• No results found

Evaluation of Pavement Distress for Asphalt Pavement Using Pavement Condition Index: Case Study from Adama to Awash Arba

N/A
N/A
Protected

Academic year: 2020

Share "Evaluation of Pavement Distress for Asphalt Pavement Using Pavement Condition Index: Case Study from Adama to Awash Arba"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Fatigue Cracking [2].
Figure 5. Pavement Condition Index (PCI), Rating scale and suggested colour [3].
Figure 6. Percentage Pavement condition rating.
Table 4. Maintenance suggestion.

References

Related documents

The task in this experiment was to design and recall one traditional password and two sentences; one sentence with a positive content and the other with a negative content..

TRANS Choose the transparent level for the selected area when a motion event occurs.. The larger the value, the more transparent

How Can I Avoid Paying Interest Charges? If you pay your statement’s “New Balance” in full by the due date each month, we will not charge interest on any new transactions that post

Food handler focus groups in two Oregon counties discussed knowledge, practices, and barriers related to handwashing in the restaurant environment. Current knowledge-based

The current work puts forth an implementation of a dynamic procedure to locally compute the value of the model constant CDES , as used in the eddy simulation branch of Delayed

Management body of the Society of Authors ZAiKS is the Board of the Society with its Presidium and the Council of the Society.. Members of

Roza THUN, Head of the European Commission Delegation Venue: The EP Information Office, Parlamentu Europejskiego w Polsce, ul.. 8.30 h Departure from

If the debtor does not propose a plan within 90 days from filing, or if his plan makes the creditors worse off in the reorganization procedure than the required rate anticipates,