• No results found

NXDN. NXDN Technical Specifications. Part 2: Conformance Test. Sub-part D: Trunking Operation Test (Type-C) NXDN TS 2-D Version 1.1.

N/A
N/A
Protected

Academic year: 2021

Share "NXDN. NXDN Technical Specifications. Part 2: Conformance Test. Sub-part D: Trunking Operation Test (Type-C) NXDN TS 2-D Version 1.1."

Copied!
99
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 5.1-1    VCALL_REQ Message for SU
Table 5.1-3    VCALL_ASSGN Message for Interoperability Tester
Table 5.1-6    DISC Message for Interoperability Tester
Table 5.1-7  VCALL_REC_REQ Message for Interoperability Tester
+7

References

Related documents

In analogue mode, press PROG/CH +/– , or the number buttons, to select the video channel~. For other

Do not walk into or touch spilled substances and avoid inhalation of fumes, smoke, dusts and vapours by staying up windRemove any contaminated clothing and

In view of the present satisfactory level of computerisation in commercial bank branches, it is proposed that, ‘‘payment of interest on savings bank accounts by scheduled

- Habitat for Humanity International – Provided computer support for the direct mail, telemarketing, major donor, matching gift, and special event fundraising programs -

(a) in respect of any of the securities of the responsible issuer that the person or company subsequently disposed of on or before the 10th trading day after the public correction

No.3 IP Fixed Mobile All-IP based FMC Single Platform Box Module Site or Central Office One Cabinet One Site 9KW 3×3KW Smart modularized power management 2KW

  ParEEoning    Manager spreads namespace across Owners by assigning leases    Consistency   

• Our goal is to make Pittsburgh Public Schools First Choice by offering a portfolio of quality school options that promote high student achievement in the most equitable and