• No results found

County Wide Chip Seal

N/A
N/A
Protected

Academic year: 2021

Share "County Wide Chip Seal"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

HAROLD FALAN, MEMBER BOON, MICHIGAN 49618

ALAN D. COOPER, MANAGER PHONE 231-775-9731

ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX 231-775-9732

KARL F. HANSON, P.E., COUNTY HIGHWAY ENGINEER

MARK HURLBURT, SUPERINTENDENT

_____________________________________________________________________________________________________________________________________________________________________________________________

_

WEXFORD COUNTY ROAD COMMISSION

OUR MISSION IS TO IMPROVE AND MAINTAIN A SAFE AND EFFICIENT ROAD SYSTEM

April 1, 2016

NOTICE TO BIDDERS

Sealed bids will be received at the office of the Wexford County Road Commission, 85 West Highway M-115, Boon, Michigan 49618 until 10:00 a.m. Tuesday, April 19, 2016, at which time and place the bids will be opened and read for furnishing the Wexford County Road Commission for:

County Wide Chip Seal

Plans and Specifications are available at the Road Commission office in Boon, Michigan. Telephone or faxed bids will not be accepted.

All materials and all work will be in accordance with the 2012 MDOT Standard Specifications for Construction. Insurance and bonding requirements shall be in accordance with the 2012 MDOT Standard Specifications for Construction. Award is contingent upon Board, and township approval.

The Wexford County Road Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 200d-4 Title 49, Code of Federal Regulations, Department of Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of gender, disability, race, color, or national origin in consideration for an award.

The Board reserves the right to reject any or all bids or any part of the same, to waive irregularities and/or informalities and to make the award in part or entirety in any manner deemed to be in the best interest of the Wexford County Road Commission. Contractors / suppliers that do not honor their bid through out the season may at WCRC discretion be precluded from future bid lettings.

These bids, by mutual agreement of both parties, may be extended for additional one-year periods, each year hereafter. Request for contract extensions must be in writing and received by the Road Commission prior to bidding of seasonal supplies of each year for the upcoming year.

Wexford County Road Commission

Lorne Haase, Chairman John Okoren, Vice-Chairman Harold Falan, Member

(2)

2016 County Wide Chip Seal Project

Bid Proposal

This Work Must be completed by August 18, 2016.

Project Locations:

17 Rd from Wexford Ave to 4 Rd

4 Rd (North County line Rd) from 17 Road to Blackman Road 16 Rd from Manton City Limits to 47 Rd

10 Rd from 33 Rd to Old US131

47 Rd from 16 Rd north past Reith Riley then 14 Rd to the County Line 30 Rd from Manistee County Line to M-37

48 Rd east of 13 Rd turns into 46 Rd to 21 Rd 21 Rd South of M-55

7 ½ Rd south of M-55 to 48 Rd to 48 ½ Rd to stop at M-37 39 Rd 48 Rd to 46 ½ Rd

48 Rd from 37 Rd & 39 Rd 46 Rd from 39 Rd to M-115

Locations may be added or deleted at discretion of engineer.

Description of Work:

This work involves constructing a single and or double course Chip Seal and then fog sealing.

General Log Notes:

Chip seal and fog seal full paved width. 1. HMA Approaches

The limit of chip sealing on approaches shall be the end of existing pavement, or to a painted line as directed by the engineer.

2. Work Restriction

No Work shall be allowed on Sundays or Holidays as defined by the Engineer. 3. Chip Sealing and Fog Sealing

Shall be done in accordance with special provision for Chip Seal-Modified and Fog Seal – Modified. Limits of work will be as directed by engineer on site.

4. Double Chip Seal or two courses of Chip Sealing-modified

Exact locations as directed by Engineer. Contractor will be paid for Chip Seal- Modified for additional applications as directed by engineer to perform spot double seals, seals in the wheel path, or bar seal the entire section of roadway at a specified width to prevent worse cracking. This can be performed immediately prior to application of the full application of the single course chip seal. Traffic shall be maintained at all times through this operation as well. This work will all be paid for as Chip Seal- Modified.

5. Traffic

Traffic shall be maintained at all times. 6. Chips Seal Pavement Tabs

(3)

Estimated Quantity:

Chip Seal Modified = 523,286 SYD

Fog Seal Modified = 449,821 SYD

Maintaining Traffic = LS

Insurance Requirements

Insurance: Requirements as per MDOT 2012 Standard Specifications for Construction.

The contractor shall at all times exercise extreme care and shall hold the Wexford County Road Commission its Commissioners and employees harmless and indemnified from any claims or damages. Contractors working within the road right-of-way shall have a valid proof of Auto

Liability, Worker’s Compensation and Commercial General Liability Insurance and WCRC shall be named as additionally insured. Certificates shall be on file with the Road Commission prior to the start of any work.

Alternate Bid May be accepted at discretion of the Board. Alternate Bid shall be based on the following.

CRS-2M shall be bid and applied using minimum oil application rate of 0.43 gal/syd adjusted based on Engineers Prior approval.

(4)

2016 Countywide Chip Seal Bid Proposal

All of the work herein specified will be paid for and included in the following pay items:

Items of Work Unit Quantity Unit Price Total

Chip Seal Modified = 523,286 SYD _______ ______

Fog Seal Modified = 449,821 SYD _______ ______

Maintaining Traffic = 1 LS _______ ______

TOTAL BID AMOUNT = ____________ Company Name__________________________________________________________

Address_________________________________________________________________

By (Name and Title)_______________________________________________________

Authorized Signature______________________________________________________

(5)

SPECIAL PROVISION FOR

MAINTAINING TRAFFIC

KFH / WCRC 1 of 2 4-1-16

Description:

This work shall consist of all labor, materials, and equipment required to maintain traffic as specified herein.

General:

Traffic shall be maintained in accordance with Section 103.05, 103.06, and 812 of the 2012 MDOT Standard Specifications for Construction, including any supplemental specifications, and as herein specified. All traffic control devices and their usage shall comply with the 2010 edition of the Michigan Manual of Uniform Traffic Control Devices (MMUTCD).

The Contractor shall submit a written plan for maintaining traffic prior to beginning work, and subsequent updates of the plan to the Engineer for approval prior to putting changes into effect. The information shall note the traffic control devices and their placement, the location of flag persons, and intermediate flag persons as necessary. The maximum length of a flag control sequence shall be two miles with only one flag control sequence allowed at a time. Flag persons shall be equipped with two-way radios and a warning garment that is both fluorescent orange and reflectorized. Flag persons shall be used at crossroads or other traffic generators within the lane closure as directed by the Engineer.

(6)

SPECIAL PROVISION FOR

MAINTAINING TRAFFIC

KFH / WCRC 2 of 2 4-1-16

Traffic Restrictions:

All work shall be confined to daylight hours. No work shall be permitted on Sundays, holidays, holiday weekends, or during special events. All lanes of traffic shall be open at the end of each working day. A minimum of one lane of traffic shall be maintained at all times, except where noted in the plans. Current MDOT signing sequences shall be utilized for the operation being performed. Commercial and residential driveways shall remain accessible at all times.

Measurement and Payment:

The completed work for Traffic Control, including all labor, materials, and equipment as required, shall include, but not be limited to, the following items as described in the 2012 MDOT Standard Specifications for Construction:

Flag Control

Minor Traffic Devices Sign, Type B, Temporary Lighted Arrow, Type A Sign Covers

Temporary Pavement Markings

These items will not be paid for separately, but will be included in and paid for at the unit price for the following contract pay item:

Pay Item Unit

Maintaining Traffic LSUM

References

Related documents

The Contractor shall furnish all labor, equipment, supplies, and required materials to repair and service all plumbing related equipment and items on an as needed basis, this coverage

2017 Capital Paving Scope: The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications

Under this item the Contractor shall furnish all labor, materials and equipment required to furnish and install erosion control devices in accordance with the plans and

I BELIEVE in God, the Father almighty, Creator of heaven and earth, and in Jesus Christ, His only Son, Our Lord, Who was conceived by the Holy Spirit, born of the Vir- gin

On the source server (GG_AMER_HOME terminal window), configure the change data capture extract from the GGSCI prompt by executing the edit command: (Confirm that you are in the

Furnish all labor, materials, and equipment for below grade work external to buildings as required, and furnish and install all equipment and material, including underground duct

The contractor shall furnish all pipe and materials including furnishing all labor and equipment necessary to make the connections, all required excavation, backfill, pavement

The quotes shall include the provision of all tools, materials, equipment, labour, transportation, fuel, supervision, management, overhead, materials, traffic control services,