B) to short conductor 2 with the tested conductor.

• Test continuity of all other conductors as above. (B) INSULATION TEST

Tools and Instruments required

1. Insulation Tester (Megger) 500V DC 2. 2. Wire nipper

3. Screw Driver set. 4. Box spanner

5. Crocodile clips (equal to maximum No. of cores of cable to be tested) looped together in series

This test is carried out to measure the insulation resistance of the cable under test. Insulation resistance measured between (1) conductor to conductor, called cross insulation, and (2) conductor to earth. Procedure is as follows:

(1) Conductors to conductor (Cross Insulation)

1 Cable 2 Conductors 3 4 5 Location 6

(i) A 500 V Insulation Tester ( Megger ) shall be used for this test and kept at one end of the cable under test. (ii) The first conductor for which cross insulation is being

measured shall be connected to Line terminal of the megger. The remaining conductors looped together (with the help of crocodile clips) i. e. Conductor 2 and

Meggar Line 500 V

(4)

onwards, are connected to Earth terminal of megger as shown in figure. Conductors at the other end are left free. (iii) Now rotate the handle of megger or press push button of

megger. The reading of meter will show the cross insulation between conductor 1 and rest of the conductors. Insulation reading shall be recorded after applying the test voltage for about a minute till a steady reading is obtained.

(iv) Now connect next conductor to Line terminal of the megger & connect the remaining conductors to earth terminal of the megger and take measurements as per procedure II & III. (v) Record the measurements in the prescribed format as shown

in Annexure A.

II) Conductor to Earth Insulation

Earth

(i) By this we can measure individual insulation of conductors w.r.t. earth.

(ii) Connect conductor under test to the Line terminal of the megger.

(iii)

Connect earth terminal of the megger to the earth. Rotate the handle of megger or press push button of megger. The reading of meter will show the insulation resistance of the conductors. Insulation reading shall be recorded after applying the test voltage for about a minute till a steady reading is obtained.

(iv) Replace the conductor at Line terminal of the megger by another conductor under test and repeat as process IV.

CONDUCTOR

500 V Line

Meggar

Earth

(5)

(v) Record the measurements in the format:

ANNEXURE ‘A’

ANNEXURE ‘A’

Proforma for cable testing.

Proforma for cable testing.

____________ Railway

____________ Railway

Station ___________________

Station ___________________

CABLE INSULATION RESISTANCE TEST SHEET Main/Tail* Cable 1. Location: From . . . To . . . . .. . . 2. Cores: . . . 3. Size:. . . 4. Grade 250/440/650/1100V 5. Length: ……….. 6. Type:Unscreened/Screened……… 7. Insulation: PVC/Paper *…………. 8. Date of installation/Commissioning . . . . 9. Name of the manufacturer: . . . .

Core No. Date of Test ……… Temperature……. or Designation and whether Remarks………… ………. wet, damp or dry. Signature……….. *Strike out whichever is not applicable.

CABLE MEGGERING CHART

1 2 3 4 5 6 7 8 9 Earth Re-marks 1 X 2 X X 3 X X X 4 X X X X 5 X X X X X 6 X X X X X X 7 X X X X X X X 8 X X X X X X X X 9 X X X X X X X X X

(6)

Signature

NOTE : These measurements shall be recorded in two copies. One copy each shall be kept in SE(Sig.) office and Sr.DSTE’s office.

Insulation Resistance for a new should not be less than 200 Mega ohm per kilometer at 200 C For converting measured value

of Insulation resistance at any temperature to that of 20o C, a table

of multiplier constants is to be referred

PERIODICITY OF TESTING: The periodicity of testing of cable insulation may be different in different railways. But testing programme shall be followed as per policy guidelines issued by Railway Board as under: (ref.-8th MSG meeting Sept.2001)

(i) First measurement of insulation of the cable should be carried out after laying of the cable and after first monsoon for all the conductors.

(ii) Insulation measurement of the cable need not be carried for next 3 years.

(iii) Testing of all the conductors should be carried out on 5

(iii) Testing of all the conductors should be carried out on 5thth year year after 1

after 1stst monsoon and every alternate year thereafter. Spare monsoon and every alternate year thereafter. Spare

conductors will be tested every year.

conductors will be tested every year.

(iv) F

(iv) From 10th year after first monsoon, testing of all conductors

should be carried out (a) every alternate year if insulation is more than 10 mega ohm/km or (b) every year if insulation is less than 10 mega ohm/km

PREVENTIVE MEASURES:

(i)

(i) If during periodical testing, insulation resistance of cableIf during periodical testing, insulation resistance of cable is found between 5 and 1 mega ohm/km at buried

(7)

temperature, the subject cable should be programmed for

temperature, the subject cable should be programmed for

replacement.

replacement.

(ii)

(ii) If insulation resistance of the cable is found betweenIf insulation resistance of the cable is found between 1000 and 100 kilo ohm/km, at buried temperature, the

1000 and 100 kilo ohm/km, at buried temperature, the

subject cable should be replaced urgently within a year.

subject cable should be replaced urgently within a year.

(iii) If the insulation resistence of the cable is found less than 100

(iii) If the insulation resistence of the cable is found less than 100

kilo ohm/km., the subject cable must be replaced immediately

kilo ohm/km., the subject cable must be replaced immediately

on emergency basis.

on emergency basis.

PRECAUTIONS

PRECAUTIONS::

Before commencement of Meggering:

Before commencement of Meggering:

Make sure that all connections in the test circuit are tight.

Test the megger before use, whether it gives INFINITY value when not connected , and ZERO when the two terminals are connected together and the handle is rotated.

During Meggering:

Make sure when testing for earth, that the far end of the conductor is not touching, otherwise the test will show faulty insulation when such is not actually the case.

Make sure that the earth used when testing for earth and open circuits is a good one otherwise the test will give wrong information

Spare conductors should not be meggered when other working conductors of the same cable are connected to the respective circuits.

After completion of cable Meggering:

Ensure that all conductors have been reconnected properly. Test the functions of Points, Tracks & Signals connected through the cable for their correct response.

In case of signals, aspect should be verified personally. In case of points, verify positions at site.

(8)

Check whether any polarity of any feed taken through the cable

Check whether any polarity of any feed taken through the cable

has got earthed inadvertently

References

Related documents

Nanda: mengenai ASITF, secara umum tujuan dari dibentuknya ASEAN Seaport Interdiction Task Force ( ASITF) adalah untuk memperkuat koordinasi dalam meningkatkan pertukaran

Based on results of the Free Application for Federal Student Aid (FAFSA), eligible students are awarded an allotment which may be earned through part-time employment in

Making an online on two wheeler driving licence test in pune restaurant offers a display where the opportunity in the rto has also learning licenses is required. Into any third

In one of the vessels, the volume of the gas is doubled without change in its internal energy, whereas the volume of the gas is held constant in the second vessel.. The vessels are

collection, and a couple of years previously, no report of H5N1 outbreak in the Districts of Sukabumi and Cianjur (Districts’ PDSR, personal communication). Despite

This matrix is mandatory in the identification of high level HSE Risks during risk screening (Major Hazard Analysis, Environmental Impact Assessment etc.).. This matrix provides

This paper presents a possible approach for developing a violin teaching aid based on violin pedagogy, sound analysis and comparison of beginner and good player recordings..

To do this, students need to understand systemic functional linguistics (SFL), especially the textual meaning, herewith, textual grammar. The use of textual grammar helps