An examination of clients and project teams developing information requirements for the Asset Information Model (AIM)

N/A
N/A
Protected

Academic year: 2020

Share "An examination of clients and project teams developing information requirements for the Asset Information Model (AIM)"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Relating PAS 1192-2:2013 and PAS 1192-3:2014 [26].
Table 1:  Profiles of the 10 interview participants.

References

Related documents

Therefore, the frost susceptibility of a soil must be assessed together with environmental conditions such as overburden pressure, temperature gradient, cooling rate and depth

Rapidly changing technology drive periodic application reengineering but the business customer remain with the organization .Clean, consolidated and accurate master

bacteria. The percentage of leaves lost by the plants during their development was monitored in both groups. The results are shown in the bar chart. The group marked F-B+ had

DeGaetano, Certified Colossus Consultant, Personal Injury Institute , Lewisville, Texas Steven M.. Gursten, Attorney, Michigan Auto Law , Farmington

Personal leave days that are not used by a technical-clerical employee during a school year (or qualifying twelve-month anniversary period) shall continue to

Related to the previous finding, the result of this study showed that using portfolio assessment improved students’ overall writing ability in terms of five important

MiRNAs might be potent candidates since we demonstrated a differential expression of miRNAs in high-grade serous tubal cancer compared to normal epithelium in BRCA1

Use Disable multiple check out / enable Get Latest Version if team members can check-in the project file each time they add new items, otherwise other team members will not able