BIM lab
A Knowledge Center for Building Information Modelling
Jacob Steen Møller, PhD, Director Department of Civil Engineering Technical University of Denmark
BYG DTUBYG DTU De
p
a
rt
ment
BIM in Denmark
• State of the art, BIM in Denmark:
–
Jan. 1, 2007
: ‘
Digital Construction’s Clients Demands states that governmental projects > 40 M. DKK. shall be exercised in a reduced BIM concept– Several companies (especially consulting firms) have made a strategic plan for using BIM working methods in the future. They have already experiences in the field, ex. Ramboll/Henning
Larsen congress Center in Reykjavik
– The majority of firms are still working in a traditional working method based on 2D drawing and document.
– However the development is going fast towards a 3D object-oriented working methods
BYG DTUBYG DTU De p a rt ment o f C
• A project focusing on:
– Actual realization of integrated modelling – Identify critical development tasks
– Inspire research and development
• Relation to ’Digital Construction’, implementation network:
– Public Clients Demands
– The Digital Foundation, industry standard
• Activities:
– Establishing a Center – Software and hardware – Making Building Models
– Testing Building Models and Simulations – Education and Training
BYG DTUBYG DTU De
p
a
rt
• Contribute to the national and international goal
to get more experience in working with building
models in all phases of the building process.
• The project is dealing with the problem: General
specifications (ex. DDB’s Clients demands)
versus practical implementation in actual
software and working methods.
BYG DTUBYG DTU De
p
a
rt
ment
BIM lab
• Location
– BYG●DTU, bygning 118, Lyngby
– Publishing on the internet, link from Digital Constructions homepage: www.detdigitalebyggeri.dk
• Education
– BSc/BEng and MSc in Civil and Architectural Engineering – Ph.D. projects
• Topics of priority
– Lack of good examples
– Lack of building models to manipulate in the education – Lack of general view of the functionality of the ICT tools
– To little focus on integration, especially the integration between building models and specialized simulation tools
– Lack of more detailed working methods in relation to the technological possibilities
BYG DTUBYG DTU De
p
a
rt
ment
BIM lab
• State of affairs
– The physical center established – Hardware installed
– Standard DTU and most of BIM Ex. software installed
– Dialog with the Building sector about delivering building models
• Resources BYG•DTU:
– Jan Karlshøj: Project leader, external professor – Flemming Vestergaard: ass. professor
– Hans Peter Nielsen: ass. professor – Niels Treldal: Student
• Other partners:
– Rambøll
– Ørsted DTU, Acoustic Technology
• Sponsors
DTU
BYG DTUBYG DTU De
p
a
rt
ment
BIM lab
Plan for Implementation
2007 apr maj juni juli aug sep okt nov dec
Developing the concept Dialog w ith IT/DTU, other Dialog w ith SW lev.
Implementation stage 1 Tests Documentation Implementation stage 2 Education materials A Documentation
Education materials, other Dialog w ith other disciplins
The time schedule is marking the 1. stage of the BIM experimentarium.
BYG DTUBYG DTU De p a rt ment
2006
url adresse: http://bimhouse.dkBYG DTUBYG DTU De
p
a
rt
ment
Ny tegning!
Infoniveau 1 Infoniveau 2
BYG DTUBYG DTU De
p
a
rt
BYG DTUBYG DTU De p a rt ment Ny tegning!
To tværsnit genereret fra en samling af fagmodeller for arkitekt og konstruktion via ADT
BYG DTUBYG DTU De
p
a
rt
ment