• No results found

Very short term load forecasting of peak load time using Fuzzy type 2 and big bang big crunch (BBBC) algorithm

N/A
N/A
Protected

Academic year: 2020

Share "Very short term load forecasting of peak load time using Fuzzy type 2 and big bang big crunch (BBBC) algorithm"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table-6. Comparative value of 2017 forecasting and actual load expenses using FT-2-BBBC

References

Related documents

Microsoft Excel has created a single source of data the can be used during the planning of the event and Microsoft Access has created a database that can be used during the

The ON resistance for these geometries for the two types of devices (RON-P and RON-N) has been calculated to be 7.875 k Ω and 3.75 k Ω respectively based on experimental work

Key Words and Phrases: Deconvolution, density estimation, mean squared error, measurement error, rates of convergence, uniform convergence.. 1 Work supported by NSF

There are infinitely many principles of justice (conclusion). 24 “These, Socrates, said Parmenides, are a few, and only a few of the difficulties in which we are involved if

The strategic management literature studies the creation of a competitive advantage and provides a background why farms differ in strategy and performance.. In this brief descrip-

For the specimen with high MC before compression, the fact that the impregnation of Chinese fir increased more sharply (big in amount and short in time) than poplar did (Fig.  1

For example, [21] has offered a two-stage approach in which in the first phase, a new feature descriptor called maximum entropy feature descriptor (MEFD) is used

Over 80 percent of LHDs that maintain program data in an electronic database have some capacity to exchange data electronically with relevant state agencies (sending, receiving,