• No results found

Development of an Automatic Switch-off Household Loads by Visitor Counter

N/A
N/A
Protected

Academic year: 2020

Share "Development of an Automatic Switch-off Household Loads by Visitor Counter"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 Block Diagram of automatic switching off of electrical loads
Fig. 2 Detailed Block Diagram and working principle of automatic switching off of household electrical loads
Fig. 4 In stage 1, the portion of circuit diagram which has been implemented
Fig. 5 The replacement of D flip-flop by JK flip-flop
+3

References

Related documents

MS multiple sclerosis, PPMS primary progressive multiple sclerosis, SPMS secondary progressive multiple sclerosis, RRMS relapsing-remitting multiple sclerosis, RRMS ( r

The implementation aims the reduction of project costs, use of free software, in addition to enabling the use of Raspberry hardware with Internet Protocol (IP) for outgoing

Tämän diplomityön tarkoituksena on selvittää, kuinka hyvin MVP -malli soveltuu kette- rän IoT -ohjelmistoprojektin käyttäjäkokemuksen suunnitteluun sekä mitkä ovat MVP - mallin

placement and requiring intervention [second tube or VATS]). Each chest tube complication must have oc- curred after the placement of the chest tube. The second- ary outcomes

The last x-ray of left lower limb after the third surgery revealed minimal amorphous ossification of the soft tissue at the inner aspect of the left thigh, left leg,

Allow enough space for participants to write when using open-ended questions?. Use graphics or icons, if possible, to increase your

defaulting sovereigns. 153 In 2001, Argentina defaulted on more than $80 billion in external debt, then the largest sovereign debt default in history. 154 Argentina