• No results found

ALM-PLM Integration for Systems Development

N/A
N/A
Protected

Academic year: 2021

Share "ALM-PLM Integration for Systems Development"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

(1)

BOEING is a trademark of Boeing Management Company Copyright © 2014 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 1

ALM-PLM

Integration for

Systems

Development

Rob McAveney

Chief Architect

Aras Corp

(2)

Global Product Data Interoperability Summit | 2015

Increasing product complexity

Mechanical – 2D

Product

Complexity

Electrical

Mechanical – 3D

Electronic

Mechatronics

Software

SE/MBSE

Systems

Connected

Product as a

Service

(3)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 3

PLM Cross-Domain Co-Design

System/Product View

Functional Block diagram

Linked to Requirements

Engineering Domains

Software (Embedded)

Electronics (ECAD)

Mechanical (MCAD)

Product structure

Parts & BOM oriented

Drives Engineering BOM to Manufacturing BOM

Mechanical

System

(4)

Global Product Data Interoperability Summit | 2015

PLM Product Structure

MCAD – explicit

MCAD file ≈ PLM Part/Assembly (BOM)

MCAD files mapped to PLM Parts

ECAD – extractable

ECAD file

PLM Part/Assembly (BOM)

Components mapped to PLM Parts

Embedded Software – indirect

IDE files

PLM Part/Assembly (BOM)

Released binaries (builds) mapped to PLM Parts

to drive manufacturing processes

Mapping via System/Product View

Part

Assembly

Part

Electronics

Assembly

Component

Component

Software

MCAD File

MCAD File

MCAD File

ECAD Package

Build Files

(5)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 5

PLM Through-Life Support

(6)

Global Product Data Interoperability Summit | 2015

The Challenge

Integrate software development processes into the enterprise

Enable enterprise change and configuration management

Encourage collaboration between traditionally isolated groups

Link software structure to the physical item hierarchy

Promote truly interdisciplinary impact analysis

Allow for proper enterprise traceability and audit

Achieve thru lifecycle configuration control across disciplines

PLM and ALM must synchronize across the entire product lifecycle

(7)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 7

Strategic Partnership

(8)

Global Product Data Interoperability Summit | 2015

Open Services for Lifecycle Collaboration

Open standard for integration

between lifecycle systems

Aras & IBM participating in public

use case development based on OSLC

Further enhancements expected to enhance

(9)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 9

© 2015 Aras

aras.com

Implementer's Forum

• ALM-PLM Integration for Systems Engineering

• Reference architecture implementation

• Airbus partners

• IBM for ALM

• Aras for PLM

(10)

Global Product Data Interoperability Summit | 2015

OSLC Capabilities

Data and Processes

Change Management

Configuration Management

Tracked Resource Set

Product Structure

IBM Continuous Engineering & SSE

C

o

n

ti

n

u

o

u

s

V

er

if

ic

at

io

n

Unlocking Engineering Knowledge

St

rat

eg

ic

R

eu

se

Rational Team Concert

Rational DOORS Next Generation

Rational Quality Manager

Rational Rhapsody Design Manager

Rational Engineering Lifecycle Manager

Change Management

Requirements Management

Architecture Management

Configuration Management

Quality Management

Physical Product - PLM - Aras

Process: Enterprise Wide

(11)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 11

PLM Process – Goal

© 2015 Aras

11

aras.com

Process: Enterprise Wide

Physical Product - PLM - Aras

Structure, Parts, BOM, File Vault

APIs

IBM

Continuous Engineering

Processes/Practices for

System/Requirements

Aras Connectors

Tech

Pubs

Mech.

Domain

Elect.

Domain

System &

Software

Domains

IBM SSE

Solutions: Tool/Domain Specific

(12)

Global Product Data Interoperability Summit | 2015

PoC Highlights: ECO/Work Item Integration

Enterprise ECO links to Work Items in other domains

Integration between change items, lifecycles and product artifacts

OSLC maintains live links between relevant items

Aras

PLM

Product

Mechanical

Electronic

Binary File

Software

IBM

Continuous

Engineering

& SSE

Rational

Team

Concert

OSLC

ECO

Work Item

Work Item

(13)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 13

© 2013 Aras

13

aras.com

Cross-disciplinary impact analysis performed as part of the enterprise

ECO process

Discipline-specific workflows identify and share affected items

Cost and risk are analyzed based on the full enterprise impact

Aras

PLM

Product

Mechanical

Electronic

Binary File

Software

IBM

Continuous

Engineering

& SSE

Rational

Team

Concert

OSLC

ECO

Work Item

Work Item

(14)

Global Product Data Interoperability Summit | 2015

Each discipline handles its own work-in-progress data

Results are promoted to the enterprise level at relevant checkpoints

Release of engineering data is driven by the enterprise and synchronized

between disciplines

Aras

PLM

Product

Mechanical

Electronic

Binary File

Software

IBM

Continuous

Engineering

& SSE

Rational

Team

Concert

OSLC

ECO

Work Item

Work Item

(15)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 15

© 2013 Aras

15

aras.com

Discipline-specific data is uploaded to enterprise PLM

Cross-discipline collaboration is enabled

Released data are controlled at the enterprise level

Aras

PLM

Product

Mechanical

Electronic

Binary File

Software

IBM

Continuous

Engineering

& SSE

Rational

Team

Concert

OSLC

ECO

Work Item

Work Item

PoC Highlights: Work Product Upload

(16)

Global Product Data Interoperability Summit | 2015

Signoffs occur based on the system-level view

Proper traceability and audit trail are preserved

Single, authoritative data source for downstream systems/processes

Aras

PLM

Product

Mechanical

Electronic

Binary File

Software

IBM

Continuous

Engineering

& SSE

Rational

Team

Concert

OSLC

ECO

Work Item

Work Item

(17)

Global Product Data Interoperability Summit | 2015

BOEING is a trademark of Boeing Management Company Copyright © 2015 Boeing. All rights reserved. Copyright © 2014 Northrop Grumman Corporation. All rights reserved. GPDIS_2015.ppt | 17

Summary

© 2015 Aras

17

aras.com

Aras is innovating on PLM-ALM integration and processes

New approach to software/hardware processes and product structure

Leverage existing systems in place for software development

Aras/IBM have partnered to create PLM-ALM reference architecture

Enterprise-wide, cross-discipline through the lifecycle

Configuration Management, including traceability and audit trails

Using Open Services for Lifecycle Collaboration

OSLC is a standards-based integration technology

(18)

References

Related documents

The specific study will provide: (a) survey technologies based on geophysical and geotechnical methods, (b) new or upgraded equations relating physico-mechanical

 FBLA: Electronic Career Portfolio  HOSA: Prepared Speaking, Health.

The easier you make it for your customers, the more people you’re going to get on the

• It did not matter to the Court that distribution  network a small private, unlicensed network  serving only certain customers (commercial users  of electricity at

8 Three-way changeover valves Directs bilge water from the tank to the separation stage and from the separation stage either to pump for discharge overboard if it contains

This article is © Emerald Group Publishing and permission has been granted for this version to appear here (http://strathprints.strath.ac.uk/50435/). Emerald does not grant

• Whether an industry is a good candidate for rugged, rather than consumer, devices • Which applications and work scenarios a rugged device will be used for • What

During the third growing season aft er planting, Canada geese exhibited a strong feeding pref- erence for the vegetation resulting from the perennial ryegrass and white clover