TOTAL MANAGEMENT PLANNING
Strategies for Water Service
Providers
Presenters
:
Craig Teske
–
Principal Engineer (DNR)Aneurin Hughes
–
Manager, Asset Management (Cardno MBK)2.
A concept which encourages water service providers
to:-•
utilise best practice planning;
•
achieve least cost outcomes; and
•
achieve whole-of-business sustainable management
• Water Service Infrastructure in Queensland
• Queensland Water Service Providers
• What is Total Management Planning ?
• TMP Development
• Challenges in Developing the Guidelines
• Typical TMP Documentation Structure
• TMP Guideline Structure
• Features of the Guidelines
• KRA Guidelines
Total Management Planning
Guidelines (2000)
4.
Extent:-• Water-related infrastructure = $20 billion.
• $200 - $400 million new infrastructure per year.
• Urban water-related
services:-$10,000 - $15,000 per household per year.
Benefits:-• Improved living conditions
• Regional and local economic development
• Minimisation of environmental degradation
Rural Water Supply Boards
Urban Water Supply Boards SunWater
Local Governments
Joint Local Governments
Aboriginal Community Councils WSP Category
18 drainage boards
17 water supply boards (stockwater) 11 water supply boards (irrigation) 4 bore water boards
4 statutory water boards 1 (34 schemes)
125 operating over 400 water supply schemes and 250 sewerage schemes 2
14
Number/Sub-Category
6.
Need for an overall, coordinated approach to ensure: -Sustainable essential services;
Best practice to plan, design and build; Least-cost outcomes for the community.
• Asset Management Guidelines developed -1989/91
• TMP Planning Guidelines developed 1990-1993
• TMP Manual published - 1994
• DCILGPS Subsidy to develop TMPs - 1994/95
• Approved TMPs for full subsidy since 1996/7
• TMP Guidelines are now being revised & updated
8.
• TMP Manual (1994) - 2 volume document
(process-based).
• Subsidy link to TMP - an incentive
• After December 2000 - reduced subsidy if no
TMP in place.
Consultation with Local Government and rural
service providers (TMP Workshop - November 1999) Additional TMP guidelines being developed by DNR (Cardno MBK developed draft Guidelines)
DNR to finalise TMP guidelines - early 2001 (Consultation with relevant stakeholders)
Development of Guidelines –
Current Objectives
10.
• For different types of Water Service Providers
• More outcome oriented, less prescriptive and
easier to read
• More aligned with corporate objectives
• Provide methodologies for best practice and
least-cost planning processes
• Complementary to the Water Act 2000
• Integrated with other State Agency requirements
(e.g. EPA)
12. • Smart Thinking • Smart Planning • Smart Financing • Smart Investment • Smart Management
• Sustaining or Improving Services
What does Total Management Planning
Mean ?
• Diversity of WSPs
• Dispersed
• Autonomous
• Organisational sophistication, resources and
skills
Getting the balance ‘right’
14.
• Documentation Structure
• Guideline Structure
• Features of Guidelines
• KRA Guidelines
• Where to from Here?
Total Management Planning Guidelines
(2000)
Level Element Main Target Readership
1 Business Management Plan (Overview)
Elected representatives; executive management; regulators
2 Operational sub-plans, including
action plans
Operational management; regulators
3 Supporting documentation, including
procedure manuals, reports, etc Operational supervisors;technical staff
16.
BUSINESS MANAGEMENT PLAN BUSINESS MANAGEMENT PLAN
Service Standards Financial Sustainability Asset Management Ecological Sustainability Risk Management Performance Management Organisation Management & Development KEY RESULT AREAS Service Standards Plan Service Standards Plan Drinking Water Quality Management Plan Drinking Water Quality Management Plan Financial Management Plan Financial Management Plan Water Demand Management Plan Water Demand Management Plan Water Loss Management Plan Water Loss Management Plan Infrastructure Planning Overview Infrastructure Planning Overview Asset Procurement Plan Asset Procurement Plan Asset Evaluation and Renewal Plan Asset Evaluation and Renewal Plan Operations Management Plan Operations Management Plan Maintenance Management Plan Maintenance Management Plan Sewer I/I Management Plan Sewer I/I Management Plan Water Source Management Plan Water Source Management Plan Energy Management Plan Energy Management Plan Environmental Management Plan Environmental Management Plan Risk Management Plan Risk Management Plan Effluent Management Plan Effluent Management Plan Biosolids Management Plan Biosolids Management Plan Trade Waste Management Plan Trade Waste Management Plan Performance Assessment Plan Performance Assessment Plan Quality Management Plan Quality Management Plan Information Management Plan Information Management Plan Human Resources Management Plan Human Resources Management Plan Community Consultation Marketing Plan Customer Service Policy Service Level Agreements Water Supply Agreements with Major Customers
Long-term Financial Model Financial Management Practice Manual Developer Contributions Policy Infrastructure Charges Plan Pricing Policy Full Cost Pricing Strategy Metering Policy
Water Conservation Strategy Strategic Infrastructure Plan Detailed Planning Studies Capital Works Program Project Evaluation Manual Infrastructure Planning/ Design Guidelines Asset Registers Asset Valuation Reports Water Source Entitlements Water Allocations
Outsourcing Strategy O&M Manuals Telemetry Strategy
Environmental Plans under EPP (Water) Water Reuse Agreements Trade Waste Policy ERA Licenses Catchment Management Plans WAMPs Environmental Flow Management Plan On-site Treatment Risk/Hazard Assessment Critical Infrastructure Management Plan Dam Safety Counter Disaster Plans Documented Contingency Plans Insurance Policies Performance Reports Performance Monitoring Benchmarking TMP Coordinator’s Manual Quality Management Systems Organisational Structure Staffing Plan Training and Development Program WH&S Policy Commercialisation Policies TYPICAL SUB-PLANS TYPICAL SUPPORTING DOCUMENT-ATION
Typical TMP Structure
Service Standards Financial Sustainability Asset Management Ecological Sustainability Risk Management Performance Management Organisational Management Key Result Area
Customer charters/guarantees, customer interaction, community consultation, drinking water guidelines
Financial modelling, commercial objectives, tariff structures Full asset lifecycle from infrastructure planning to asset rehabilitation/disposal including demand management Environmental compliance, environmental management systems, effluent quality, effluent reuse, biosolids
management, trade waste management
Risk assessment, minimising risk exposure, risk monitoring Performance monitoring and compliance, quality
management, information management
Organisational culture, change management, staff Typical Issues Covered
18.
Variation in WSPs:
• user friendly
• easily understood by range of target
audiences
• outcome focussed but expresses State
Government requirements
• flexibility to accommodate WSP processes
• readily updateable
• TMP guideline - Overview - Detailed
• KRA Guideline - Overview
- Detailed
• Process and Content Guideline
• Development Level
20.
Develop, adopt & refine infrastructure planning policies Collect & analyse supporting information Ensure linkages with other planning activities Project manage the infrastructure planning process Undertake planning studies Prioritise infrastructure investment program Document outputs of planning studies THE INFRASTRUCTURE PLANNING PROCESS
• Issues Covered
• Purpose
• Policies that May be Required
• Other TMP Elements Intimately Linked to Sub-Plan
• External Issues Contributing to Current Operating
Environment
• What Issues Need to be Considered in
Summarising Status of Current Operations
• What Should be the Strategic Basis of the Plan
• Suggested Performance Measures
• Supporting Documentation
22.
Sub-Plan: Water Demand Management Plan
Issues Covered in Sub-Plan • Supply metering; • Water pricing; • Customer education; • Water-efficient hardware; • Irrigation efficiency;
• Water restrictions (consumption regulation);
• Supply reduction.
Purpose of Plan • To provide an overview of the WSP’s current water demand management practices.
• To outline the WSP’s future objectives and initiatives in managing water demand.
What Policies may be Required
• Pricing;
• Customer metering;
• Water use restrictions;
• Effluent reuse;
• Trade waste minimisation;
• Infrastructure service standards (re supply rates and pressures)
What Other Total Management Plan Elements are Linked Intimately to this Sub-Plan
• Infrastructure Service Standards Plan – considers supply-side service parameters (eg supply rates and pressures) which influence demands.
• Financial Management Plan – considers implications of consumption-based pricing and falling demands.
• Infrastructure Planning Overview – takes account of deferring future headworks consequent on falling demands.
• Unaccounted-for Water Plan – provides for water audits which utilise demand data, and may incorporate common strategy(ies), eg pressure reduction.
What External Issues Contributing to the Current Operating Environment Need to be Considered
• New developments in Government WaterWise program.
• Local Government Act requirements for two-part tariffs for certain urban supplies.
• Increasing encouragement of WSPs by governments to develop formal demand management programs, with some offering financial assistance on preparation and/or implementation.
• Progressive implementation of COAG pricing principles for irrigation water pricing.
• Requirements of EPP (water) for preparation of local government environmental plans on water conservation by June 2002. (This sub-plan and the Water Loss Management Plan should jointly be formulated so as also to meet these requirements.)
• Consumption data from other WSPs for benchmarking current demands.
• Efficiency improvements in irrigation practices.
• Advances in efficiency of water appliances, irrigation equipment and other hardware.
What Issues Need to be Considered in
Summarising the Status of Current Operations
• Scope of WSP’s demand management program.
• Progress on environmental plan for water conservation under EPP (water), for local government WSPs.
• Status of customer education programs, eg, WaterWise.
• Extent of customer metering.
• Water consumption trends and benchmarking results.
• Current and planned pricing practices, and effects on consumption tends.
• Promoting of water-efficient hardware, improved irrigation practices, trade waste minimisation recycling and reuse, etc.
What should be the Strategic Basis of the Plan
The strategic elements forming the basis of the plan should include: goal for asset management
objective(s) for water demand management adopted KPIs
management strategies and performance targets.
The management strategies developed will be based on the identified key strategic issues and SWOT findings, including risk assessment, in respect of water demand management, and on the required TMP development level.
Many WSPs are likely to require strategies for enhancing their customer educational and promotional programs; optimising water-pricing policies in terms of water demand and projected revenue; and minimising consumption on all WSP-owned properties.
The strategies should be supported by detailed action plans that would cover up to a 3-year period.
Suggested Performance Measures
Outcome: Infrastructure investment cost (new works): base year cost ratio
Output: Average water demand/customer
Maximum day: average day demand ratio Peak hour: average day demand ratio
Supporting Documentation These will depend on the WSP, but typically would include:
current WaterWise (or similar) water conservation program; strategic demand management reports; and
24.
• Levels 1 - 4 Based mainly on current cost of
infrastructure
Development Level
Prioritisation of Strategies/Actions
• Suggested methodology based on
• Service Standards
• Financial Sustainability
• Asset Management
• Risk Management
26. Financial Management Plan Model INPUTS
(from other TMP Sub-Plans)
• Operating revenue and expenditure
• Capital related revenue and expenditure
• Current ‘cash’ position • Asset values, depreciation • Growth projections
OUTPUTS
• Estimated impact on charges • KPIs
• Optimised infrastructure investment program
• estimated future ‘ cash’ position
Relationship Between the Financial
Management Plan and the Model
General Inputs
Current EstimatedConnectedPopulation POPULATION 2,400
Current EstimatedNoofConnections CONNECTIONS 730
Variable Inputs 0 Demographics Year 1999/2000 ProjectedPopulationGrowthRate %ChangeinGrowthinFlows ExpenditureProjections- aboveCPI Revenue ChangeinRatesandCharges ChangeinNon-CapitalGrantsandSubsidies ChangeinOtherRevenue Expenses ChangeinOperationsExpense ChangeinMaintenanceCost ChangeinManagementandAdministrationExpense ChangeinInfrastructurechargesincash ForecastChangeinDonatedassets ChangesinOtherExpenses 1 2 3 4 5 6 7 8 9 2000/2001 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 9.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% -20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% -3.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% -14.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
SHIRE COUNCIL - WATER SUPPLY
Growth and Demand Projections
28. Year1999/2000 2000/2001 2001/2002 2002/2003 OPERATINGREVENUE Water/Sewer RatesandCharges $ 714,500 $ 786,593 $ 794,459 $ 802,404 Interest Revenue $0 $0 $1,176 $1,651 Non-Capital GrantsandSubsidies $ - $ - $ - $ -Other Revenue $ 3,000 $ 2,400 $ 2,400 $ 2,400 Total OperatingRevenue $ 717,500 $ 788,993 $ 798,035 $ 806,454 OPERATINGEXPENDITURE Operations $ 362,000 $ 351,140 $ 354,651 $ 358,198 MaintenanceCost $ - $ - $ - $ -Management andAdministration $ 82,000 $ 70,520 $ 71,225 $ 71,937 Interest Expense $ 88,500 $ 61,134 $ 52,825 $ 43,550 Depreciation $ 413,840 $ 422,190 $ 439,113 $ 449,547
Other operatingexpenses (specifybywayof note) $ 17,500 $ 17,500 $ 17,500 $ 17,500
Total OperatingExpenditure $ 963,840 $ 922,484 $ 935,314 $ 940,732
OPERATINGSURPLUS/(DEFICIENCY) -$246,340 -$133,491 -$137,279 -$134,278
CAPITALRELATEDREVENUE
Capital Grants andSubsidies $ - $ 333,480 $ 616,850 $ 272,000
Developer Contributions (Infrastructurecharges) $ - $ - $ - $
-Donatedassets $ - $ - $ - $
-Funds fromDisposal of Noncurrent assets $ - $ - $ - $
-Total Capital relatedRevenue $ - $ 333,480 $ 616,850 $ 272,000
CAPITALRELATEDEXPENSE
Capital relatedexpense $ - $ - $ - $
-Abnormal andExtraordinaryItems $ - $ - $ - $
-Total Capital RelatedExpense $ - $ - $ - $
-TOTALOPERATINGSURPLUS/(DEFICIENCY) -$246,340 $199,989 $479,571 $137,722 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010 810,428 $ $ 818,532 $ 826,717 $ 834,984 $ 843,334 $ 851,768 $ 860,285 $3,934 $6,456 $9,105 $11,282 $17,734 $24,391 $31,581 -$ $ - $ - $ - $ - $ - $ -2,400 $ $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 2,400 816,761 $ $ 827,388 $ 838,222 $ 848,667 $ 863,468 $ 878,559 $ 894,266 361,780 $ $ 365,398 $ 369,052 $ 372,742 $ 376,470 $ 380,234 $ 384,037 -$ $ - $ - $ - $ - $ - $ -72,657 $ $ 73,383 $ 74,117 $ 74,858 $ 75,607 $ 76,363 $ 77,127 33,198 $ $ 21,644 $ 8,748 $ - $ - $ - $ -453,214 $ $ 453,214 $ 455,714 $ 460,089 $ 460,089 $ 460,089 $ 460,089 17,500 $ $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 17,500 938,348 $ $ 931,138 $ 925,130 $ 925,189 $ 929,665 $ 934,186 $ 938,752 -$121,587 -$103,750 -$86,908 -$76,522 -$66,197 -$55,627 -$44,486 160,000 $ $ 160,000 $ 280,000 $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -160,000 $ $ 160,000 $ 280,000 $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -$ $ - $ - $ - $ - $ - $ -$38,413 $56,250 $193,092 -$76,522 -$66,197 -$55,627 -$44,486
SHIRE COUNCIL - WATER SUPPLY
Operating Statement
Operating Surplus -$300,000 -$250,000 -$200,000 -$150,000 -$100,000 -$50,000 $0 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 2009 /201 0 Year $
Charge per Connection
$-$100.00 $200.00 $300.00 $400.00 $500.00 $600.00 $700.00 $800.00 $900.00 $1,000.00 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 Year $ Return on Equity -2.0% -1.8% -1.6% -1.4% -1.2% -1.0% -0.8% -0.6% -0.4% -0.2% 0.0% 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 Year $
Infrastructure Investment Profile
$-$100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 $900,000 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 2009 /201 0 Year $
New Capital Works Repl. Cap Wrks
Debt -$100,000 $-$100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 2009 /201 0 Year $ Reserves -$200,000 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 $1,800,000 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 2009 /201 0 Year $
Cash Movement (Closing Cash Bal)
$1,000,000 $1,500,000 $2,000,000 $2,500,000 $ Return on Assets -0.8% -0.6% -0.4% -0.2% 0.0% 1999 /200 0 2000 /200 1 2001 /200 2 2002 /200 3 2003 /200 4 2004 /200 5 2005 /200 6 2006 /200 7 2007 /200 8 2008 /200 9 $
Reserves to Accumulated Depreciation
$6,000,000 $8,000,000 $10,000,000 $12,000,000
$
SHIRE COUNCIL - WATER SUPPLY
Graphs
30. General Checklist
HAVE YOU?
Automatic Check 1 - CASHFLOW
Are Cashflows Positive (Y/N) YES
Automatic Check 2 - BALANCE SHEET
Does the Balance Sheet Balance? YES
Does the Business Grow over time? YES
Automatic Check 3 - OPERATING SURPLUS
Does the Business Provide a return on funds invested? NO
Automatic Check 4 - CAPITAL FUNDING
Does the Capital Funding Sheet Balance? YES
Identified Key Constraints?
g f e d c b
Completed the Growth/Demand Projections?
g f e d c b
Calculated & Entered Depreciaton and Replacement Cap X data?
g f e d c b
Entered Base Yr Ops Revenue and Expense data?
g f e d c b
Completed New Cap X Budget
g f e d c b
SHIRE COUNCIL - WATER SUPPLY
Check Sheet
Dispose of Assets and De-register Customer and Business Requirements Man age Dem and Ma nag e D em and Operate Assets Procure Assets Maintain Assets Renew Assets Set or Review Service Levels Plan for Asset and Non-Asset Solutions Evaluate Asset Condition
and Performance Register and Value Assets Construct Asset Design Asset Optimise Infrastructure Investment (Capital Works) Program Plan at a Detailed Level Plan Strategically Replace or Rehabilitate Assets Modify Assets or Confirm Need for Assets Optimise Asset Maintenance/ Rehabilitation/ Replacement Manage Demand
32. Service Standards Service Standards Asset/system performance. Financial Sustainability Financial Sustainability Ecological Sustainability Ecological Sustainability Risk Management Risk Management Performance Assessment Performance Assessment Organisation M anagement & Development Organisation Management & Development Asset M anagement Asset Management
Service standards/levels will drive investment in new/replacement assets and O&M strategies. Infrastructure investment (new/replacement) costs,
O&M costs, depreciation, renewals annuity. Financial targets to be achieved.
Infrastructure investment to meet environmental requirements. Ecologically sustainability of O&M practices.
Minimisation of water demands, energy and sewer overflows.
Infrastructure extent, condition and performance.
Infrastructure and service delivery related risks.
Asset related information
Asset/system performance and condition
Human resource requirements processes/procedures. Human resources. Business Management Plan Business Management Plan Strategic Direction.
Benchmarking and performance comparison Information management systems. Quality management systems.
Relationship
Between Asset
Management
and Other Key
Result Areas
Establish context Establish context Identify risks Identify risks Analyse risks Analyse risks Evaluate risks Evaluate risks Define risk treatment strategies/controls Define risk treatment strategies/controls Assess risks Determine tentative scope of TMPDetermine tentative scope of TMP
Collate and analyse informationCollate and analyse information
Confirm scope of TMPConfirm scope of TMP
Prepare draft TMPPrepare draft TMP Prioritised strategies andcontrols for inclusion in relevant sub-plans Collected information (eg SWOT analysis) as basis for summary risk treatment schedule TMP Development Process
(based on Reference 3)
Simplified Risk Management Process (based on Reference 1)
Integration of Risk Management and TMP
Development Processes
34.
1. Councils are adopting a more rigorous
infrastructure investment decision making
processes, with non-asset based solutions, full
lifecycle costs, risks and various alternatives being considered before deciding to construct
infrastructure;
2. Need to optimise the performance and utilisation of existing infrastructure;
3. Need to ensure that infrastructure can sustain agreed customer service standards; and
4. Recognition that asset management is a core
36.
The current TMP review process provides for approval as part of the TMP by DNR of Councils Environmental Management Plans for water and sewerage services required under the EPP (Water). The EMP would cover Sewer Inflow Infiltration,
Demand Management, Trade Waste and Stormwater Management Plans. Material is currently being
developed and negotiations are under way with EPA regarding how this will be put in place.
A major part of the TMP is related to performance and improvement. The Performance Monitoring and
Benchmarking (PM&B) process managed by DNR will provide not only the basis for the relevant sections of the TMP guidelines, but will provide the basic system and data for a Council developing a TMP for those
Councils participating in the process.
Similarly, much of the data utilised in the PM&B process will also be used when Service Providers develop Standards of Service required under the
Links to Performance Monitoring &
Benchmarking
38.
The TMP includes sub-plans for addressing other areas relating to best practice water use such as :
• Demand Management – to manage and minimise
water consumption and ensure it is included in future water demand planning as an option
• Unaccounted for water – to manage and reduce water
loss
• Water Source Management – to monitor and manage
water sources and catchments
• Energy Management – to make best use reduce costs
associated with power use
Links to Water Use Efficiency and
Conservation
The Water Act 2000 requires the preparation of a Strategic Asset Management Plan (SAMP). A full
TMP will cover virtually all of the requirements of a SAMP. Hence, although a different approval
process, a SAMP will require minimal extra work, reducing administrative duplication and the impact of compliance with the Act.
The new TMP guidelines are thus being developed in conjunction with SAMP guidelines under the Act.
40.
Key Result Areas and Sub Plans
EPP (Water) SAMP’s Under Water Act Possible WQMP Health Dept Corporate/Business Plan
Water Service Provider TMP
PM&B
KEY RESULT AREAS TYPICAL SUB - PLANS TYPICAL SUPPORTING DOCUMENTATION Service Standards Sustainability Financial Management Asset Sustainability Ecological Management Risk Management Performance TOTAL MANAGEMENT PLAN
Model Long-term Financial Metering Policy Management Financial Practice Manual Pricing Policy Major Customers Agreements with Water Supply Strategy Detailed Planning Water Conservation Infrastructure Planning / Design Guidelines WAMP's ERA Licenses Water Re-use under EPP (Water) Environmental Plans Catchment Management Plans Environmental Flow Management Plan On-site Treatment Agreements Service Level Strategy Full Cost Pricing
Counter Disaster Dam Safety Risk / Hazard Assessment Critical Infrastructure Management Plan Plans Insurance Policies Reports Performance Benchmarking Community Consultation Marketing Plan Customer Service Policy Studies Capital Works Documented Contingency Plans Monitoring Performance Agreements Charges Plan Infrastructure Strategic Infrastructure Plan
Trade Water Policy
Drinking Water Quality Management Plan Plan Service Standards Plan Financial Management Plan Management
Water Demand Unaccounted -for Water Plan
Infrastructure Overview
Planning ProcurementAsset
Plan Management Operations Renewal Plan Evaluation and Asset Sewer I/I Management Plan Maintenance Management Plan Water Source Management Plan Biosolids Management Management Trade Waste Effluent Management Management Plan Environmental Plan Management Information Plan Management Quality Management Plan Risk Assessment Plan Performance Energy Management Plan Plan Plan Plan Plan Contributions Developer Policy Asset Registers Asset Valuation Reports Water Source Program Entitlements Water Allocations Strategy Telemetry Strategy Outsourcing O & M Manuals Quality Management Systems TMP Coordinator's Manual
TMP/SAMP Relationship
42.
TMP’s are becoming more holistic in the
application and will provide:
• A tool to plan and manage water and
sewerage infrastructure in a manner that
provides the best outcomes for their customers
• A system for integrating different water
management mechanisms into the overall
planning process and ensuring all aspects of
water planning is linked
• A mechanism that will provide concurrent
approval with legislative requirements of other
Departments and the
Water Act 2000
.
• A system to ensure all parts of the water based
infrastructure systems are planned in the most
efficient, balanced manner with strong links
between financial and technical issues.
• An ongoing plan to ensure water schemes are
sustainable both financially and operationally.
44.