A.P.I PIPELINE CONSTRUCTION CO. LTD TO PERFORM NDT ON 2 WELD JOINTS-2'' DYE PENETRANT A.P.I PIPELINE CONSTRUCTION CO. LTD TO CARRY OUT MPI ON PAD EYES

AMBER ENERGY SOLUTIONS FOURTEEN (14) CONTAINERS TO BE RECERTIFIED, CONTAINERS TO BE COLLECTED AND RETURNED TO NATIONAL GAS COMPANY WAREHOUSE, MINIMUM OF FIVE (5) CONTAINERS PER DAY AMBER ENERGY SOLUTIONS TO CARRY OUT RADIOGRAPHIC TESTING ON TZZ 101 DISCHARGE PIPING

AMBER ENERGY SOLUTIONS WELD & FABRICATING OF 6 BUTT WELDS STAINLESS STEEL, RADIOGRAPHIC TESTING & PENATRANT TESTING, WELDING AND FABRICATION OF BUTT WELD INCLUDING

AMBER ENERGY SOLUTIONS TOWER 1 (RESIDENTIAL), MOB & DEMOB

ATLANTIC LNG TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNETIC PARTICLE INSPECTION AND LOAD TEST PN TWELEVE CARGO BINS.

ATLANTIC LNG COATING & PAINTING INSPECTION OF GRIT BLASTING AND PAINTING OF CASTELLATED (NACE III) E TECK UTILITY BUILDING, IN TAMANA IN TECH PARK

ATLANTIC LNG RADIOGRAPHIC TESTING ON STEAM EXCHANGER

ATLANTIC LNG TO PROVIDE EQUIPMENT, CONSUMABLES, TRANSPORTATION TO PERFORM VISUAL AND ULTRASONIC THICKNESS MEASUREMENT AND MPI

ATLANTIC LNG GRIT BLASTING AND PAINTING OF CASTELLATED ETECK UTILITY BUILDING IN TAMANA IN TECH PARK

ATLANTIC LNG TO CARRY OUT MPI ON TEN STRONG BOXES (MODIFICATION), MPI ON ADAPTORS (2), MPI ON 2 STRONG BOX

ATLANTIC LNG RADIOGRAPHIC TESTING ON 1 1/2 WASH WATE, RADIOGRAPHIC TESTING ON 3/4'' PSV-20012

ATLANTIC LNG TO CARRY OUT RADIOGRAPHIC TESTING ON 36'' CASING

ATLANTIC LNG CARRY OUT MPI ON P32 PADEYES AND LIFITING LUGS 16 TYPE A AND 16 TYPE B

ATLANTIC LNG PWHT AND MPI ON RISER 7-1/16'' 3M X 7-1/1'' 3M X 2'' LP OUTLETS

ATLANTIC LNG MPI ON C PLATE-MM0697/07/C

ATLANTIC LNG TO CARRY OUT POST WELD HEAT TREATMENT &MPI ON INSPECTION ON DOUBLE STUDDED ADAPTER, BOP RING GROOVE, CASING HEAD DIAMETER 21 1/4''

ATLANTIC LNG INSPECTION ON T-UNION WELD ASSEMBLY, TO CARRY OUT RADIOGRAPHIC TESTING

ATLANTIC LNG TO CARRY OUT RT ON 20'' DIAMETER CASING

ATLANTIC LNG MPI ON LIFTING CAP NUT, 30'' TENSIONER ELEVATOR, (2) CASING HEADS

BBTTCC TO CARRY OUT MPI ON N2 UNIT PAD EYES

BBTTCC 6'' DIA BUTT WELD, 4'' DIA BUTT WELD, 2'' DIA BUTT WELD, 1/2 DIA BUTT WELD

CALMAQUIP (CARIBBEAN) LIMITED CARRY OUT MPI ON PUMPING TEE

CARIBBEAN DEVELOPMENT COMPANY LIMITED TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNATIC PARTICLE INSPECTION ON POS 3 UNIT INCLUDE; ALL IDENTIFIED AND MARKED AREAS TO PERFORM RT ON EIGHTEEN CARIBBEAN DEVELOPMENT COMPANY LIMITED THE NGC'S TEAK PLATFORM AS PER SCOPE OF WORKS

CARIBBEAN DEVELOPMENT COMPANY LIMITED TO PROVIDE MANPOWER, TOOLS AND EQUIPMENT TO CARRY OUT ULTRASONIC SHEAR EXAMINATION ON TWO (2) OFF 3'' DIAMETER WELDS ON THE IR# 5 UNIT

CARIBBEAN DOCKYARD POST WELD HEAT TREATMENT ON PUMP MODULE AS PER (INVOICE#2006/220)

D. RAMPERSAD & COMPANY MPI ON 18-5/8'' BUTTRESS NIPPLES, MPI STRESS RELIEF ON EXPANDING TOOL, MPI STRESS RELEIVING ON PUMPING D. RAMPERSAD & COMPANY TO CARRY OUT POST WELD HEAT TREATMENT AND MPI ON 7'' CASING HEAD X 2'' FLANGES SIDE OUTLET D. RAMPERSAD & COMPANY TO SUPPLY MANPOWER AND EQUIPMENT TO RADIOGRAPHY 100% FIVE 3'' SCHEDULE 80 WELD JOINT

D. RAMPERSAD & COMPANY TO CARRY RT ON 20'' DIAMETER CASING

D. RAMPERSAD & COMPANY TO CARRY OUT MPI ON STABBERLESS SINGLE JOINT ELEVATOR (5)

D. RAMPERSAD & COMPANY TO CARRY OUT RADIOGRAPHIC TESTING AND POST WELD HEAT TREATMENT ON 30'' CASING

D. RAMPERSAD & COMPANY MPI ON SUPPORT CLAMP

D. RAMPERSAD AND COMPANY TO CARRY OUT MPI ON 1/2'' X 6000#8'' DIA LINE

D2F TEACHNICAL LIMITED TO PROVIDE TOOLS, EQUIPMENT, MANPOWER AND TRANSPORT TO CARRY OUT LOAD TESTING AND RE-CERTIFING OF EXHAUST SILENCER RACK

D2F TECHNICAL LIMITED RADIOGRAPHIC TESTING ON TRAIN 4

D2F TECHNICAL LIMITED TO CARRY OUT RT ON 2'' AMHERSTIA PUMP

D2F TECHNICAL LIMITED TO CARRY OUT PRE-HEATING ON BEARING RACE

DLG ENGINEERING SERVICES LTD TO SUPPLY TRANSPORT FOR LIFTING DEVICES AND TEST LIFTING SUB FOR 20 1/2'' LIFTING DEVICES, TO SUPPLY TRANSPORT FOR LIFTING SUB & TEST LIFTING SUB FOR DLG ENINEERING SERVICES LTD TO PROVIDE TOOLS, EQUIPMENT AND MANPOWER TO CARRY ENGINEERING EVALUTION AND RECERTIFICATION OF PRESSURE VESSELS AND IR PULSATION DRUMS ON

EOG RESOURCES TRINIDAD LIMITED ASTM A106 GR.B PIPE, TO PERFORM RT ON (3) SOCKET WELDS ON 3/4 INCH 80 SCHEDULE ASTM A106 GR. B, TO PERFORM (1) BUTT WELD ON 3/4 INCH 80 SCHEDULE ASTM A106 GR. B PIPE & FITTING EOG RESOURCES TRINIDAD LIMITED LIQUID PENETRANT TESTING ON COOLING AIR PIPE

EOG RESOURCES TRINIDAD LIMITED TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNETIC PARTICLE INSPECTION AND LOAD TEST ON FIFTEEN (15) CARGO CONTAINER EOG RESOURCES TRINIDAD LIMITED BUTT WELD FROM 01/09/12 TO 30/09/13 RADIOGRAPHIC TESTING

(2)

EXPRO TRINIDAD LTD CARRY OUT MPI AND PWHT ON STUFFING BOX GLOBAL LIFTING SERVICE TRINIDAD LTD CARRY OUT MPI ON PUMP SKID

GLOBAL LIFTING SERVICE TRINIDAD LTD TO CARRY OUT RADIOGRAPHIC TESTING & MPI ON 8'' BY

GORMANDY ENGINEERING LTD TO PROVIDE TOOLS, EQUIPMENT, MANPOWER AND LABOUR TO CARRY OUT 100% RADIOGRAPHY TESTING (RT) INSPECTION ON SEVEN (7) SPOOL PIECES SCH PIPE GORMANDY ENGINEERING LTD TO CARRY OUT MPI AND LOAD TEST WR#12, 5, 7 PP#12 TB#16

GORMANDY ENGINEERING LTD TO CARRY OUT MPI ON AIR LINE BURNER FLARE BOOM

GORMANDY ENGINEERING LTD RADIOGRAPHIC TESTING 3/4'' PIPING

GORMANDY ENGINEERING LTD POST WELD HEAT TREATMENT & MAG PART INSP ON MUD PUMP NOODLE

GORMANDY ENGINEERING LTD STRESS RELEIVE ON STUDDED ADAPTER (INVOICE #2006/077), DYE PENETRANT ON NINETY GLAND NUTS 1-5/8'' PIN (INVOICE #2006/084)

GORMANDY ENGINEERING LTD TO CARRY OUT RT 4'', 8'' & 12'' BUTT WELDS TEE & F ADAPTERS, STRESS RELIEVING & MPI ON FISHING TOOL, MPI & POST W HEAT TREATMENT ON SPIDER 9.37'' ID GORMANDY ENGINEERING LTD TO CARRY OUT VISUAL AND MAGNETIC PARTICLE AND LOAD TESTING TB#1,PP#5,WR#5,TB#10

GORMANDY ENGINEERING LTD MPI ON INSPECTION ON SURGE TANK SPCM #04 SIDE GLASS FLANGE ELBOWS 3/4''

GORMANDY'S ENGINEERING LTD TO CARRY OUT VISUAL AND MPI AND LOAD TEST

GORMANDY'S ENGINEERING LTD MPI ON INSPECTION ON SURGE TANK SPCM #04 SIDE GLASS FLANGE ELBOWS 3/4''

GULF MARINE SERVICE LTD PASS LINE WELD-O-LET

IAL ENINEERING LTD TO CARRY OUT COATING & PAINTING INSPECTION ON STRUCTURAL BEAMS FOR PETROTRIN

IAL ENINEERING LTD TO CARRY OUT RT ON TRAIN 3

IAL ENINEERING LTD TO CARRY OUT TRANSPORTATION FOR QTISL @ VARIOUS LOCATIONS

IAL ENINEERING LTD TO CARRY OUT TRANSPORTATION FOR 14 NGC CAGO CONTAINERS

IAL ENINEERING LTD TO CARRY OUT TRANSPORTATION FOR 20 NGC CAGO CONTAINERS

IAL ENINEERING LTD MOB & DEMOB

IAL ENINEERING LTD INSPECTION,TESTING & CERTS ON N2 BOTTLES, SAND BLASTING & PAINTING ON 24 NITROGEN BOTTLES, TO PROVIDE TRANSPORT FOR 24 NITROGEN BOTTLE

IAL ENINEERING LTD TO PROVIDE EQUIPMENT,TOOLS AND MAN POWER TO PERFORM MPI ON STRUCTURAL WELDS OF THE CRANE PEDESTAL FOR THE NATIONAL GAS COMPANY POUI SEA KING CRANE

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON TRAIN 4 DRY FLARE HEADER 2 16'' WELDS

IAL ENINEERING LTD TO CARRY OUT MPI ON ADAPTOR (4)

IAL ENINEERING LTD TO CARRY OUT MPI TESTING ON TOOL BOX #16, MPI TESTING ON POWER PACK #12, MPI TESTING ON WIRELINE REEL #6 & 12

IAL ENINEERING LTD TO CARRY OUT MPI ON CARGO BASKET

IAL ENINEERING LTD LABOUR AND MATERIALS FOR INSPECTION ON NORTH NBC TANK

IAL ENINEERING LTD TO PROVIDE TOOLS AND MANPOWER TO PERFORM MPI TESTING ON ELEVEN (11) CRANE BOOM LATTICES FOR NATIONAL GAS COMPANY POUI SEA KING CRANE IAL ENINEERING LTD TO PROVIDE TOOLS, EQUIPMENT AND MANPOWER TO PMI ON WELDS OF CRANE BOOM LATTICES FOR NATIONAL GAS COMPANY POUI SEA KING CRANE

IAL ENINEERING LTD TO CARRY OUT PRE & POST WELD HEAT TREATMENT @P.P.G.P.L

IAL ENINEERING LTD RADIOGRAPHIC TESTING

IAL ENINEERING LTD TO PROVIDE TOOLS,EQUIPMENT AND MANPOWER TO PERFORM MPI TESTING ON THE WELDS OF POUI# 5 2ND STG. SUCTION DRUM BLEED LINE

IAL ENINEERING LTD TO PROVIDE VISUAL & MPI ON STRUCTURAL WELDS

IAL ENINEERING LTD TO CARRY OUT MPI ON FLANGE ADAPTERS

IAL ENINEERING LTD TO CARRY OUT R.T. ON 20'' CASING SPOOL#1

IAL ENINEERING LTD TO CARRY OUT M.P.I ON CORNER POST MODIFICATION

IAL ENINEERING LTD TO CARRY OUT MPI RTON FLARE BOOM PIPING AND BASE

IAL ENINEERING LTD TO CARRY OUT RT ON 20'' SPOOL

IAL ENINEERING LTD TO CARRY OUT MPI ON TABLE FOR 14'' CASING

IAL ENINEERING LTD TO CARRY OUT LOAD TESTING AND RECERTIFICATION OF TWO (2) SCAFFOLDING BASKETS #29 AND #39

IAL ENINEERING LTD TO PROVIDE LABOUR,EQUIPMENT AND TOOLS TO PERFORM MAGNETIC PARTICLE INSPECTION (MPI) ON ALL WELDS AND TO CARRY OUT HYDROSTATIC TESTING

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT TREATMENT & MPI ON BOWL SPOON

IAL ENINEERING LTD TO CARRY OUT MPI ON C PLATE

IAL ENINEERING LTD TO CARRY OUT MPI ON MANIFOLD NITROGEN DISTRIBUTION

IAL ENINEERING LTD TO CARRY OUT MPI TESTING ON SIX (6) HALF INCH. 80 BACK WELD ON 1/2'' VALVE FOR I.R#2 SUCTION AND DISCHARGE DRUMS IAL ENINEERING LTD RADIOGRAPHIC TESTING 6'' DIA BUTT WELD, 4'' DIA BUTT WELD, 2'' DIA BUTT WELD,1/2 DIA BUTT WELD

(3)

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING ON 36' CASING

IAL ENINEERING LTD CARRY OUT VISUAL & MAG. PARTICLE & LOAD TEST ON TOOLBOX #7

IAL ENINEERING LTD TO CARRY OUT VISUAL MPI LUBRICATOR CLAMP TB#16, 11, 10, 12

IAL ENINEERING LTD TO CARRY OUT COATING & PAINTING INSPECTION ON STRUCTURAL BEAMS FOR PETROTRIN

IAL ENINEERING LTD TO CARRY OUT MPI ON STRUCTURAL BEAM FOR PETROTRIN

IAL ENINEERING LTD MPI IN 9-5/8'' ARROW SET PACKER

IAL ENINEERING LTD TO CARRY OUT MPI ON STRUCTUTSL BEAMS FOR PETROTRIN

IAL ENINEERING LTD TO PERFORM POST WELD HEAT TREATMENT & MPI ON 6'' CV

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT TREATMENT & MPI ON DRIVE PLATE FOR DRAW WORK KAN TAN RIG IV

IAL ENINEERING LTD TO CARR OUT MPI ON GIN POLE

IAL ENINEERING LTD TO CARRY OUT RT AND MPI ON 3-3'' SPOOL

IAL ENINEERING LTD TO CARRY OUT MPI ON TMS 150 BARGE PORT BOW & STERN WINCH

IAL ENINEERING LTD TO CARRY OUT MPI 13 3/8 CEMENTING HEAD

IAL ENINEERING LTD TO CARRY OUT MPI ON TOOLBOX

IAL ENINEERING LTD 1 1/2 WASH WATER LINE P-1204, RADIOGRAPHIC TESTING ON 3/4 PSV 20012

IAL ENINEERING LTD TO TEST FOUR (4) PIPE SPOOL XTRAY AND CERTIFY

IAL ENINEERING LTD TO CARRY OUT MPI & STRESS RELIEVING ON SEGMENT

IAL ENINEERING LTD NON-DESTRUCTIVE EXAMINATION FOR SERVICE MAIN AND METERING FACILITY TO AMIN MANUFACTURING LIMITED IAL ENINEERING LTD NON-DESTRUCTIVE EXAMINATION FOR SERVICE MAIN AND METERING FACILITY TO ONE WOODBROOK PLACE

IAL ENINEERING LTD TO RADIOGRAPH (1) ONE 8'' JOINT AS PER REQUEST

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT TREATMENT & MPI ON 7 1/16'' X 7'' BUTTRESS BOX CASING HEAD

IAL ENINEERING LTD CARRY OUT VISUAL MPI P-34

IAL ENINEERING LTD TO CARRY OUT PENETRANT TESTING ON N2 UNIT (4 PADEYES)

IAL ENINEERING LTD MPI ON 10 STRONG BOXES

IAL ENINEERING LTD MPI AND LOAD TEST ON WIRE REEL #11

IAL ENINEERING LTD CARRY OUT RADIOGRAPHIC TESTING & STRESS RELIEVING ON TEST CAP X SLX BOX, MPI ON SPREADER BAR, MPI ON PUP JOINTS, MPI AND POST WELD HEAT

IAL ENINEERING LTD WELD TREATMENT ON PUMP MODULE

IAL ENINEERING LTD TO CARRY OUT MPI AND RADIOGARPHIC TESTING POST WELD HEAT TREATMENT ON 30'' DIAMETER CASING

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON 3'' GAS LINE, TRANSFER PUMP PIPELINE

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON 12'' OIL LINE OPTION MANIFOLD

IAL ENINEERING LTD TO CERTIFY/TEST 100% PAD EYE OR LIFTING LUGS FOUR (4) AND 25% OF EXISTING STRACTURE BASE, FRAME

IAL ENINEERING LTD TO CARRY OUT MPI AND STRESS RELEIEVE ON CASING HEAD

IAL ENINEERING LTD TO CARRY OUT MPI ON BOP WELDNECK FLANGE

IAL ENINEERING LTD RENTAL OF HOLIDAY DETECTION EQUIPMENT

IAL ENINEERING LTD CARRY OUT MPI ON LIFTING LUGS & PADEYES ON P 32 UNIT, RT & PT ON P 32 UNIT PIPING

IAL ENINEERING LTD MPI ON 6'' CELLAR JET 2'' PIPING

IAL ENINEERING LTD TO CARRY OUT MPI ON BEARING SADDLE CENTER

IAL ENINEERING LTD CARRY OUT RADIOGRAPHIC TESTING ON 4'' & 6" REPLACEMENT PIPING

IAL ENINEERING LTD INSPECT 9-5/8' ARROW IX PACKER TO PERFORM MPI INSPECTION ON ALL PARTS

IAL ENINEERING LTD POST WELD HEAT TREATMENT AND MPI ON 7-1/16 3M X 7-1/16 3M X 2' LP OUTLET

IAL ENINEERING LTD TO CARRY OUT UT THICKNESS MEASUREMENTS ON SURGE TANK SPM-04, MANIFOLD

IAL ENINEERING LTD POST WELD HEAT TREATMENT ON MPI ON 7-1/16'' 3M X 7-1/16' 3M X 2'' LP OUTLETS IAL ENINEERING LTD POST WELD HEAT TREATMENT & MPI ON 7-1/16'' 3M X7-1/16'' 3M X 2'' LP OUTLET

IAL ENINEERING LTD TO CARRY OUT MPI ON BLEED RING

IAL ENINEERING LTD TESTING OF WIRELINE UNIT

IAL ENINEERING LTD TO CARRY OUT MPI ON (13) BEARING SADDLE CENTERS

IAL ENINEERING LTD TO CARRY OUT MPI ON CASING HEAD

(4)

IAL ENINEERING LTD TO CARRY OUT MPI & RT FIRE PUMP GAS PRESSURE INLET AND OUTLET PIPING FOR TEAK PLATFORM AT NATIONAL GAS COMPANY PLATFORM

IAL ENINEERING LTD RE-CERTIFICATION ON PAD EYES ON S/S TANKS AND FRAMES

IAL ENINEERING LTD TO CARRY OUT MPI ON PAD EYES AND LIFTING LUGS ON TOOL BOXES

IAL ENINEERING LTD CARRY OUT RADIOGRAPHIC INSPECTION ON SPOOL

IAL ENINEERING LTD CARRY OUT MPI ON BEAM CLAMPS

IAL ENINEERING LTD MPI ON SADDLE BEARING CENTERS (7)

IAL ENINEERING LTD MPI ON CASING HEAD-MM0749/07

IAL ENINEERING LTD MPI ON ON FILTER UNIT (FU4), SAND INJECTION (SI#2), TRIPLEX PUMP (P 18)

IAL ENINEERING LTD TO CARRY OUT PWHT & MPI ON BOP

IAL ENINEERING LTD MPI ON C-PLATE AS PER INVOICE #2006/13

IAL ENINEERING LTD MPI ON SUPPORT CLAMP

IAL ENINEERING LTD MPI ON LIFTING CAP NUT, 30'' TENSIONER ELEVATOR, (2) CASING HEADS

IAL ENINEERING LTD RE-CERTIFICATION OF S/S TANKS AND FRAMES

IAL ENINEERING LTD RADIOGRAPHIC TESTING 2" P-41204A DISCHARGE LINE AT TRAIN #4

IAL ENINEERING LTD RADIOGRAPHIC TESTING COOLDOWN LINE FOR P-1601A

IAL ENINEERING LTD TO PERFORM RADIOGRAPHIC TESTING ON EIGHT (8) TWO INCH (2'') BUTT WELDS FOR STAINLESS STEEL GAS SUPPLY LINE TO CHILLERS AT NATIONAL GAS COMPANY IAL ENINEERING LTD TO PROVIDE MANPOWER AND EQUIPMENT TO PERFORM RADIOGRAPHY TESTING ON (16) 2'' SCHEDULE 80 SOCKET WELDS FOR CONDENSATE LINE

IAL ENINEERING LTD TO PROVIDE MANPOWER, TOOLS AND EQUIPMENT TO EQUIPMENT TO RADIOGRAPHY FOURTEEN (14) 2'' UTILITY BY-PASS GAS LINE FOR TEAK

IAL ENINEERING LTD INSPECTION ON GAS SEPERATOR

IAL ENINEERING LTD RADIOGRAPHIC TESTING & POST WELD HEAT TREATMENT ON 9 30'' DIA BUTT WELDS

IAL ENINEERING LTD TO CARRY MPI ON TWO TOOL BOX GT#2 AND PLT#001

IAL ENINEERING LTD VISUAL & MAGNETIC PART. INSPECTION ON CASING HEAD INVOICE#2007/117

IAL ENINEERING LTD TCP GUN PROTECTORS TO INSPECT AND LOAD TEST, TCP GUN LIFTING HEADS TO INSPECT, LIFTING HEADS-MIP

IAL ENINEERING LTD TO CARRY OUT R.T ON EXPRO 4'' SPOOLS

IAL ENINEERING LTD STRESS RELIEVING ON ON MUD PUMP MODULE

IAL ENINEERING LTD RADIOGRAPHY ON BOG DISCHARGE TO N12 STRAINER, RADIOGRAPHIC TESTING ON 2'' DEFROST LINE TRAIN 3

IAL ENINEERING LTD TO CARRY OUT MPI ON OIL HEADER

IAL ENINEERING LTD TO CARRY OUT UT AND RT ON 3'' SPOOL

IAL ENINEERING LTD TO CARRY OUT MPI ON ROOT AREA ON 20'' DIA CASING SW-14

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING ON 2-20'' BUTT WELDS

IAL ENINEERING LTD TO CARRY OUT VISUAL AND MAGNETIC INSPECTION

IAL ENINEERING LTD TO CARRY OUT MPI ON SCHLUMBERGER FLARE BOOM BASE

IAL ENINEERING LTD TO CARRY RT ON 20'' DIAMETER CASING

IAL ENINEERING LTD RADIOGRAPHIC TESTING XV-316989

IAL ENINEERING LTD TO CARRY OUT MPI ON ROOT AREA ON 20'' DIA CASING SW-14

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING ON 2-20'' BUTT WELDS

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON STEAM EXCHANGER

IAL ENINEERING LTD TO CARRY OUT VISUAL AND MAGNETIC INSPECTION

IAL ENINEERING LTD TO CARRY OUT RT ON EXPRO 3'' SPOOL

IAL ENINEERING LTD TO CARRY OUT MPI ON PAD EYES

IAL ENINEERING LTD 3-1/2'' X 2-7/8 CROSSOVER TO INSPEC THRADS & CERTIFY

IAL ENINEERING LTD RT @CARAPAL RIDGE ON 4'' INLET GAS

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON 8'' PIPLINE

IAL ENINEERING LTD GT 7 ROTOR RETAINING RING REMOVAL-HEATING

IAL ENINEERING LTD MPI OF TWO (2) WELDS ON RAS OUTFALL SPOOR FOR CLARIFIER

IAL ENINEERING LTD MPI ON ADAPTER B1, MPI AND POST WELD HEAR TREATMENT ON MUD PUMP MODULE

IAL ENINEERING LTD MPI ON FOUR (4) PADEYES AND LIFTING LUGS ON 48'' X 96'' PLATE

(5)

IAL ENINEERING LTD MPI ON EQUIPMENTS

IAL ENINEERING LTD MPI ON ALL COIL EQUIPMENTS & ASSOCIATED EQUIPMENTS, MPI ON CRANE TRAILER

IAL ENINEERING LTD CARRY OUT HEATING ON GENERATOR RETAINING RIG OF PENAL #7

IAL ENINEERING LTD ULTRASONIC TESTING SURVEY ON VESSEL TROUT

IAL ENINEERING LTD TO CARRY MAGNETIC PARTICLE INSPECTION EXH #01 SPREDDER BAR IN MAIN TUBE

IAL ENINEERING LTD RADIOGRAPHIC WORKS-UMLE EXP

IAL ENINEERING LTD PADEYE TESTING FOR THE 6 STAINLESS STEEL TOES

IAL ENINEERING LTD TESTING PADEYES

IAL ENINEERING LTD MPI ON HOSE

IAL ENINEERING LTD MPI ON PADEYES & LIFTING LUGS ON ELECTRICLINE CONTROL TRANSPORT SKID

IAL ENINEERING LTD STRESS RELIEVE ON CASING HEAD (INVOICE #2006/80), STRESS RELIEVE ON PUMP MODULE (INVOICE #2006/083)STRESS RELEIVE ON STUDDED ADAPTER

IAL ENINEERING LTD PRE HEAD ABD STRESS RELIEVE ON STUDDEND ADAPTER (INVOICE#2006/-78)

IAL ENINEERING LTD MPI ON PADEES AND LIFTING LUGS BOSS

IAL ENINEERING LTD CARRY OUT STRESS RELEIVE ON CASING HEADS (INVOICE #2006/093), STRESS RELIEVE AND RADIOGRAPHIC TESTING ON 13-3/8'' SLX CEMENTING HEAD

IAL ENINEERING LTD TEST AND CERTIFY PADEYES ON P#18, SI#2,FU#4

IAL ENINEERING LTD MPI ON B.J SEGMENTS

IAL ENINEERING LTD CARRY OUT PRE HEAT STRESS RELIEVE &MPI

IAL ENINEERING LTD STRESS RELIEVE CASING HEAD-MM0579/06/8

IAL ENINEERING LTD CARRY OUT RT ON FALRE BOOM PIPING 20-6 SCH 80 BUTTS PROFORMA DATED 13/06/2006

IAL ENINEERING LTD STRESS RELEIVE CASIN HEAD-MM0579/06/B

IAL ENINEERING LTD CARRY MPI ON RIG MASK SKID

IAL ENINEERING LTD SUPPLY RT 3''& 4'' BUTT WELD

IAL ENINEERING LTD MPI ON WING VALVE ASSEMBLY

IAL ENINEERING LTD MPI INSPECTION ON PADEYES AND LIFTING LUGS ON GBR#1,GBR#2, WELDING PLAYRACK IAL-01,IAL-02, AUTO CLAVE BOX MOHAGNY, TOOL BOX IAL TBF-01

IAL ENINEERING LTD CARRY OUT MPI

IAL ENINEERING LTD CARRY OUT MPI AND STRESS RELIEVING ON CEMENTING HEAD

IAL ENINEERING LTD INSPECTION ON OVERHEAD MONO RAILS AND DAVIT

IAL ENINEERING LTD TO POWER TOOL CLEAN WELDED AREA IN ORDER TO CARRY OUT PROPER EXAMINATION

IAL ENINEERING LTD TO CARRY OUT INSPECTION ON EQUIPMENT

IAL ENINEERING LTD TO GENERATE ALL NECESSARY REPORTS AND CERTIFICATE

IAL ENINEERING LTD WORK TO BE CARRIED OUT ON SATURDAY AND SUNDAY WHEN SHOP IS NOT IN USE

IAL ENINEERING LTD TO CARRY OUT ULTRASONIC TESTING ON VESSEL

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING ON MPI ON GAS LINE

IAL ENINEERING LTD ULTRASONIC THICKNESS MEASUREMENT ON LUBRICATORS

IAL ENINEERING LTD CERTIFING OF WELDERS AND REINSPECTION AND LOAD TEST

IAL ENINEERING LTD CARRY OUT MPI ON ELEVATOR TOOL BOX

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING INSPECTION TO 50'' SITE WELD AT BEETHAM

IAL ENINEERING LTD CARRY OUT MPI ON (8) EIGHT PADEYES & LIFTING LUGS

IAL ENINEERING LTD CARRY OUT UT THICKNESS MEASUREMENTS ON TPS 223

IAL ENINEERING LTD MPI ON EWL MASK AND SUPPORT STAND, MPI ON FEMALE UNION FLANGE

IAL ENINEERING LTD POST WELD HEAT TREATMENT AND MPI ON PUMPING TEE (INVOICE#2006/173)

IAL ENINEERING LTD VISUAL & MAGNETIC PARTICLE INSPECTION OFFSHORE

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT, TREATMENT AND MAGNETIC PARTICLE INSPECTION ON PUMPING TEE

IAL ENINEERING LTD CARRY OUT MPI ON GAS LIFT MANDREL ITEM #1&20

IAL ENINEERING LTD MPI AND STRESS RELIEF ON BLEED RING AS PR INV.2006/183

IAL ENINEERING LTD CARRY OUT MPI AND STRESS RELIEVE ON 9 5/8'' CASING HEAD

IAL ENINEERING LTD SG & GS COMPOUNDS RADIO INSP-UMLE EXP

(6)

IAL ENINEERING LTD CARRY OUT RT ON 3'' FLARE BOOM PIPING

IAL ENINEERING LTD STRESS RELEIVING(INVOICE#2006/211)

IAL ENINEERING LTD CARRY OUT RADIOGRAPHIC TESTING ON 2'' CONDENSATE PIPING 8'' BY PASS LINE

IAL ENINEERING LTD MPI AND POST WELD HEAT TREATMENT ON PUMPING TEE (REFER TO INVOICE#2006/231, MPI AND RADIOGRAPHIC TESTING 30'' TENSIONER CLAMP (REFER TO

IAL ENINEERING LTD INVOICE #2006/229)

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT, TREATMENT AND MAGNETIC PARTICLE INSPECTION ON PUMPING TEE

IAL ENINEERING LTD TO CARRY OUT MPI ON INSPECTION ON DOUBLE STUDDED ADAPTOR

IAL ENINEERING LTD RADIOGRAPHIC EXAM ON 5 GUAYA TANKS

IAL ENINEERING LTD TO CARRY OUT COATING AND PAINTING ON C3 PIPING, TO CARRY AROUND RADIOGRAPHIC TESTING ON 48'' FORCE MAIN IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT, TREATMENT AND MAGNETIC PARTICLE INSPECTION ON PUMPING TEE

IAL ENINEERING LTD TO CARRY OUT MPI ON INSPECTION ON DOUBLE STUDDED ADAPTOR

IAL ENINEERING LTD TO COVER THE COST OF LBOUR, EQUIPMENT,TRANSPORT AND SUPERVISION TO PERFORM NON DESTRUCTIVE TESTING IAL ENINEERING LTD TO CARRY OUT VISUAL & MAGNETIC PARTICLE INSPECTION ON LIFTING LUG ON RIG MAST

IAL ENINEERING LTD MPI ON 18-5/8'' BUTTRESS NIPPLES, MPI STRESS RELIEF ON EXPANDING TOOL, MPI STRESS RELEIVING ON PUMPING

IAL ENINEERING LTD TO CARRY OUT MAGNETIC PARTICLE INSP. ON PAD EYES & 1/LUGS

IAL ENINEERING LTD TO SUPPLY MATERIALS AND LABOUR TO PERFORM RADIOGRAPHIC TESTING ON FORMER OUTLET PIGTAILS

IAL ENINEERING LTD TO CARRY OUT PWHT & MPI ON BOP

IAL ENINEERING LTD TO SUPPLY MATERIALS AND LABOUR TO PERFORM RADIOGRAPHIC TESTING ON CHEMICAL LINE AT M1 DEMIN PLANT

IAL ENINEERING LTD TO MPI THREE (3) OPEN TOP FRIGHT CONTAINER

IAL ENINEERING LTD PLATE-THICKNESS MEASUREMENTS ON RANGER

IAL ENINEERING LTD TO STRESS RELIEVE ONE (1) SHAFT 4 1/2'' DIA X 31'' LONG

IAL ENINEERING LTD INSPECTION ON PROPELLER SHAFT TAPE

IAL ENINEERING LTD ULTRA SONIC TESTING ON AFT DECK OF N.P ENTERPRISE

IAL ENINEERING LTD TO SUPPLY LABOUR AND EQUIPMENT TO CARRY OUT RADIOGRAPHIC TESTING ON 60D04 TUBES IAL ENINEERING LTD TO INSPECT WELDS AND BOLTS OF THE VERTICAL LIFT COLOUMNS AT BOARDING BRIDGE #14 IAL ENINEERING LTD 2-7/8 EUE BOX 3-1/2'' IF PIN CROSS OVER TO INSPECT & CERTIFY THREADS

IAL ENINEERING LTD TO RADIOGRAPH ONE WELDERS TEST COUPONS (12''3/4'' OD X 1.1125 WT)

IAL ENINEERING LTD TCP GUN PROTECTORS TO INSPECT AND LOAD TEST, TCP GUN LIFTING HEADS TO INSPECT, LIFTING HEADS-MIP

IAL ENINEERING LTD NON-DESTRUCTIVE EVALUATION ON NATURAL GAS PIPLENE TO DIAMOUND VALE INDUSTRIAL ESTATE PHASE 1-DIEGO MARTIN HIGHWAY EXTENSION IAL ENINEERING LTD TO SUPPLY MANPOWER AND EQUIPMENT TO RADIOGRAPHY 100% (4) 2'' TWO (2) 4'' SCHEDULE 80 WELD JOINT AND MAGNETIC PARTICLE (MPI) TEST,

IAL ENINEERING LTD TO CARRY OUT ULTRA SONIC TESTING ON NP ENTERPRISE

IAL ENINEERING LTD PAD EYES TO BE RE-CERTIFIED ON PCS #12

IAL ENINEERING LTD MPI, STRESS RELEIVING, RADIOGRAPHIC TESTING AND PREHEATING ON BAR

IAL ENINEERING LTD RADIOGRAPHIC TESTING AND MPI AND 30'' CONDUCTOR CASING RING & SHOULDER SUPPORT GUSSETS TENSIONER CLAMPS(INVOICE#2006/211) IAL ENINEERING LTD TO COVER THE COST OF LBOUR, EQUIPMENT,TRANSPORT AND SUPERVISION TO PERFORM RADIOGRAPHIC TESTING ON THE M1 PLANT

IAL ENINEERING LTD TO CARRY OUT (3) RADIOGRAPHIC TESTING 6'' WELDERS TEST

IAL ENINEERING LTD CARRY OUT RADIOGRAPHIC TESTING ON 2'' CONDENSATE PIPING 8'' BY PASS LINE

IAL ENINEERING LTD RADIOGRAPHIC TESTING ON (1) ONE 2'' & 3'' PIPING, (2) TWO 6'' PIPING, (3) THREE 6'' PIPING, (4) FOUR 6'' PIPING, (5) FIVE 3'' PIPING IAL ENINEERING LTD WITNESS PERFORM EXAMINATION INCLUSIVE OF RADIOGRAPHY AND CERTIFY 2 WELDERS (S.BHAGOUTIE AND K. RAMKISSION)

IAL ENINEERING LTD TO CARRY OUT R.T ON EXPRO 4'' SPOOLS

IAL ENINEERING LTD TO CARRY OUT ULTRA SONIC TESTING ON VESSEL TEM LESSE (1500) SHOTS

IAL ENINEERING LTD INSPECTION OF ABRASIVE BLAST CLEANING- TANK 2

IAL ENINEERING LTD STRESS RELIEVING ON ON MUD PUMP MODULE

IAL ENINEERING LTD TO CARRY OUT ULTRASONIC TESTING THICKNESS MEASUREMENT ON HULL PLATES

IAL ENINEERING LTD TO CARRY OUT MPI ON CASING SLEEVE 13-3/8

IAL ENINEERING LTD TO CARRY OUT RADIOGRAPHIC TESTING & MPI ON 8'' BY

IAL ENINEERING LTD STRESS RELIEVE REBULT SHAFT

(7)

IAL ENINEERING LTD TO CARRY OUT MAGNETIC PARTICLE INSP. ON PAD EYES & 1/LUGS

IAL ENINEERING LTD TO SUPPLY MATERIALS AND LABOUR TO PERFORM RADIOGRAPHIC TESTING ON FORMER OUTLET PIGTAILS IAL ENINEERING LTD TO SUPPLY MANPOWER AND EQUIPMENT TO RADIOGRAPHY 100% FIVE 3'' SCHEDULE 80 WELD JOINT IAL ENINEERING LTD MPI ON ON FILTER UNIT (FU4), SAND INJECTION (SI#2), TRIPLEX PUMP (P 18)

IAL ENINEERING LTD MPI ON C-PLATE AS PER INVOICE #2006/13

IAL ENINEERING LTD TO CARRY OUT POST WELD HEAT TREATMENT AND MPI ON 7'' CASING HEAD X 2'' FLANGES SIDE OUTLET

INTEGRATED PROJECT MANAGEMENT TO CARRY OUT FABRICATION AND INSTALLATION OF THE FIRE WATER PUMP CASING ASSEMBLIES ON NGS'S POUI PLATFORM

ISG TRINIDAD AND TOBAGO CARRY OUT MPI ON PUMPING TEE

ISG TRINIDAD UNLIMITED CARRY OUT RADIOGRAPHIC TESTING ON TMS 70 24'' LEG

LNG NON-DESTRUCTIVE EXAMINATION FOR A SERVICE MAIN AND METERING STATION AT THE NAPA

MARINERS HAVEN LIMITED PADEYE TESTING OF TANKS AND FRAMES

MARINERS HAVEN LIMITED TO CARRY OUT POST WELD HEAT TREATMENT AND MPI ON 7'' CASING HEAD X 2'' FLANGES SIDE OUTLET

MARINERS HAVEN LIMITED CARRY OUT MPI ON BASE FOR P26 UNIT

MARINERS HAVEN LIMITED CARRY OUT MPI AND RADIOHRAPHIC TESTING ON 3'' BG PIPING

MARINERS HAVEN LIMITED VISUAL AND MPI ON EWL STANDS, POWER PACK, EWL UNIT

MARINERS HAVEN LIMITED TO CARRY OUT VISUAL INSP. ON PAD EYES & INSP. L/LUGS-OFFSHORE-S/W METHANOL HOLDING TRINIDAD LIMITED CARRY OUT MPI AND STRESS RELIEIVING ON ELEVATOR BINS

METHANOL HOLDING TRINIDAD LIMITED TO CARRY OUT MPI ON CEMENTING HEAD

METHANOL HOLDING TRINIDAD LIMITED TO CARRY OUT MPI ON PAD EYES

METHANOL HOLDING TRINIDAD LIMITED TO PERFORM ONE (1) MAGNETIC PARTICLE INSPECTION ON WORTHINGTON 2007 J.T CASING (UPPER & LOWER) TURBINE CASING.

METHANOL HOLDING TRINIDAD LIMITED TO PERFORM NDE SERVICES AT FUEL ETHANOL 1. MAGNETIC PARTICLE INSPECTION (A) 21 X 8'' (B) 2 X 26'' (C ) 3 X 18'' (D) 4 X 12 METHANOL HOLDING TRINIDAD LIMITED TO PERFORM MAGNETIC PARTICLE INSPECTION ON ROTOR SHAFT

NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING (4) 1/2'' PLATE WELDERS TEST

NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING ON (54) 6'' WELDERS TEST, RADIOGRAPHIC TESTING ON (29) 4'' WELDERS TEST, RADIOGRAPHIC TESTING (29) 2'' WELDERS TEST NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING ON (37) 2'' WELDERS TEST, RADIOGRAPHIC TESTING (37) ON 4'' WELDERS TEST

NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON 6'' (36) WELDERS TEST NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING ON (11) 6'' SCH 40 PIPE (6G POSITION).

NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON (21) 6'' WELDERS TEST, RADIOGRAPHIC TESTING ON (4) 1/2'' WELDERS TEST NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON 1/2'' PLATE WELDERS TEST

NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON (15) 6'' WELDRS TEST, TO CARRY OUT RADIOGRAPHIC TESTING ON (18) 6'' WELDRS TEST, TO CARRY OUT RADIOGRAPHIC TESTING ON (18) 4'' WELDRS TEST NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON (23) 4'' WELDERS TEST, TO CARRY OUT RADIOGRAPHIC TESTING ON (25) 6'' WELDERS TEST, TO CARRY OUT RADIOGRAPHIC TESTING ON (23) 4'' WELDERS TEST NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 6'' WELDERS TEST ON (13) SCH 40, RADIOGRAPHIC TESTING ON (13) 1/2'' PLATE TEST

NATIONAL ENERGY SKILLS CENTER KNOCKOUT BOX

NATIONAL ENERGY SKILLS CENTER MAGNETIC PARTICLE TESTING ON PIPELINE

NATIONAL ENERGY SKILLS CENTER KNOCKOUT BOX

NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 6'' BUTT WELD TEST

NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 4'' BUTT WELDS TEST

NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 6'' BUTT WELDS TEST, RADIOGRAPHIC TESTING 2'' BUTT WELDS TEST, RADIOGRAPHIC TESTING 4'' BUTT WELDS TEST NATIONAL ENERGY SKILLS CENTER TO CARRY OUT RADIOGRAPHIC TESTING ON 130 BOILER TUBE BUTT WELDS

NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 6'' BUTT WELDS (57), RADIOGRAPHIC TESTING 2'' BUTT WELDS (29), RADIOGRAPHIC TESTING 1/2'' BUTT WELDS TEST (57) NATIONAL ENERGY SKILLS CENTER RADIOGRAPHIC TESTING 2'' BUTT WELDS (23), RADIOGRAPHIC TESTING 4'' BUTT WELDS (23), RADIOGRAPHIC TESTING 6'' BUTT WELDS TEST (32) NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PERFORM RADIOGRAPHIC TESTING ON STEAM PIPING WELD REPAIRS TO ENSURE INTEGRITY OF WELDS.

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO SOCKET WELDS ON 1 INCH 160 SCHEDULE ASTM A106, RT ON THREE (3) SOCKET WELDS 3/4 INCH 80 SCHEDULE ASTM A106 GR. B PIPE AND VALVE, 1 BUTT WELD ON 3/4 INCH 80 SCHEDLE ASTM A106. B PIPE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT RADIOGRAPHIC TESTING ON THE EMZ PIPING ON TOUCAN PLATFORM

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT MAGNETIC PARTICLE INSPECTION AND ULTRASONIC TESTING ON SPARROW CRANE HOLD DOWN CLIPS ON THE TOUCAN PLATFORM NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO ON THE NGC POUI PLATFORM AS PER SCOPE OF WORKS, TERMS AND CONDITIONS AND DRAWINGS PROVIDED.

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO INDUSTRIAL INSPECTION, GUIDED WAVE & LONG RANGE ULTRASONIC TESTING ON ATLANTIC LNG TRAIN 3

(8)

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE TOOLS, EQUIPMENT, MANPOWER AND TRANSPORT TO PERFORM LOAD TESTING AND RECERTIFYING OF CARGO NIN #38 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY TRANSPORT FOR MESH RITE SCREENS FOR TESTING FOAM LABIDCO TO QTISL WORKSHOP

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO BYPASS OUTLET LINE ON THE NGC POUI PLATFORM

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE MANPOWER AND EQUIPMENT TO LOAD TEST AND INSPECT (1) SHIPPING BIN AS PER ATTACHED CONTRACTOR QUOTATION FORM NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE MANPOWER AND EQUIPMENT TO CARRY OUT RADIOGRAPHIC TESTING ON 3'' VENT LINE LOCATION NGC POUI PLATFORM ON 20.07.10 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE MANPOWER AND EQUIPMENT TO CARRY OUT RADIOGRAPHIC TESTING ON 3'' VENT LINE LOCATION NGC POUI PLATFORM ON 10.08.10 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT MPI AND RT ON FLARE BOOM PIPING

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO WELDING, FABRICATION & HYDROSTATIC TESTING ON MECHANICAL PUMP ROOMS; TOWER 3, TOWER 3 LEVEL B1 DWG.#D-M-251a R2, TOWER 1 (RESIDENTIAL) NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT POST WELD ON TWO CASING HEAD, POST WELD HEAT TREATMENT ON TUBING SPOOL

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT VISUAL & MAGNETIC PARTICLE & LOAD TEST TB#12, PP#13, WR#11, 8 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO MPI ON 4 BASKETS,4 TOOL BOX, 2 SPREADER BARS, 38 PAD EYES

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO MPI,RT AND PWHT ON RISER

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PWHT AND MPI CASING HEADS,PHWT ON CASING HEADS NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT MPI AND PWHT ON BOP

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNETIC PARTICLE INSPECTION AND LOAD TEST SEVEN CARGO BINS.

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PROVIDE ULTRASONIC TESTING THICKNESS SURVEY ON NATURAL GAS PIPING NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT (150) RADIOGRAPHIC TESTING PROFILE SHOTS ON IPSL NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO MPI & DYE PENETRANT EXAM

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PERFORM NON DESTRUCTIVE EXAMINATION ON 12 30FT DIA TANKS, ENGINEERING EVALUATION ON TANKS AND ASSOCIATED PIPING NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE MANPOWER, TOOLS, EQUIPMENT AND LABOUR TO CARRY OUT ULTRASONIC TESTING ON THE NGC'S TEAK PLATFORM NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT NDT EXAMINATION INSPECTION ON NGC'S TEAK PLATFORM

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE OUT MPI & LOAD TESTON STORAGE BIN #49 & CARGO RACK #65 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT VISUAL & MAGNETIC PARTICEL INSPECTION ON S.E TO CLARIFIER #1 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT RADIOGRAPHIC TESTING ON FOAM UNIT #1

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE TOOLS, EQUIPMENT AND MANPOWER TO PERFORM RT AND MPI TESTING ON THE WELDS OF THE BEETHAM ESTATE CNG STATION SKID NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT MPI INSPECTION & POST WELD HEAT TREATMENT ON RISER SPOOL

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PADEYE TESTING FOR 16 SS TANKS

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO NON DESTRUCTIVE EXAMINATION OF FOUR (4) CNG METERING STATIONS

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO NON-DESTRUCTIVE EXAMINATION FOR THE INSTALLATION OF NATURAL GAS ODORIZERS UNITS AT CNG SERVICE STATIONS NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT NON DESTRUCTIVE EXAMINATION ON TEMPORARY CONNECTION TO BEACHFIELD CONDENSATE TANKS

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PERFORM API 570 EVALUATION OF THE NATURAL GAS LINE BETWEEN OUTLET OF LOW PRESSURE NATURAL GAS STATION AND BUTNER MANIFOLDS ON BOILER 1 TO 4 INCLUSIVE OF THE KNOCK OUT BOX NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PERFORM API 510 EVALUATION OF THE KNOCK OUT BOX, PERFORM VISUAL INSPECTIONS OF ALL PIPING SUPPORTS AND APPURTENANCES, TO PERFORM ULTRASONIC THICKNESS TESTING ON PIPLENES AND NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO 6'' BUTT WELD FROM 01/09/12 TO 30/09/13 RADIOGRAPHIC TESTING (32)

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO 6'' BUTT WELD FROM 01/09/12 TO 30/09/13 RADIOGRAPHIC TESTING (33) NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO 6'' BUTT WELD FROM 01/09/12 TO 30/09/13 RADIOGRAPHIC TESTING (16)

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PROVISION OF SERVICE FOR NON-DESTRUCTIVE EXAMINATION DURING INSTALLATION OF NATURAL GAS ODOURIZER UNITS AT CNG SERVICE STATIONS NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE TOOLS, EQUIPMENT AND MANPOWER TO CARRY OUT RADIOGRAPHIC TESTING AND MAGNETIC PARTICLE INSPECTION OF THE 2'' CONDENSATE LINE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE TOOLS, EQUIPMENT AND MANPOWER TO CARRY OUT RADIOGRAPHIC TESTING AND MAGNETIC PARTICLE INSPECTION OF THE 2'' UTILITY GAS LINE

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE RENTAL OF ONE DIESEL ENGINE DRIVEN AIR COMPRESSOR CAPACITY 185 SCFM, OUTPUT PRESSURE 125PSI AND 50FT HOSE FOR A PERIOD OF SEVEN DAYS FROM THURSDAY, 3RD OF OCTOBER 2013 NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO FOR TEAK PLATFROM. EXHAUST MUST BE EQUIP WITH A SPARK ARRESTOR AND ALL ELECTRICAL CONTACTS SECURED.

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO CONSISTING OF:1. FOURTEEN (14) 3'' WELDS, 2. TEN(10) 2'' WELDS 3. TWELV (12) 3'' WELDS, 4. EIGHT (8) 2'' WELDS

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO JETTY 2 LOADING LINE REPAIRS, RT COVERAGE FOR OUTAGE (OPS-17311), TRAIN 1 3/4'' COOL DOWN LINE FOR P-1601A/B (OPSS-17311)

NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TRAIN 2 DEFROST LINE HEADER REPAIRS (OPS-17311), RT ON TRAIN 1 3'' PROPANE INJECTION PIPING (OPS-17317), RT ON METHANE FOR COLD BOX C (OPS-17315) NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO RT ON SEAL GAS LINE FOR C-41531 (OPS-17315)

NESC TO CARRY OUT MPI & LOAD TESTING ON EQUIPMENT (3PCS)

NESC TO CARRY RADIOGRAPHIC TESTING AND POST HEAT TREATMENT ON 2-30'' DIAMETER

NH INTERNATIONAL CARIBBEAN LIMITED TO CARRY OUT WELDING FABRICATION & HYDROSTATIC TESTING ON MECHANICAL PUMP ROOMS- TOWER 3 PUMP ROOM, TOWER 3 LEVEL B1 DWG # D-M-251A R2

(9)

NH INTERNATIONAL CARIBBEAN LIMITED TO CARRY OUT MPI & ULTASONIC TESTING ON MEZZANNIE COLUMN

PETROLEUM COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT AND LOAD TEST CARGO CONTAINERS AND CARRY OUT MPI ON PAD EYES PETROLEUM COMPANY OF TRINIDAD AND TOBAGO SUPPLY RT 3'' & 4'' BUTT WELD

PETROLEUM COMPANY OF TRINIDAD AND TOBAGO CARRY RADIOGRAPHIC TESTING ON CONDENSATE

PETROLEUM COMPANY OF TRINIDAD AND TOBAGO MAGNETIC PARTICLE TESTING ON FOUR (4) BASKET 2.68 X 1.37 X 1.38M PETROLEUM COMPANY OF TRINIDAD AND TOBAGO VISUAL AND MPI ON EWL STANDS, POWER PACK, EWL UNIT PETROLEUM COMPANY TRINIDAD AND TOBAGO TO CARRY OUT MPI ON OIL HEADER

POWERGEN TO CARRY OUT MPI ON PAD EYES

POWERGEN COMPANY OF TRINIDAD AND TOBAGO LTD MAGNETIC PARTICLE TESTING ON PIPELINE

PRO COM PROCESS COMPONENTS LTD TO PROVIDE TOOLS, EQUIPMENT MANPOWER TO CARRY OU TENGINEERING EVALUATION AND RECERTIFICATION OF PRESSURE VESSELS AND IR PULSATION DRUMS

QTISL TO CARRY OUT RADIOGRAPHIC TESTING AND POST WELD HEAT TREATMENT ON 30'' DIAMETER CASING TO LANDING RING

STARCON TO CARRY OUT RT ON SEA MANATEE PIPING

T.W.E WELDING EXPERTS LIMITED PENATRANT TESTING INSPECTION

T.W.E WELDING EXPERTS LIMITED TO PROVIDE RENTAL OF ONE (1) HYDROSTATIC PUMP FOR ONE (1) DAY FOR PRESSURE TESTING THE SOLAR GAS COOLER FOR FIN FAN THE NATIONAL GAS COMPANY OF TRINIDAD & TOBAGO CARRY OUT RADIOGRAPHIC TESTING & MPI ON 8'' BY PASS LINE O LET

THE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO MAGNETIC PARTICLE INSPECTION ON I BEAM SUPPORT , MAGNETIC PARTICLE INSPECTION ON 30'' LANDING RINGS THE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO PASS LINE WELD-O-LET

THE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO MAGNETIC PARTICLE INSPECTION ON PADEYES

THE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY LABOUR TOOLS, EQUIPMENT AND CONSUMABLES TO CARRY OT RADIOGRAPHIC,PT,MPI,RT AND UT TESTING ON HYDROGEN LINE THE NATIONAL GAS COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT VISUAL INSP. ON PAD EYES & INSP. L/LUGS-OFFSHORE-S/W

THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO RENTAL OF MAGNETIC INSPECTION UNIT (4000 AMP-CURRENT GENERATORS TYPE TO BE USED WITH CABLE COIL), MOBILIZATION/ DEMOBILIZATION THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO RENTAL OF MAGNETIC INSPECTION UNIT WITH TWOADDITIONAL DAYS RENTAL

THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNATIC PARTICLE INSPECTION ON TURBINE ROTOR SECTION WITHOUT BLADES, THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY ONED MAGNETIC PARTICLE INSPECTION DURING PENAL 9 MAJOR OVERHAUL ON A TIME AND MATERIAL BASIS.

THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO RADIOGRAPHIC TESTING 6'' WELDERS TEST ON (21) SCH 40, RADIOGRAPHIC TESTING ON (2) 1/2'' PLATE TEST THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO CARRY OUT RADIOGRAPHIC TESTING ON EMZ PIPING ON TOUCAN PLATFORM

THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO SUPPLY MATERIAL, EQUIPMENT, LABOUR AND TRANSPORT TO PERFORM MAGNATIC PARTICLE INSPECTION AND LOAD TEST TWELVE (12) CARGO BINS. CONTAINER TO BE COLLECTING AND RETURNED THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE RENTAL OF ONE (1) 400 AMPS WELDING MACHINE FOR A PERIOD OF THIRTY (30) DAYS FROM APRIL 10, 2013 TO MAY 09, 2013. CONTRACTOR TO DELIVER MACHINE TO THE NGC'S FIELD OFFICE THE POWER GENERATION COMPANY OF TRINIDAD AND TOBAGO TO PROVIDE LABOUR, TOOLS, EQUPMENT, MATERIALS, CONSUMABLES, TRANSPORT AND SUPERVISION TO CARRY OUT RADIOGRAPHIC INSPECTION POS 3; RT ON (18) SOCKET WELDS ON 1 INCH 160 SCHEDULE TOSL ENGINEERING LIMITED TO CARRY OUT MPI ON EIGHT (8) LIFTING LOG WELDS FOR SCAFFOLDING SHIPPING BASKETS AT NATIONAL GAS COMPANY WORKSHOP

TRINIDAD AND TOBAGO ELECTRICITY COMMISSION INSPECTION (2) 2 TON KONE CRANE INSPECTION, (1) 5 TON KONE CRANE INSPECTION, (6) VERTICAL WELDED CYLINDER PRESSURE VESSEL TRINIDAD AND TOBAGO ELECTRICITY COMMISSION INSPECTION (2) 2 TON KONE CRANE INSPECTION, (1) 5 TON KONE CRANE INSPECTION, (6) VERTICAL WELDED CYLINDER PRESSURE VESSEL TRINWELD CONTRACTING SERVICES LTD TO CARRY OUT RT ON EXPRO 3'' SPOOL

TUCKER ENERGY SERVICES LIMITED TO SUPPLY MATERIALS, EQUIPMENT, LABOUR AND TRANSPORT TO LOAD TEST TEN (10) CARGO CONTAINERS AND CARRY OUT MPI ON PAD EYES TUCKER ENERGY SERVICES LIMITED NON-DESTRUCTIVE EXAMINATION DURING CONSTRUCTION OF A SERVICE MAIN AND METERING STATION AT MARABELLA GOV'T SECONDARY SCHOOL TUCKER ENERGY SERVICES LIMITED TO PROVIDE A TECHNICIAN TO CARRY OUT RADIOGRAPHY TESTING ON TZZ 101 HP DISCHARGE PIPING ON NATIONAL GAS COMPANY'S TEAK PLATFORM TUCKER ENERGY SERVICES LIMITED TO CARRY OUT MPI TESTING & POST WELD HEAT TREATMENT

TUCKER ENERGY SERVICES LIMITED AND CERTIFICATION ON THREE (3) SUCTION DRUMS LOCATED AT PT LISAS

TUCKER ENERGY SERVICES LIMITED CLEANING AND TESTING OF PADEYES ON ACID FILTER #1, CLEANING & OF PADEYES ON TOOLBOX (OH TB-1) TUCKER ENERGY SERVICES LIMITED HEAT TREATMENT & MPI ON FLANGE STUDDED CROSS, CASING HEAAD

TUCKER ENERGY SERVICES LIMITED CARRY OUT MPI VISUAL & MAGNETIC PARTICLE INSPECTION

TUCKER ENERGY SERVICES LIMITED TO CARRY OUT MPI ON SKID

TUCKER ENERGY SERVICES LIMITED RT INSPECTION

TUCKER ENERGY SERVICES LIMITED TO CARRY MPI & LOAD TEST ON POWER PACK, TOOLBOX, ELECTRIC WIRE LIN EUNIT TUCKER ENERGY SERVICES LIMITED TO CARRY OUT RADIOGRAPHIC TESTING ON 20'' CASING SPOOL#1 & #2

TUCKER ENERGY SERVICES LIMITED S/R MPI &RT ON 30'' CASING

TUCKER ENERGY SERVICES LIMITED MPI INSPECTION ON CRANE

(10)

TUCKER ENERGY SERVICES LIMITED TO PROVIDE TOOLS, EQUIPMENT, MANPOWER AND TRANSPORT TO PERFORM LOAD TESTING AND RECERTIFICATION OF CARGO BIN#107

TUCKER ENERGY SERVICES LIMITED TO SUPPLY MATERIALS, EQUIPMENT, LABOUR AND TRANSPORT TO LOAD TEST FOURTEEN (14) CARGO CONTAINERS AND TO CARRY OUT MPI ON PADEYES TUCKER ENERGY SERVICES LIMITED TO PROVIDE MANPOWER, TOOLS AND EQUIPMENT TO CARRY OUT ULTRASONIC SHEAR EXAMINATION ON THE IR# 5 UNIT BYPASS OUTLET LINE ON THE NGC POUI

TUCKER ENERGY SERVICES LIMITED 20' LIFTING SUB

TUCKER ENERGY SERVICES LIMITED TO CARRY OUT MPI ON INSPECTION ON DOUBLE STUDDED ADAPTOR

TUCKER ENERGY SERVICES LIMITED CARRY OUT MPI ON CONDENSATE POT

TUCKER ENERGY SERVICES LIMITED CARRY OUT MPI ON CEMENT HEAD

TUCKER ENERGY SERVICES LIMITED MPI ON LIFTING BAR (INVOICE#2006/219), STRESS RELEIVING, RADIOGRAPHIC TESTING AND PREHEATING ON 13-5/8'' RISER(INVOICE#2006/217), TUCKER ENERGY SERVICES LIMITED RADIOGRAPHIC TESTING AND MPI AND 30'' CONDUCTOR CASING RING & SHOULDER SUPPORT GUSSETS TENSIONER CLAMPS(INVOICE#2006/211)

TUCKER ENERGY SERVICES LIMITED CARRY OUT MPI ON GROUNDING CLAMPS

TUCKER ENERGY SERVICES LIMITED MPI ON INSPECTION ON SURGE TANK SPCM #04 SIDE GLASS FLANGE ELBOWS 3/4''

TUCKER ENERGY SERVICES LIMITED TO COVER THE COST OF LBOUR, EQUIPMENT,TRANSPORT AND SUPERVISION TO PERFORM RADIOGRAPHIC TESTING ON THE M1 PLANT, TUCKER ENERGY SERVICES LIMITED MAGNETIC PARTICLE TESTING ON FOUR (4) BASKET 2.68 X 1.37 X 1.38M

TUCKER ENERGY SERVICES LIMITED 2. RADIOGRAPHIC TESTING (A) 1 X 10'' (B) 17 X 8" 3. 2X MINIMUM CALL OUT CHARGES TUCKER ENERGY SERVICES LIMITED CARRY OUT RADIOGRAPHIC TESTING ON TMS 70 24'' LEG

TUCKER ENERGY SERVICES LIMITED PERFORM MAGNETIC PARTICLE INSPECTION FOR FALK GEAR FOR BOTH BOXES TUCKER ENERGY SERVICES LIMITED RADIOGRAPHIC TESTING ON 12 BUTT WELDS, PIPING ON 3'' SCH. 40 PIPING, 8'' SCH 40 PIPING, TUCKER ENERGY SERVICES LTD TO CARRY OUT MPI & STRESS RELIEVE ON CASING TEST FLANGES

TUCKER ENERGY SERVICES LTD MPI ON WIRE RAIL (OTAHEITE), WR #11,PP#5 WR#5, TB#16 LUBRICATOR CLAMP TB#16 (RIG 50), PP#13, TB#12 LUBRICATOR CLAMP TB#12

TUCKER ENERGY SERVICES LTD MPI AND PWHT ON C-PLATE AND CASING HEAD

TUCKER ENERGY SERVICES LTD CARRY OUT MPI ON INSPECTION ON PADEYES AND LIFTING LUGS ON CARGO STORAGE BOX

TUCKER ENERGY SERVICES LTD TO CARRY OUT RT 4'', 8'' & 12'' BUTT WELDS TEE & F ADAPTERS, STRESS RELIEVING & MPI ON FISHING TOOL, MPI & POST W HEAT TREATMENT ON SPIDER 9.37'' ID TUCKER ENERGY SERVICES LTD TO CARRY OUT RADIOGRAPHIC TESTING & POST WELD HEAT TREATMENT ON 14-20'' DIAMETER CASING

TUCKER ENERGY SERVICES LTD POST WELD HEAT TREATMENT & MAG PART INSP ON MUD PUMP NOODLE

TUCKER ENERGY SERVICES LTD TO CARRY OUT RT ON 20'' DIAMETER CASING

TUCKER ENERGY SERVICES LTD TO CARRY OUT MPI ON STABBERLESS SINGLE JOINT ELEVATOR (5)

TUCKER ENERGY SERVICES LTD TO CARRY OUT RADIOGRAPHIC TESTING & POST WELD HEAT TREATMENT ON 14-20'' DIAMETER CASING

TUCKER ENERGY SERVICES LTD TO CARRY OUT UT AND RT ON 3'' SPOOL

TUCKER ENERGY SERVICES LTD MPI ON GUIDE PLATES

TUCKER ENERGY SERVICES LTD RADIOGRAPHIC TESTING ON 3'' PROPANE INJECTION LINE TUCKER ENERGY SERVICES LTD TO CARRY OUT MPI ON CEMENT HEAD, AIR TANK, STONE CATCHER

TUCKER ENERGY SERVICES LTD PADEYE TESTING OF THE TANKS AND CAGES

TUCKER ENERGY SERVICES LTD CARRY OUT STRESS RELEIVING ON CASING HEAD(INVOICE #2006/079), PREHEAT AND STRESS RELEIVE ON BOP FLANGE FACE (INVOICE 2008/081)

TUCKER ENERGY SERVICES LTD TO PERFORM MAGNETIC PARTICLE TESTING ON PADEYES

TUCKER ENERGY SERVICES LTD TO CARRY OUT MPI ON KO POT OVER FLOW LINE

TUCKER ENERGY SERVICES LTD CARRY OUT MPI AND PWHT ON STUFFING BOX

TUCKER ENGINEERING SERVICES LIMITED TO CARRY OUT VISUAL AND MPI

WATER AND SEWAGE COMPANY OF TRINIDAD AND TOBAGO NON DESTRUCTIVE TESTING OF FOUR (4) PROCESS TANKS AT COUVA SOUTH WWTP WELL SERVICES PETROLEUM COMPANY LIMITED RADIOGRAPHIC WORK-UMLE EXP

References

Related documents

There are factors that make the methods of this book slower (ini- tially, memorizing may take longer than reading, or HS may take longer than HT because you need to learn each passage

Đặc iệt trong lĩnh vực Y học, các hợp chất này đã và đang đƣợc nghiên cứu làm thuốc nhƣ thuốc kháng sinh, thuốc chữa cúm A, thuốc tim mạch…Nhiều hợp

H04: There is no difference in the odds of treatment completion between HIV-positive patients and HIV-negative patients among TB patients in Sierra Leone when adjusting

New ThinkPad X60s ultraportable notebook models with Vodafone Wireless Broadband Access include a three-year limited warranty Overview.. What ′

Storage Server Server Storage Data Center Fiber Access Network DSL DSLAM Cu OLT ONU Cabinet FTTN DSLAM Cu Broadband Network Gateways Tier 1 Network.. efficiency improvements

8 shows timeline and corresponding pause times for minor and major collections occurring during the course of executing indicative Reduce JVM runs.. Again, the top part of

recommendations, and have increased mortality with higher healthcare resource use than non-depressed counterparts. Depression identification and treatment are necessary to

In this section, an engineering case study about railway track asset management is provided to illustrate how uncertain information and condition monitoring data can be integrated