DOCUMENTS AND SPECIFICATIONS
FOR
ELEVATOR MODERNIZATIONS
AT
AMOS LAWRENCE AND PIERCE
ELEMENTARY SCHOOLS
BROOKLINE, MASSACHUSETTS
Bid Documents
August 29, 2014
CBI Consulting Inc.
250 Dorchester Avenue
Boston, Massachusetts 02127
(617) 268-8977
Fax (617) 464-2971
[email protected]
TABLE OF CONTENTS
ELEVATOR MODERNIZATIONS AT
AMOS LAWRENCE AND PIERCE SCHOOLS
# OF PAGES
TABLE OF CONTENTS
2
SECTION
BIDDING DOCUMENTS
00 10 06 - INVITATION TO BID
3
00 11 16 - INSTRUCTION TO BIDDERS
9
00 30 00 - FORM FOR GENERAL BID
5
00 31 00 - FORM FOR FILED SUB-BID
4
00 32 00 - PREVAILING WAGE RATES
41
CONTRACT DOCUMENTS
00 41 10 - CORI POLICY AND ACKNOWLEDGEMENT FORM
8
00 43 13 - BID SECURITY FORM
2
00 45 19 - NONCOLLUSION AFFIDAVIT (GENERAL BID ONLY)
1
00 45 44 - VOTE OF CORPORATION AUTHORIZING
EXECUTION OF CONTRACT
1
00 45 48 - CERTIFICATION OF PAYMENT OF STATE TAXES
(GENERAL BID ONLY)
1
00 50 00 - STANDARD FORM OF AGREEMENT -
AIA Doc A101 1987
8
00 52 16 - SUPPLEMENT TO STANDARD AGREEMENT
3
00 52 25 - FILED SUB-BID SUBCONTRACT
2
00 61 00 - PERFORMANCE BOND AND PAYMENT BOND
7
00 63 00 - APPLICATION AND CERTIFICATE FOR PAYMENT
1
00 64 00 - CERTIFICATE OF SUBSTANTIAL COMPLETION
1
00 65 00 - CERTIFICATE OF INSURANCE
1
00 65 50 - CHANGE ORDER
1
00 66 00 - GENERAL RELEASE AND WAIVER OF LIEN - GENERAL
CONTRACTOR
1
00 66 10 - GENERAL RELEASE AND WAIVER OF LIEN -
SUBCONTRACTOR / MATERIAL SUPPLIER
1
00 70 00 - GENERAL CONDITIONS -
AIA Doc A201 1987
24
00 73 00 - MODIFICATIONS TO THE GENERAL CONDITIONS
41
00 73 10 - SPECIAL CONDITIONS
4
00 85 10 - DRAWING LIST
1
TECHNICAL SPECIFICATIONS
DIVISION 01
GENERAL REQUIREMENTS
01 01 00 - SUMMARY OF WORK
5
01 03 00 - SPECIAL PROJECT PROCEDURES
8
01 04 00 - CONDUCT OF THE WORK
2
01 09 00 - DEFINITIONS AND STANDARDS
3
01 23 00 - ALTERNATES
1
01 30 00 - SUBMITTALS
11
SUBMITTAL TRANSMITTAL
1
01 40 00 - QUALITY CONTROL
2
01 50 00 - TEMPORARY FACILITIES
8
01 51 00 - PROTECTION
4
01 52 00 - CLEANING UP
3
01 70 00 - PROJECT CLOSEOUT
2
01 72 00 - SURVEYS AND RECORD DRAWINGS
3
DIVISION 02
SUBSURFACE INVESTIGATION & DEMOLITION
02 41 00 – SELECTIVE DEMOLITION
6
DIVISION 04
MASONRY
04 22 00 – REINFORCED UNIT MASONRY
4
DIVISION 07
THERMAL AND MOISTURE PROTECTION
07 57 00 - BELOW GRADE WATERPROOFING
7
07 84 00 - FIRESTOPPING
5
DIVISION 08
OPENINGS
08 91 19 - FIXED LOUVERS
7
DIVISION 09
FINISHES
09 90 00 - PAINTING AND COATING
6
DIVISION 14
CONVEYING EQUIPMENT
14 00 00 - ELEVATOR (
FILED SUB-BID REQUIRED
)
70
DIVISION 26
ELECTRICAL
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
INVITATION TO BID
DOCUMENT 00 10 06
INVITATION TO BID -
BID #B-14-30
The Town of Brookline, acting through the Brookline Building Commission, the
Awarding Authority, invites sealed bids for Brookline Amos Lawrence and Pierce Schools –
Elevator Modernizations Bid #B-14-30, Brookline, MA in accordance with Contract Documents
prepared by CBI Consulting Inc., 250 Dorchester Avenue, Boston, MA 02127. The work of this
Contract includes elevator modernizations, including, but not limited to, the following:
Base Bid – All work at the Amos Lawrence Elementary School
Add Alternate #1 – All work at the Pierce Elementary School
All bids for this Project are subject to the provisions of Massachusetts General Laws
(Ter. Ed), including without limitation Mass. G.L. Chapter 149, Sections 44A through 44L
inclusive; and Chapter 149, Section 26 through 27D inclusive.
Filed Sub-Bids are required for the following trades:
Elevators
Electrical
Sealed bids for the General Contract on forms furnished by the Awarding Authority will
be received by the Awarding Authority at the offices of the Brookline Building Commission,
Brookline Town Hall - Third Floor, 333 Washington Street, Brookline, MA, 02445 until 2:00
p.m. local time on Tuesday, November 18, 2014. All General Bids will be publicly opened and
read aloud immediately thereafter.
Sealed Filed Sub-bids for the trades listed herein on forms furnished by the Awarding
Authority will be received by the Awarding Authority at the Brookline Building Commission,
Brookline Town Hall - Third Floor, 333 Washington Street, Brookline, MA, 02445 until 2:00
p.m. local time on Thursday, November 6, 2014. All Filed Sub-Bids will be publicly opened and
read aloud immediately thereafter.
Each General Bidder must be certified by the Department of Capital Asset Management
and Maintenance (DCAMM) for the category of work and dollar amount of this project and to be
considered must submit with his or her Bid, a DCAMM Certification and Update Statement
indicating additional work or contracts performed or executed after the certification date. The
category of work for this Project is General Building Construction. The estimated construction
cost of this Project is $580,000.00.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
Each Filed Sub-Bidder must be certified by the Department of Capital Asset Management
and Maintenance (DCAMM) in the appropriate category of work and is eligible to submit bids
for public construction projects and to perform the work required. For a Filed Sub-Bid to be
considered eligible, a DCAMM Certificate of Eligibility in the category of work and an Update
Statement indicating additional work or contracts performed or executed after the certification
date must be submitted.
A pre-bid site inspection and meeting will be held on Tuesday, October 28, 2014 at 10:00
a.m. All Bidders are requested to meet at the Amos Lawrence School.
Each General Bidder and each Sub-Bidder may obtain complete sets of the Bidding
Documents, at the following time and location:
Plans and Specifications will be available to bidders after 2:00 PM local time, on
Wednesday October 22, 2014 at the Town of Brookline: Brookline Website:
http://www.brooklinema.gov/Bids
.
Hard copies of the Bid Documents can be obtained with
a deposit of $150.00 per set. Copies of Addenda will be mailed or delivered electronically to
registered Bidders without charge.
The full amount of each deposit for Bidding Documents will be refunded to each Bidder
returning complete sets of Bidding Documents (including Addenda if issued) to the Building
Department office in good condition, within thirty (30) days after the date of General Bid
opening. Deposits for Bidding Documents will be forfeited to the Town of Brookline if they are
not returned within the specified time limit and in the good condition.
The Bidding Documents may also be examined at the following places during normal
business hours after issuance:
Brookline Building Commission
Brookline Town Hall - Third Floor
333 Washington Street
Brookline, MA 02445
Each General Bid and each Filed Sub-Bid shall be accompanied by Bid Security equal to
five (5) percent of the total possible Bid amount, including all alternates in the form of a Bid
Bond, Certified Treasurer's or Cashier's Check issued by a responsible U.S. bank or Trust
Company, payable to the Town of Brookline. Each Bidder shall attach the required Bid Bond or
Check to their Bid Form.
The Bid Securities of all General Bidders, except those of the three lowest responsible
and eligible General Bidders, will be returned within five (5) days, Saturdays, Sundays, and legal
holidays excluded, after the opening of General Bids.
The Bid Securities of all Filed Sub-Bidders, except those of the Sub-Bidders named in
the General Bids of the three lowest responsible and eligible General Bidders, and those of the
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
INVITATION TO BID
three lowest responsible and eligible Sub-Bidders for each sub-trade, will be returned within five
(5) days, Saturdays, Sundays, and legal holidays excluded, after the opening of General Bids.
The Awarding Authority reserves the right to waive any informalities and to reject any or
all General Bids not deemed to be in the best interest of the Town. The Awarding Authority
reserves the right to reject any Filed Sub-Bid if it determines that such Sub-Bid does not
represent the Sub-Bid of a person competent to perform the Work as specified or that less than
three (3) such bids were received. (C.149, Sec.44E)
The successful General Bidder will be required to furnish a Performance Bond in the
amount of one hundred percent (100%) of the total bid, and a Labor and Materials Payment
Bond in the amount of one hundred percent (100%) of the total bid.
Attention is directed to the fact that no less than the minimum wages as set forth in
Document 00 32 00 PREVAILING WAGE RATES of the Contract Documents must be paid on
this Project and that no sales tax shall be included in their bids.
All bids shall remain in effect for sixty (60) days, Saturdays, Sundays and legal holidays
excluded, after the opening of General Bids.
The right is reserved by the Town of Brookline, Massachusetts through the Building
Commission to reject any or all bids, if it be in the public interest to do so.
Town of Brookline
Building Commission
333 Washington Street
Brookline, MA 02445
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
SECTION 00 11 16
INSTRUCTION TO BIDDERS
PART 1 - GENERAL
1.01
SCHEDULE OF DATES
A.
Deadline for advertisement for Bid in Central Register – October 14, 4:00 P.M.
B.
Advertisement appears in Central Register, October 22, 2014.
C.
Plans and Specifications will be available for bidders after 2:00 PM local time, on
Wednesday, October 22, 2014 at the Town of Brookline: Brookline Website:
http://www.brooklinema.gov/Bids
.
Hard copies of the Bid Documents can be
obtained with a deposit of $150.00 per set.
D.
Pre-bid walk-thru on Tuesday October 28, 2014 at 10:00 AM at the Amos
Lawrence School, 27 Francis Street, Brookline, MA 02445. Meet outside the front
entrance.
E.
All questions and requests for interpretations must be submitted in via Email to
Anthony Guigli at [email protected] with a copy to Steven Watchorn at
[email protected] for Filed Sub-Bidders up to and including
Thursday November 30, 2014, 5:00 P.M.
F.
Filed Sub-Bids Deadline: 2:00 P.M., Thursday November 6, 2014, in the Town
Hall, Building Commission, 333 Washington Street, 3
rdFloor, Brookline, MA
02445, where the bids will be publicly open and read.
G.
Addenda with Filed Sub-Bid results will be issued subsequent to the filed sub-bid
opening.
H.
All questions and requests for interpretations must be submitted via Email to
Anthony Guigli at [email protected] with a copy to Steven Watchorn at
[email protected] for General Bidders up to and including
Tuesday, November 11, 2014, 5:00 P.M.
I.
Addenda will be issued with interpretations as determined by the Architect.
J.
General Bids Deadline: 2:00 P.M., Tuesday November 18, 2014, in the Town
Hall, Building Commission, 333 Washington Street, 3rd Floor, Brookline, MA
02445, where the bids will be publicly open and read.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.02
BIDDING PROCEDURE
A.
Bids for the work are subject to the provisions of General Laws, Chapter 149,
Sections 44A-44L inclusive, as amended. Regulations governing the bidding
procedures as set forth in the above mentioned amended General Laws must be
followed.
B.
In the event of any inconsistencies between any of the provisions of these
Contract Documents and of the cited statute, anything herein to the contrary
notwithstanding, the provisions of the said statute shall control.
C.
No General Bid received by the Awarding Authority after the time respectively
established herein for the opening of General Bids will be considered, regardless
of the cause for the delay in the receipt of any such bid.
1.03
WITHDRAWAL OF BIDS
A.
Bids may be withdrawn prior to the time respectively established for the opening
of General Bids only on written request to the Awarding Authority.
1.04
INTERPRETATION OF CONTRACT DOCUMENTS
A.
No oral interpretation will be made to any bidder. All questions or requests for
interpretations must be made in writing to the Architect.
B.
Every interpretation made to a bidder will be in the form of an Addendum, to the
drawings and/or specifications, which will be made available to all persons to
whom Contract Documents have been issued.
C.
Failure of the Awarding Authority to send, or of any bidder to receive any such
addendum shall not relieve any bidder form obligation under his bid as submitted.
D.
All such addenda shall become a part of the Contract Documents.
1.05
EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A.
Each bidder shall visit the site of the proposed work and fully acquaint himself
with conditions as they exist, and shall also thoroughly examine the Contract
Documents. Failure of any bidder to visit the site and acquaint himself with the
Contract Documents shall not relieve any bidder from any obligation with respect
to his bid.
B.
By submitting a bid, the bidder agrees that the Contract Documents are adequate
and that the required result can be produced. The successful bidder shall furnish
any and all labor, materials, insurance, permits and all other items needed to
produce the required result to the satisfaction of the Awarding Authority.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.06
BID SECURITY
A.
The General Contractor's bid must be accompanied by bid security in the amount
of five percent (5%) of the bid.
B.
At the option of the bidder, the security may be bid bond, cash, certified,
treasurer's or cashier's check issued by a responsible bank or trust company. No
other type of bid security is acceptable.
Bid Bonds shall be issued by a Surety Company qualified to do business under the
laws of the Commonwealth of Massachusetts.
C.
Certified, Treasurer's or Cashier's check shall be made payable to the Town of
Brookline, Massachusetts.
D.
The bid security shall secure the execution of the Contract and the furnishing of a
Performance and Payment Bond by the successful General Bidder.
E.
Should any General Bidder to whom an award is made fail to enter into a contract
therefore within five (5) days, Saturdays, Sundays and Legal Holidays, excluded,
after notice of award has been mailed to him or fail within such time to furnish a
Performance Bond and also a Labor and Materials or Payment Bond as required,
the amount so received from such General Bidder through his Bid Bond, Cash,
Certified, Treasurer's or Cashier's check as bid deposit shall become the property
of the Town of Brookline, Massachusetts as liquidated damages; provided that,
the amount of the bid deposit which becomes the property of the Town of
Brookline, Massachusetts shall not in any event exceed the difference between his
bid price and the bid price of the next lowest responsible and eligible bidder; and
provided further that, in case of death, disability, bona fide clerical error or
mechanical error of a substantial nature, or other unforeseen circumstances
affecting the General Bidder, his deposit shall be returned to him.
1.07
BID FORM
A.
General Bids shall be submitted on the "FORM FOR GENERAL BID" enclosed.
Erasures or other changes must be explained or noted over the signature of the
bidder.
B.
Bid forms must be completely filled in. Bids which are incomplete, conditional,
or obscure, or which contain additions not called for will be rejected.
C.
General Bidders shall submit one (1) set of executed bid forms to the Awarding
Authority.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.08
SUBMISSION OF BIDS AND BID SECURITIES
A.
Each bid submitted by a General Contractor shall be enclosed in a sealed
envelope which shall be placed with the bid security in an outer envelope. The
outer envelope shall be sealed and clearly marked as follows:
(Firm Name):
General Bid and Bid Security for:
Elevator Modernizations at
Amos Lawrence and Pierce Elementary Schools,
Brookline, Massachusetts
1.09
AWARD OF CONTRACT
A.
The Contract shall be awarded to the lowest responsible and eligible General
Bidder on the basis of competitive bids in accordance with the procedure set forth
in the provision of Section 44B-44L inclusive, as amended or inserted, by Chapter
149 of the General Laws of the Commonwealth of Massachusetts.
B.
If the bidder selected as the General Contractor fails to perform his agreement to
execute a contract in accordance with the terms of his General Bid, and furnish a
Performance Bond and also a Labor and Materials or Payment Bond, as stated in
his General Bid in accordance with Section 44F, an award shall be made to the
next lowest responsible and eligible bidder.
C.
The words "lowest responsible and eligible bidder" shall be the bidder whose
name is the lowest of those bidders possessing the skill, ability and integrity
necessary to the faithful performance of the work and who shall certify that he is
able to furnish labor that can work in harmony with all other elements of labor
employed, or to be employed, on the work. Essential information in regard to
such qualifications shall be submitted in such form as the Awarding Authority
may require.
D.
Action on the award will be taken within thirty (30) days, Saturdays, Sundays and
Legal Holidays excluded after the opening of the bids.
1.10
PRE-BID WALK-THRU
A.
Pre-bid walk-thru, meet on Tuesday October 28, 2014 at 10:00 AM at Amos
Lawrence School, Brookline, MA. Meet outside the front entrance.
1.11
CORI
A.
A CORI check will be required for all personnel working in the building or on
site. The CORI forms are included in the Contract Documents.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.12
OTHER PROJECTS AT THE SITE(S)
A.
There are other construction projects that may be underway at the same time as
the work of this project. The awarded General Contractor, Filed Sub-Contractors
and all Subcontractors shall work in harmony with any and all other General
Contractors and Trades and shall not impede any other work being performed at
the Amos Lawrence or Pierce Elementary Schools by the Town of Brookline or
the Brookline School Department.
1.
At Lawrence School there is a project that is currently underway to add
classrooms in the rear of the building adjacent to Newell Road. It is
anticipated that this project will be complete in June, 2015, but it could
extend longer.
2.
At the Pierce School, it is anticipated that an electrical systems upgrade
project will run concurrently with the work of this project, during the
Summer, 2015. The scope of work includes, but is not limited to
replacement of the service and all of the Federal panelboards. Power is
expected to be available to the awarded Contractor(s) for this project at all
times, with the exception of one (1) 48-hour period (dates unknown) while
the service is changed over.
1.13
CONTRACT DOCUMENTS
A.
Each General Bidder and each Sub-Bidder may obtain complete sets of the
Bidding Documents, including Plans and Specifications will be available for
bidders after 2:00 PM local time, on Wednesday, October 22, 2014 at the Town of
Brookline: Brookline Website:
http://www.brooklinema.gov/Bids
.
Hard copies
of the Bid Documents can be obtained with a deposit of $150.00 per set.
Copies of Addenda will be mailed or delivered electronically to registered
Bidders without charge.
The full amount of each deposit for Bidding Documents will be refunded to each
Bidder returning complete sets of Bidding Documents (including Addenda if
issued) to the printer’s office in good condition, within thirty (30) days after the
date of General Bid opening. Deposits for Bidding Documents will be forfeited to
the Town of Brookline if Bidding Documents are not returned within the specified
time limit.
The Bidding Documents may also be examined at the following places during
normal business hours after issuance:
Brookline Building Commission
Brookline Town Hall - Third Floor
333 Washington Street
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.14
EQUALITY
A.
Except where otherwise specifically provided to the contrary, the words "or
equal" are hereby inserted immediately following the name or description of each
article, assembly, system, or any component part thereof, in the Contract
Documents. It is the contractor's responsibility to provide all the research and
documentation that would prove a product or assembly is "equal". Failure to
provide research or documentation does not alleviate the contractor's
responsibility to meet the schedule.
1.15
TAX FREE NUMBER
A.
The Town of Brookline has a tax free number.
1.16
ARBITRATION AND MEDIATION
A.
The Town of Brookline does not use Arbitration. Any and all references to
arbitration are stricken from the contract.
B.
The Town of Brookline does not use Mediation. Any and all references to
mediation are stricken from the contract.
1.17
SCHEDULE
A.
All work shall be completed by
238
days from the Notice to Proceed.
1.18
LATE FEES
A.
If the work is not Substantially Complete by the dates noted in Section 1.15A, the
contractor shall be charged $500.00 per calendar day to pay for consulting and
testing fees to manage and arrange for the completion of the project. Late fees
will be deducted from the Contract via Change Order.
1.19
AWARD
A.
The Awarding Authority reserves the right to reject any or all bids, if it be in the
public interest to do so, and to act upon the bids and make its award in any lawful
manner.
1.20
MINIMUM WAGE SCHEDULE
A.
Bids shall be made on the basis of the Minimum Wage Schedule, as determined
by the Commissioner of Labor and Industries, pursuant to the provision of
Chapter 149, Section 26 to 27D inclusive, of the Massachusetts General Laws.
B.
All Bids shall be accompanied by the Bidder's Certification regarding payment of
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.21
CONFLICT OF INTEREST
A.
A bidder filing a proposal thereby certifies that the proposal is made in good faith,
without fraud, collusion, or connection of any kind with any other bidder for the
same work, and that the bidder is completing solely on its own behalf without
connection with, or obligation to, any undisclosed person or firm.
1.22
PROCEED ORDERS
A.
No bidder is to proceed without a proceed order as set out in the contract.
1.23
STAGING
A.
The General Contractor shall provide all the vertical access (which includes
staging, vertical lifts, etc.) and hoisting for all the work of the Contract over 8’-0”
above grade or finish floor. General Contractor will provide complete coverage
of all wall areas receiving work and shall provide full decks and complete access
for File Sub-Bidders, subcontractors, as well as the Architect.
1.24
CONSTRUCTION BARRICADES
A.
The General Contractor shall provide all barricades to enclose the work area to
prevent unauthorized access to the site.
1.
The barricades shall provide enough room for all construction activities to
be performed while separated from pedestrians and staff on site.
2.
Safety is the sole responsibility of the Contractor and any barricades
necessary to protect the work and the public shall be provided.
1.25
INSURANCE
A.
The contractor shall purchase and maintain, at his expense all insurance required
by the Contract. Documents and all insurance required by the applicable laws of
Massachusetts, including but not limited to, General Laws, Chapter 146, in
connection with all hoisting equipment.
B.
The Contractor shall purchase and maintain such insurance as will protect him
from claims under workmen’s compensation acts and from claims for damages
because of bodily injury, including death and all property damage including,
without limitation, damage to buildings and adjoining the site of construction
which might arise from and during operations under this contract, whether such
operations be by himself or by any subcontractor or anyone directly or indirectly
employed by either of them including:
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
The contractor shall provide insurance for the payment of compensation
and the furnishing of other benefits under Chapter 152 of the General
Laws (so-called Worker’s Compensation Act) to all persons to be
employed under this contract and discontinuance of such insurance as
aforesaid shall be deemed a material breach of this Contract and shall
operate as an immediate termination thereof. The contractor shall, without
limiting the generality of the foregoing, conform to the provisions of
Section 34A of Chapter 149 of the General Laws, which Section is
incorporated herein by reference and made a part of hereof.
2.
Comprehensive General Liability Insurance
Minimum bodily injury limits of $ 500,000 per person and $1,000,000 per
accident, and property damage limits of $500,000 per accident and
$1,000,000 aggregate during any twelve (12) month period, shall include
the following:
a.
Public liability (bodily injury and property damage)
b.
X.C.U. (explosion, collapse, and underground utilities)
c.
Independent contractor’s protective liability.
d.
Products and completed operations.
e.
Save harmless agreement for Owner and Architects set forth in
ARTICLE 10.11 of the GENERAL CONDITIONS.
3.
Comprehensive All Risk Motor Vehicle Liability Insurance
Minimum bodily injury limits of $ 500,000 per person, $1,000,000 per
accident, and property damage limit of $1,000,000 per accident.
4.
All Risk Insurance
Covering all Contractor’s equipment with a provision for Waiver of
Subrogation against the Owner and the Architect.
5.
Excess Liability Insurance in Umbrella Form with combined Bodily Injury
and Property Damage Limit of $1,000,000.
6.
Town of Brookline and CBI Consulting Inc. shall be listed as Additional
Insured with a Waiver of Subrogation on the insurance policy for this
project.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
1.26
SITE ACCESS
A.
The General Contractor shall gain access to the site via routes approved by the
Owner.
1.
The General Contractor as part of the bid price will restore all roads,
curbs, driveways, walks and grassed or landscaped areas damaged during
construction.
1.27
CONTRUCTION TRAILER
A.
The General Contractor shall locate the construction trailer/storage trailer at
locations approved by the Owner in advance of the start of work.
B.
The General Contractor shall locate all on site stored or staged materials within
the enclosed area designated by the Owner in advance of the start of work.
1.28
BUILDING PERMIT FEES
A.
Building permit fees will be waived for this project. However, a permit is still
required for the work.
1.29
EQUAL OPPORTUNITY
A.
The Town of Brookline is an equal opportunity employer.
1.30
COMPLETE BID FORMS
A.
Please Note: Each bidder must fill in all the blanks on all the bid forms, even if
the information is “zero dollars” or “not applicable”. Also, please acknowledge
all Addenda even if they do not pertain to your trade.
1.31
COMPLIANCE WITH MASSACHUSETTS GENERAL LAWS
A.
Before a contract may be executed by the Town, the successful Bidder will be
required, in accordance with the provisions of M.G.L. Chapter 62C, Section 49A,
to execute and file with the Town the following certificate:
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
B.
“Pursuant to Massachusetts General Laws, Chapter 62C, Section 49A, I certify
under the penalty of perjury that I, to the best of my knowledge and belief have
filed all state tax returns and paid all the state taxes required under law.
Signature of Individual or Corporate Name
By:
(Signature of Corporate Officer if applicable)
Title:
Social Security Number of Federal Identification Number
END OF SECTION
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
SECTION 00 30 00
FORM FOR GENERAL BID
ELEVATOR MODERNIZATIONS AT
AMOS LAWRENCE AND PIERCE ELEMENTARY SCHOOLS
BROOKLINE, MASSACHUSETTS
November 18, 2014
Brookline Town Hall
Building Commission
333 Washington Street, 3
rdFloor
Brookline, Massachusetts 02445
A.
Basic Price
The undersigned, having visited the site of the above project and having familiarized myself with
the local conditions affecting the cost of the work and with the contract documents, including
Amendments and Addenda Nos.
, hereby proposes to furnish all labor, materials,
tools, equipment, insurance, permits, taxes, and to do and lawfully perform all things as provided
in the specifications, all in accordance with the contract documents, for the sum of:
Dollars, $
B.
The subdivision of the proposed contract price is as follows:
Item 1.
The work of the General Contractor, being all work other than that
covered by Item 2. $
Item 2.
Sub Bids as follows:
Sub-Trade
Number of Sub-Bidder
Amount
Bonds required indicated
by "Yes" or "No"
$
$
$
Total of Item 2
$
C.
ALTERNATES:
ADD ALTERNATE #1:
All work at the Pierce Elementary School, 50 School
Street, Brookline, MA shall be included in Add Alternate #1. Refer to drawings
and specifications.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
D.
The undersigned agrees that, if s/he is selected as general contractor, he will
within five days, Saturdays, Sundays and legal holidays excluded, after
presentation thereof by the Awarding Authority, execute a contract in accordance
with the terms of this bid and furnish a performance bond and also a labor and
materials or payment bond, each of a surety company qualified to do business
under the laws of the Commonwealth and satisfactory to the Awarding Authority
and each in the sum of the contract price, the premiums for which are to be paid
by the general contractor and are included in the contract price.
E.
The undersigned certifies that s/he is able to furnish labor that can work in
harmony with all other elements of labor employed or to be employed in the work
and that s/he will comply fully with all laws and regulations applicable to awards
made subject to section forty-four A.
F.
The undersigned as Bidder certifies that if this proposal is accepted, s/he will
furnish to the Town of Brookline with the invoice for the material or equipment
supplied two copies of any and all Material Safety Data Sheets applicable to such
material or equipment, as required by M.G.L. Chapter 111F, so called "Right to
Know Law".
G.
The undersigned certifies under penalties of perjury that this bid is in all respects
bona fide, fair and made without collusion or fraud with any other person. As
under in this section, the work "person" shall mean any natural person, joint
venture, partnership, corporation, or other business or legal entity.
H.
Substantial Completion:
238
days after Notice to Proceed.
Sincerely,
(Bidder)
(Address of Bidder)
By:
(Title - Owner*, Partner*)
(Seal, if Corporation)
By:
(If Corporation - Name and Office)
* If the business owned by the individual or partnership is conducted under a trade or assumed
name, a certified copy of doing business under an assumed name should be annexed.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
I.
BIDDER’S CERTIFICATION REGARDING PAYMENT OF PREVAILING
WAGE RATES
The undersigned bidder hereby certifies, under the pains and penalties of perjury,
that the foregoing bid is based upon the payment to laborers to be employed on
the project of wages in an amount no less than the applicable prevailing wage
rates established for the project by the Massachusetts Department of Labor and
Industries. The undersigned bidder agrees to indemnify the Awarding Authority
for, from and against any loss, expense, damages, actions or claims, including any
expense incurred in connection with any delay or stoppage of the project work,
arising out of or as a result of (1) the failure of the said bid to be based upon the
payment of the said applicable prevailing wage rates or (2) the failure of the
bidder, if selected as the contractor, to pay laborers employed on the project the
said applicable prevailing wage rates.
DATED:
NAME OF BIDDER:
BY:
NAME:
TITLE:
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
Acknowledgment of Principal, if a Corporation
State of
)
:SS:
County of
)
On this
day of
20
before me personally came
to me known, who, being by me duly sworn, did
depose and say that he/she resides
at
, that he/she is the
of
the
corporation described herein and which executed the foregoing instrument; that he/she knows the
seal of said corporation; that one of the seals affixed to said instrument is such seal; that it was so
affixed by order of the directors of said corporation, and that he/she signed his/her name thereto
by like order.
(Notary Public)
Acknowledgment of Principal, if a Partnership
State of
)
:SS:
County of
)
On this
day of
20
before me personally came
to me known, and known to me to be one of the
members of the firm of
who executed the foregoing instrument and he/she
acknowledged to me that he/she executed the same as and for the act of said firm.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
Acknowledgment of Principal, if an Individual
State of
)
:SS:
County of
)
On this
day of
20
before me personally came
to me known, and known to me to be the person
described herein and who executed the foregoing instrument and he/she acknowledged to me that
he/she executed the same.
(Notary Public)
(If bidder is a partnership, state here the name and residence of each member thereof)
Name of Partners
Residence Address
(If bidder is a corporation, state here the title, name, and residence of each member thereof)
Title
Name
Residence Address
Organized under the laws of the state of
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
SECTION 00 31 00
FORM FOR FILED SUB-BID
Insert Trade:__________________
ELEVATOR MODERNIZATIONS AT
AMOS LAWRENCE AND PIERCE ELEMENTARY SCHOOLS
BROOKLINE, MASSACHUSETTS
November 6, 2014
To all General Bidders except those hereinafter expressly excluded:
A.
The undersigned proposes to furnish all labor and materials required for completing, in
accordance with the hereinafter described plans, specifications and addenda, all the work
specified in Section Nos.
of the
specifications and in any plans specified in such section, prepared by CBI Consulting for
Elevator Modernizations at the Amos Lawrence and Pierce Elementary Schools,
Brookline, Massachusetts, for the contract sum of
dollars ($
).
B.
ALTERNATES:
1.
ADD ALTERNATE #1:
All work at the Pierce Elementary School, 50
School Street, Brookline, MA shall be included in Add Alternate #1. Refer to
drawings and specifications.
__________________________dollars ($___________).
C.
This sub-bid includes addenda number
,
,
,
,
D.
This sub-bid
[ ]
May be used by any general bidder except:
[ ]
May only be used by the following general bidders:
(To exclude general bidders, insert “X” in one box only and fill in blank following that
box. Do not answer if no general bidders are excluded.)
E.
The undersigned agrees that, if he is selected as sub-bidder, he will, within five days,
Saturdays, Sundays and legal holidays excluded, after presentation of a subcontract by
the general bidder selected as the General Contractor, execute with such general bidder a
subcontract in accordance with the terms of this sub-bid and contingent upon the
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
execution of the general contract, and, if requested to do so in the general bid by such
general bidder, who shall pay the premiums therefore, furnish a performance and
payment bond of a surety company qualified to do business under the laws of the
Commonwealth and satisfactory to the Awarding Authority, in the full sum of the
subcontract price.
F.
The names of all persons, firms and corporations performing such class of work or part
thereof for which the section of the specifications for the sub-trade require a listing in this
paragraph (including the undersigned if customarily furnished by persons on his own
payroll and in the absence of a contrary provision in the specifications), the name of each
such class of work, or part thereof, and the bid price for each such class of work or part
thereof are:
NAME
CLASS OF WORK
BID PRICE
(Do not give bid price for any class or part thereof furnished by undersigned.)
G.
The undersigned agrees that the above list of bids to the undersigned represents a bona
fide bid based on hereinbefore described plans, specifications, and addenda, and that, if
the undersigned is awarded the contract, they will be used for the work indicated at the
amounts stated, if satisfactory to the Awarding Authority.
H.
The undersigned further agrees to be bound to the General Contractor by the terms of the
hereinbefore described plans, specifications (including all general conditions stated
therein), and addenda, and to assume toward him all the obligations and responsibilities
that he, by those documents, assumes toward the Owner.
I.
The undersigned offers the following information as evidence for his qualifications to
perform the work as bid upon according to all requirements of the plans and
specifications:
1.
Have been in business under present business name
years.
2.
Have ever failed to complete any work awarded?
3.
List three or more recent buildings with names of General Contractor and
Architect on which you served as subcontractor for work of similar character as
required for the above named buildings:
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
GENERAL
AMOUNT OF
BUILDING
ARCHITECT
CONTRACTOR
CONTRACT
4.
Bank Reference:
J.
The undersigned hereby certifies that he is able to furnish labor that can work in harmony
with all other elements of labor employed or to be employed on the work and that he will
comply fully with the laws and regulations applicable to awards of subcontractors subject
to section fourth-four F.
K.
The undersigned further agrees that, if the undersigned fails to perform his agreement to
execute a subcontract with the General Contractor and furnish a performance and
payment bond if requested to do so in the general bid by the general bidder, the bid
deposit accompanying the copy of this bid filed with the Award Authority shall become
and be the property of the Awarding Authority as liquidated damages. The undersigned
understands that, if he so executes a subcontract with the General Contractor and
furnishes a performance and payment bond, if requested to do so, the bid deposit will be
returned within five (5) days after execution of the general contract.
L.
The undersigned represents that this proposal is made in good faith without fraud,
collusion or connection of any kind with other bidder for the same work, that the
undersigned is competing solely in his own behalf without connection with, or obligation
to, any undisclosed person or corporation, that no other person or corporation has any
interest in the profits of the contract, that the undersigned has read the form of contract
attached hereto and is fully informed in regard to all provisions thereof and to the plans
and specifications therein referred to, and that the undersigned has visited the premises
described in said form of contract and made his own examination of the place where the
work is to be done and of all conditions pertaining to the work had has made his own
estimates and from such examination and estimate makes this proposal.
M.
In accordance with M.G.L., the undersigned certifies that all employees to be employed
at the work site will have successfully completed a course in construction safety and
health approved by OSHA that is at least ten (10) hours in duration at the time the
employee begins work and shall furnish documentation of successful completion of said
course with the first certified payroll report for each employee.
ELEVATOR MODERNIZATIONS Boston, Massachusetts
BROOKLINE, MASSACHUSETTS Tel: (617) 268-8977
CBI JOB NO.: 14007 Fax: (617) 464-2971
N.
The Federal Social Security Identification Number of the sub-bidder (the number used on
Employer’s Quarterly Federal Tax Return, US Treasury Department Form 941) is:
DATE
Sub Bidder
(Company Name)
By:
Signature of Authorized Representative
Title:
(Affix Seal)
Business Address:
City and State:
Telephone No.
O.
BIDDER’S CERTIFICATION REGARDING PAYMENT OF PREVAILING WAGES
The undersigned bidder hereby certifies, under the pains and penalties of perjury, that the
foregoing bid is based upon the payment to laborers to be employed on the project of wages in an
amount no less than the applicable prevailing wage rates established for the project by the
Massachusetts Department of Labor and Industries. The undersigned bidder agrees to indemnify
the Awarding Authority for, from and against any loss, expense, damages, actions or claims,
including any expense incurred in connection with any delay or stoppage of the project work,
arising out of or as a result of (1) the failure of the said bid to be based upon the payment of the
said applicable prevailing wage rates or (2) the failure of the bidder, if selected as the Contractor,
to pay laborers employed on the project the said applicable prevailing wage rates.
DATED:
NAME OF BIDDER:
BY:
NAME:
TITLE:
THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF LABOR STANDARDS As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Prevailing Wage Rates
DEVAL L. PATRICK RACHEL KAPRIELIAN
Secretary Governor
HEATHER E. ROWE
Elevator Modernization project at the Amos Lawrence School (Pierce School elevator modernization is Add Alternate #1) and associated work.
Director
Awarding Authority: Town of Brookline
City/Town:
Contract Number: 14007 BROOKLINE
Description of Work:
Job Location: 27 Francis Street
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards (“DLS”) if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or any sub-contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentice must keep his/her apprentice identification cardon his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAS, the apprentice must be paid the journeyworker's rate for the trade.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F “rental of equipment” contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at
http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Classification Base Wage Health Pension Total Rate Unemployment
Effective Date
Construction
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2014 $31.30 $9.91 $8.80 $0.00 $50.01
$50.54 12/01/2014 $31.30 $9.91 $9.33 $0.00 $50.89 06/01/2015 $31.65 $9.91 $9.33 $0.00 $51.39 08/01/2015 $31.65 $10.41 $9.33 $0.00 $52.14 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.64 06/01/2016 $32.15 $10.41 $10.08 $0.00 $53.14 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.95 12/01/2016 $32.15 $10.91 $10.89 $0.00
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2014 $31.37 $9.91 $8.80 $0.00 $50.08
$50.61 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.96 06/01/2015 $31.72 $9.91 $9.33 $0.00 $51.46 08/01/2015 $31.72 $10.41 $9.33 $0.00 $52.21 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.71 06/01/2016 $32.22 $10.41 $10.08 $0.00 $53.21 08/01/2016 $32.22 $10.91 $10.08 $0.00 $54.02 12/01/2016 $32.22 $10.91 $10.89 $0.00
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2014 $31.49 $9.91 $8.80 $0.00 $50.20
$50.73 12/01/2014 $31.49 $9.91 $9.33 $0.00 $51.08 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.58 08/01/2015 $31.84 $10.41 $9.33 $0.00 $52.33 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.83 06/01/2016 $32.34 $10.41 $10.08 $0.00 $53.33 08/01/2016 $32.34 $10.91 $10.08 $0.00 $54.14 12/01/2016 $32.34 $10.91 $10.89 $0.00 ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33
$118.48 08/01/2015 $90.51 $9.80 $18.17 $0.00
AIR TRACK OPERATOR
LABORERS - ZONE 1 06/01/2014 $34.85 $7.30 $12.70 $0.00 $54.85 $55.60 12/01/2014 $35.60 $7.30 $12.70 $0.00 $56.35 06/01/2015 $36.35 $7.30 $12.70 $0.00 $57.10 12/01/2015 $37.10 $7.30 $12.70 $0.00 $57.85 06/01/2016 $37.85 $7.30 $12.70 $0.00 $58.85 12/01/2016 $38.85 $7.30 $12.70 $0.00
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93
$48.83 12/01/2014 $32.48 $10.40 $5.95 $0.00 $49.78 06/01/2015 $33.43 $10.40 $5.95 $0.00 $50.73 12/01/2015 $34.38 $10.40 $5.95 $0.00 ASPHALT RAKER LABORERS - ZONE 1 06/01/2014 $34.35 $7.30 $12.70 $0.00 $54.35 $55.10 12/01/2014 $35.10 $7.30 $12.70 $0.00 $55.85 06/01/2015 $35.85 $7.30 $12.70 $0.00 $56.60 12/01/2015 $36.60 $7.30 $12.70 $0.00 $57.35 06/01/2016 $37.35 $7.30 $12.70 $0.00
Classification Base Wage Health Pension Total Rate Unemployment
Effective Date
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4 06/01/2014 $41.49 $10.00 $14.20 $0.00 $65.69
$66.69 12/01/2014 $42.49 $10.00 $14.20 $0.00 $67.44 06/01/2015 $43.24 $10.00 $14.20 $0.00 $68.69 12/01/2015 $44.49 $10.00 $14.20 $0.00 $69.44 06/01/2016 $45.24 $10.00 $14.20 $0.00 $70.69 12/01/2016 $46.49 $10.00 $14.20 $0.00 $71.69 06/01/2017 $47.49 $10.00 $14.20 $0.00 $72.69 12/01/2017 $48.49 $10.00 $14.20 $0.00
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4 06/01/2014 $41.49 $10.00 $14.20 $0.00 $65.69
$66.69 12/01/2014 $42.49 $10.00 $14.20 $0.00 $67.44 06/01/2015 $43.24 $10.00 $14.20 $0.00 $68.69 12/01/2015 $44.49 $10.00 $14.20 $0.00 $69.44 06/01/2016 $45.24 $10.00 $14.20 $0.00 $70.69 12/01/2016 $46.49 $10.00 $14.20 $0.00 $71.69 06/01/2017 $47.49 $10.00 $14.20 $0.00 $72.69 12/01/2017 $48.49 $10.00 $14.20 $0.00
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BARCO-TYPE JUMPING TAMPER
LABORERS - ZONE 1 06/01/2014 $34.35 $7.30 $12.70 $0.00 $54.35 $55.10 12/01/2014 $35.10 $7.30 $12.70 $0.00 $55.85 06/01/2015 $35.85 $7.30 $12.70 $0.00 $56.60 12/01/2015 $36.60 $7.30 $12.70 $0.00 $57.35 06/01/2016 $37.35 $7.30 $12.70 $0.00 $58.35 12/01/2016 $38.35 $7.30 $12.70 $0.00
For apprentice rates see "Apprentice- LABORER"
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS - ZONE 1 06/01/2014 $34.85 $7.30 $12.70 $0.00 $54.85 $55.60 12/01/2014 $35.60 $7.30 $12.70 $0.00 $56.35 06/01/2015 $36.35 $7.30 $12.70 $0.00 $57.10 12/01/2015 $37.10 $7.30 $12.70 $0.00 $57.85 06/01/2016 $37.85 $7.30 $12.70 $0.00 $58.85 12/01/2016 $38.85 $7.30 $12.70 $0.00
For apprentice rates see "Apprentice- LABORER"
BOILER MAKER
Classification Base Wage Health Pension Total Rate Unemployment Effective Date BOILERMAKER - Local 29 Apprentice -01/01/2010 Health Pension Supplemental Unemployment
Step percent Apprentice Base Wage Total Rate
Effective Date 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 Notes:
Apprentice to Journeyworker Ratio:1:5 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
BRICKLAYERS LOCAL 3 (BOSTON)
$77.36 08/01/2014 $48.96 $10.18 $18.22 $0.00 $77.92 02/01/2015 $49.52 $10.18 $18.22 $0.00 $78.89 08/01/2015 $50.42 $10.18 $18.29 $0.00 $79.46 02/01/2016 $50.99 $10.18 $18.29 $0.00 $80.44 08/01/2016 $51.89 $10.18 $18.37 $0.00 $81.01 02/01/2017 $52.46 $10.18 $18.37 $0.00
BRICK/PLASTER/CEMENT MASON - Local 3 Boston Apprentice
-08/01/2014
Health Pension
Supplemental Unemployment
Step percent Apprentice Base Wage Total Rate
Effective Date 1 50 $24.48 $10.18 $18.22 $0.00 $52.88 2 60 $29.38 $10.18 $18.22 $0.00 $57.78 3 70 $34.27 $10.18 $18.22 $0.00 $62.67 4 80 $39.17 $10.18 $18.22 $0.00 $67.57 5 90 $44.06 $10.18 $18.22 $0.00 $72.46 02/01/2015 Health Pension Supplemental Unemployment
Step percent Apprentice Base Wage Total Rate
Effective Date 1 50 $24.76 $10.18 $18.22 $0.00 $53.16 2 60 $29.71 $10.18 $18.22 $0.00 $58.11 3 70 $34.66 $10.18 $18.22 $0.00 $63.06 4 80 $39.62 $10.18 $18.22 $0.00 $68.02 5 90 $44.57 $10.18 $18.22 $0.00 $72.97 Notes:
Classification Base Wage Health Pension Total Rate Unemployment
Effective Date
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4 06/01/2014 $41.10 $10.00 $14.20 $0.00 $65.30
$66.29 12/01/2014 $42.09 $10.00 $14.20 $0.00 $67.03 06/01/2015 $42.83 $10.00 $14.20 $0.00 $68.27 12/01/2015 $44.07 $10.00 $14.20 $0.00 $69.02 06/01/2016 $44.82 $10.00 $14.20 $0.00 $70.25 12/01/2016 $46.05 $10.00 $14.20 $0.00 $71.24 06/01/2017 $47.04 $10.00 $14.20 $0.00 $72.23 12/01/2017 $48.03 $10.00 $14.20 $0.00
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS - FOUNDATION AND MARINE 06/01/2014 $35.20 $7.30 $12.90 $0.00 $55.40
$56.15 12/01/2014 $35.95 $7.30 $12.90 $0.00 $56.90 06/01/2015 $36.70 $7.30 $12.90 $0.00 $57.65 12/01/2015 $37.45 $7.30 $12.90 $0.00 $58.40 06/01/2016 $38.20 $7.30 $12.90 $0.00 $59.40 12/01/2016 $39.20 $7.30 $12.90 $0.00
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING LABORER
LABORERS - FOUNDATION AND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25
$55.00 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.75 06/01/2015 $35.55 $7.30 $12.90 $0.00 $56.50 12/01/2015 $36.30 $7.30 $12.90 $0.00 $57.25 06/01/2016 $37.05 $7.30 $12.90 $0.00 $58.25 12/01/2016 $38.05 $7.30 $12.90 $0.00
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING TOP MAN
LABORERS - FOUNDATION AND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25
$55.00 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.75 06/01/2015 $35.55 $7.30 $12.90 $0.00 $56.50 12/01/2015 $36.30 $7.30 $12.90 $0.00 $57.25 06/01/2016 $37.05 $7.30 $12.90 $0.00 $58.25 12/01/2016 $38.05 $7.30 $12.90 $0.00
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR
LABORERS - ZONE 1 06/01/2014 $34.35 $7.30 $12.70 $0.00 $54.35 $55.10 12/01/2014 $35.10 $7.30 $12.70 $0.00 $55.85 06/01/2015 $35.85 $7.30 $12.70 $0.00 $56.60 12/01/2015 $36.60 $7.30 $12.70 $0.00 $57.35 06/01/2016 $37.35 $7.30 $12.70 $0.00 $58.35 12/01/2016 $38.35 $7.30 $12.70 $0.00
For apprentice rates see "Apprentice- LABORER"
CARPENTER
CARPENTERS -ZONE 1 (Metro Boston) 09/01/2014 $41.65 $9.80 $16.11 $0.00 $67.56
$68.58 03/01/2015 $42.67 $9.80 $16.11 $0.00
Classification Base Wage Health Pension Total Rate Unemployment
Effective Date
CARPENTER - Zone 1 Metro Boston Apprentice
-09/01/2014
Health Pension
Supplemental Unemployment
Step percent Apprentice Base Wage Total Rate
Effective Date 1 50 $20.83 $9.80 $1.57 $0.00 $32.20 2 60 $24.99 $9.80 $1.57 $0.00 $36.36 3 70 $29.16 $9.80 $11.40 $0.00 $50.36 4 75 $31.24 $9.80 $11.40 $0.00 $52.44 5 80 $33.32 $9.80 $12.97 $0.00 $56.09 6 80 $33.32 $9.80 $12.97 $0.00 $56.09 7 90 $37.49 $9.80 $14.54 $0.00 $61.83 8 90 $37.49 $9.80 $14.54 $0.00 $61.83 03/01/2015 Health Pension Supplemental Unemployment
Step percent Apprentice Base Wage Total Rate
Effective Date 1 50 $21.34 $9.80 $1.57 $0.00 $32.71 2 60 $25.60 $9.80 $1.57 $0.00 $36.97 3 70 $29.87 $9.80 $11.40 $0.00 $51.07 4 75 $32.00 $9.80 $11.40 $0.00 $53.20 5 80 $34.14 $9.80 $12.97 $0.00 $56.91 6 80 $34.14 $9.80 $12.97 $0.00 $56.91 7 90 $38.40 $9.80 $14.54 $0.00 $62.74 8 90 $38.40 $9.80 $14.54 $0.00 $62.74 Notes:
Apprentice to Journeyworker Ratio:1:5 CEMENT MASONRY/PLASTERING
BRICKLAYERS LOCAL 3 (BOSTON) 07/01/2014 $43.77 $10.90 $18.71 $1.30 $74.68
$75.60 01/01/2015 $44.69 $10.90 $18.71 $1.30 $76.20 07/01/2015 $45.29 $10.90 $18.71 $1.30 $77.12 01/01/2016 $46.21 $10.90 $18.71 $1.30