BIM lab

A Knowledge Center for Building Information Modelling

Jacob Steen Møller, PhD, Director Department of Civil Engineering Technical University of Denmark

(2)

BYG DTUBYG DTU De

p

a

rt

ment

BIM in Denmark

• State of the art, BIM in Denmark:

Jan. 1, 2007

: ‘

Digital Construction’s Clients Demands states that governmental projects > 40 M. DKK. shall be exercised in a reduced BIM concept

– Several companies (especially consulting firms) have made a strategic plan for using BIM working methods in the future. They have already experiences in the field, ex. Ramboll/Henning

Larsen congress Center in Reykjavik

– The majority of firms are still working in a traditional working method based on 2D drawing and document.

– However the development is going fast towards a 3D object-oriented working methods

(3)
(4)

BYG DTUBYG DTU De p a rt ment o f C

(5)

• A project focusing on:

– Actual realization of integrated modelling – Identify critical development tasks

– Inspire research and development

• Relation to ’Digital Construction’, implementation network:

– Public Clients Demands

– The Digital Foundation, industry standard

• Activities:

– Establishing a Center – Software and hardware – Making Building Models

– Testing Building Models and Simulations – Education and Training

(6)

BYG DTUBYG DTU De

p

a

rt

(7)

• Contribute to the national and international goal

to get more experience in working with building

models in all phases of the building process.

• The project is dealing with the problem: General

specifications (ex. DDB’s Clients demands)

versus practical implementation in actual

software and working methods.

(8)

BYG DTUBYG DTU De

p

a

rt

ment

BIM lab

• Location

– BYG●DTU, bygning 118, Lyngby

– Publishing on the internet, link from Digital Constructions homepage: www.detdigitalebyggeri.dk

• Education

– BSc/BEng and MSc in Civil and Architectural Engineering – Ph.D. projects

(9)

• Topics of priority

– Lack of good examples

– Lack of building models to manipulate in the education – Lack of general view of the functionality of the ICT tools

– To little focus on integration, especially the integration between building models and specialized simulation tools

– Lack of more detailed working methods in relation to the technological possibilities

(10)

BYG DTUBYG DTU De

p

a

rt

ment

BIM lab

• State of affairs

– The physical center established – Hardware installed

– Standard DTU and most of BIM Ex. software installed

– Dialog with the Building sector about delivering building models

(11)

• Resources BYG•DTU:

– Jan Karlshøj: Project leader, external professor – Flemming Vestergaard: ass. professor

– Hans Peter Nielsen: ass. professor – Niels Treldal: Student

• Other partners:

– Rambøll

– Ørsted DTU, Acoustic Technology

• Sponsors

DTU

(12)

BYG DTUBYG DTU De

p

a

rt

ment

BIM lab

Plan for Implementation

2007 apr maj juni juli aug sep okt nov dec

Developing the concept Dialog w ith IT/DTU, other Dialog w ith SW lev.

Implementation stage 1 Tests Documentation Implementation stage 2 Education materials A Documentation

Education materials, other Dialog w ith other disciplins

The time schedule is marking the 1. stage of the BIM experimentarium.

(13)
(14)

BYG DTUBYG DTU De p a rt ment

2006

url adresse: http://bimhouse.dk

(15)
(16)

BYG DTUBYG DTU De

p

a

rt

ment

(17)

Ny tegning!

Infoniveau 1 Infoniveau 2

(18)

BYG DTUBYG DTU De

p

a

rt

(19)
(20)

BYG DTUBYG DTU De p a rt ment Ny tegning!

(21)

To tværsnit genereret fra en samling af fagmodeller for arkitekt og konstruktion via ADT

(22)

BYG DTUBYG DTU De

p

a

rt

ment

References

Related documents

This paper explores the use of hyperspectral imagery for agricultural management in drought scenarios with the following two goals: (1) to study the accuracy to which we

10 Using Multiple Regression to Forecast Sales 177 Introducing Multiple Linear Regression 178. Running a Regression with the Data Analysis Add-In 179 Interpreting the

Coelho, “Technology Audit performed to the Company Jorge Honório da Silva & Filhos, Lda” (in Portuguese), IPT, Tomar 2006. Coelho, “Technology Audit performed to the Company

solution is much less complex than other solutions evaluated in this Forrester Wave. It has outstanding support for user directory configuration and integration, access management

For instance, a different choice of identifiability constraints could be used to impose that the period parameters, κ t, had no linear trend, which would give the param- eters

This article evaluates whether private prosecutions remain a safe and useful mechanism in the modern New Zealand criminal justice system.. Private prosecutions are an

Based on the results obtained, we can conclude that the traffic shape for the Gnutella protocol is self-similar in the area of lower m for all message types.. Indeed, the

There is already a considerable amount of work within Biological Physics regarding the concept of entropy in biological systems (e.g., Udgaonkar 2001), but we will try to give