07.02.2012 Seite 1

Mansour Assani D.

GIZ/PERACOD

Regulatory and Technical Issues in

Operating Hybrid Mini-Grids"

(2)

07.02.2012 Seite 2 Seite 2

Regulation Issue

Regulation should have several aim ::

 The first of these should be sustainability : the regulated company must be able to finance its operations, und any required investment

 The second aim ist to protect the consummers in Senegal Revenue-yield control is performed

Determining the yield-revenu , the Regulator need severals informations like investment cost and operatings costs

 The tariff system required for rural electrification should be in line with the low ability to pay of users, investment and the

operation should be masters

 This presentation tries to show from the perspective of

developers how to plan and ensure the operation of equipment for rural electrification based on the case of hybrid mini-grids

(3)

07.02.2012 Seite 3 Seite 3

Peracod had installed 16 DC-Coupling Hybryd mini-grid

07.02.2012

Equipment Cost

PV-Module/Support ( 5 kWp) 10500 €

Batteries( Electrolyte and support)

48 kWh 5125€ Charge Controller 900 € Battery-Inverter 5 kVA 2120 € Mini-Grid [2 km] 14200 € Distribution Box 600 € Technical Building 6000 €

Diesel Generator ( 15kVA) 6500 €

(4)

07.02.2012 Seite 4 Seite 4

70 Hybrid mini -Grids to be installed before .

Equipment Cost [€]

PV-Module/Support ( 5 kWp) 9300

Batteries( Electrolyte and support) 48 kWh 6200 Grid-Inverter 5kW 1600 Battery-Inverter 5 kVA 2300 Mini-Grid [2 km] 14200 Distribution Box 1400 Technical Building 7000

Diesel Generator ( 15kVA) 5000

CAPEX [€] 46.600 07.02.2012 17% 11% 22% 31% 11% 9% PV solaire de 5 kW ., supports

Batterie acide de plomb 48 kWh

onduleurs réseaux et batterie Sunny Island SMA

1.5 km réseau de distribution 400 V

Génie civil (locale technique, fondations, clôture)

(5)

07.02.2012 Seite 5 Seite 5

In Cooperation with INENSUS

aérogénérateur 5 kW 13 561 PV solaire de 5 kW ., supports 9300 Batterie acide de plomb 48 kWh 6200 onduleurs réseaux et batterie Sunny Island

SMA

11800 1.5 km réseau de distribution 400 V 14200 Génie civil (locale technique, fondations,

clôture)

9500 Boîte de distribution et protection 1885 Groupe électrogène diesel de 15 kVA 5000 71466 07.02.2012 19% 13% 9% 17% 20% 13% 7% aérogénérateur 5 kW PV solaire de 5 kW ., supports

Batterie acide de plomb 48 kWh

onduleurs réseaux et batterie Sunny Island SMA

1.5 km réseau de distribution 400 V

(6)

07.02.2012 Seite 6 Seite 6 07.02.2012

(7)

07.02.2012 Seite 7 Seite 7

Rural electrification should be based on thorough socio-economic

studies

Dépenses énergétiques mensuelles Substituables

Comparaison Dépenses actuelles et Disponibilités à payer un tarif mensuel Zone : Mbour-RBDS

Enquête Semis-Transénergie Octobre 2002

y = -6605,9Ln(x) + 354,3 R2 = 0,9551 y = -8417,8Ln(x) + 2073,8 R2 = 0,9025 y = -8417,8Ln(x) + 2073,8 R2 = 0,9025 0 CFA 5 000 CFA 10 000 CFA 15 000 CFA 20 000 CFA 25 000 CFA 30 000 CFA 35 000 CFA 40 000 CFA 45 000 CFA 50 000 CFA 55 000 CFA 60 000 CFA 65 000 CFA 70 000 CFA 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Pourcentage de ménages - dépenses mensuelles décroissantes

dépenses mensuelle Mbour - Zone de Biosphère du Delta du Saloum (Emhr_078Ecl&ComTotDepMens) disponibilité à payer un tarif mensuel (Emhr_080TarifAcceptable1) Logarithmique (dépenses mensuelle Mbour - Zone de Biosphère du Delta du Saloum

(Emhr_078Ecl&ComTotDepMens)) Logarithmique (disponibilité à payer un tarif mensuel

(Emhr_080TarifAcceptable1))

15% 15% 37% 32%

market segmentation to produce

an estimate of the size of this market to be served by each type of service selected

measurement of current energy expenditure and arrangements for payment give us twor references,

one conservative (energy expenditure),

the other more optimistic (reports of willingness to pay)

 Investigations must be conducted to establish a thematic database regarding the target user

Substutuable energy expendure Ie = - a. Ln(Σ%) + b

(Σ%) : the cumulative percentage of households classified according to the criteria of decreasing costs

Ln : natural logarythm

representation of Substutuable energy expendure and the segmentation

(8)

07.02.2012 Seite 8 Seite 8

optimum connection rate depends on two factors: the ability

and willingness to pay

0% 20% 40% 60% 80% 100% 120% 140% 160% 0 1000 2000 3000 4000 5000 6000 7000 8000 0 1000 2000 3000 4000 5000 6000 T aux r ac c or dem ent R ev enus / N b. t ot al de m énages

Tarif service de Niveau 1

FCFA/mois

there is a range of optimum rate of connexion that maximizes the revenue of the operator.

the Turnover corresponding to a rate of connection x is expressed as follows

CA= X.DAP(x) = x ( -a LN(x) + b)

CA ; Turnover

X : rate of connexion

DAP : willingness to pay

Turnover

(9)

07.02.2012 Seite 9 Seite 9

Breaking the barriers to accessing electricity services

The great handicap surrounding access to electrical services is the payment of an access fee. The new user must not only pay for the rights of access but also cover the initial installation of indoor equipment.

 A system has therefore been put in place to overcome this barrier.

The initial payment of access is paid either at once or in several instalments before connecting the user.

 The indoor equipment is pre-financed and reimbursed through the monthly fees.

0 5 10 15 20 25 30 35 40 45 50 nbre usagers prévus usagers mise en service

service1 Service 2 service3 service4

Access charge

18 € 34€ 60€ 100€

Indoor

Installation 144€ 180€ 350€ 453€

From its first year of operation, this system can achieve 80% of the connection rate identified in the initial studies

(10)

07.02.2012 Seite 10 Seite 10

Mini-grid cost reduction

 mono-phase architecture using interface mono/three-phase for three-phase equipment

 implementing grids with two conducting wires

 if a three-phase grid is necessary, adapt the grid architecture to the topography of the village

07.02.2012

Mini-grid length simplifying cable structure

the use of conductors 35 and 16 mm ² instead of 70mm ² can be reduced by € 2,875 or 25%

simplify poles

the use of poles 8 m

compared to 12 m can induce a reduction in the cost per km up to € 2,500 or 30%

Cost reduction can thus be achieved through

:

0 2,000 4,000 6,000 8,000 10,000 12,000 C o s t p e r k m o f g ri d conductor section 0% 10% 20% 30% 40% 50% 60% 1 1.5 2 2.5 3 3.5 4 4.5 5 sh ar e o f g ri d /sy st em co st mini-grid lenght 0 2,000 4,000 6,000 8,000 10,000 12 m 9 m 8 m co st o f km 35/ 16m m ²

(11)

07.02.2012 Seite 11 Seite 11

Implement an appropriate pricing system

 The traditional charging system using individual meters has shown its limits because it requires significant management fees as well as recovery levels lower than forecast.

 The tariff system in place in Senegal by service level’. This price includes two components :

 The energy component linked to the energy service provided

 The non-energy component corresponding to reimbursement of indoor installation

Service level S1 S2 S3 S4

Power < 50W 50 <S2<90 90W<S3<180W S4> 180 W

energy component Fees per month

3,57 € 6,58 € 12,34 € 0,18 €/kWh

non-energy component Fees per month

0,81€ 0,97€ 1,62 € 1,77 €

(12)

07.02.2012 Seite 12 Seite 12

Manage demand to optimize supply

 Energy efficiency and control are the foundations on which every rural electrification project should be built.

 For each type of user, the service provided must match their financial demands and thus their ability to pay

 A rigorous management of demand allows for a better control of the initial investments related to the implementation of the supply

 Demand management also helps to extend the deadline for strengthening production capacity

 demand management allows the user to handle the payment for a real service and therefore provides better cost-effectiveness of the service contract.

 Pricing is by fixed rate contracts and so requires careful management of the energy used .

(13)

07.02.2012 Seite 13 Seite 13

Quality of service standards for customers

 Service quality is stipulated in the concession contract, but also in the contract between operator and end user. It concerns the following elements:

 provide electricity according to the quality standards laid out in the le règlement des abonnements

 Nominal frequency is 50 Hertz. During the first five years of the concession, a deviation of ± 5% is permitted during normal

operation.

 Voltage between phase and neutral is 220 Volt and 380 Volt between phases. A variation of ± 11% is permitted.

 If a client suspects that voltage variations exceed the authorized levels, the concessionaire has to explain the problems and the steps taken to resolve them within ten working days of the first contact.

 The concessionaire has to deliver electricity during the aforementioned hours of the day. Electricity service can be temporarily suspended for

 maintenance of works and equipment  repairs of works and equipment

References

Related documents

innovation in payment systems, in particular the infrastructure used to operate payment systems, in the interests of service-users 3.. to ensure that payment systems

The purpose of this study was to evaluate the rela- tive performance of 26 public urban transportation organizations in India using various criteria.. We grouped these 19 criteria

The term “certification authority” is used in this International Standard to reflect the aggregate of the following PKI roles specified above, including: certificate

The overall purpose of this study was to examine teacher perceptions of their professional training to teach students with autism spectrum disorder and the relationships

calcium is removed by SERCA ten times more effectively than by NCX [198]. Of note, NCX function is dependent not only on its expression, but also on local Na + and Ca

Rule sets are collections of rules you want to enforce on a specific UNIX agent computer or a group of UNIX agent computers. You can create rule sets that are specific to the

In addition, both the social/personality measures (i.e., academic self-efficacy, academic locus of control, test anxiety and performance-avoidance goals) and

Since Heuber’s 1984 article on Group Decision Support Systems (GDSS) the concept of GDSS has been researched by over 40 authors (Eom, 1999), yet the system itself has had