Summary Bill Group
AMOUNT IN USD
Bill 1 General 0.00
Bill 2 Site Clearance 0.00
Bill 3 Drainage 0.00
Bill 4 Earthworks 0.00
Bill 5 Gravel Wearing Course 0.00
Bill 8 Structures 0.00
Bill 9 Ancillary 0.00
0.00
PS Provisional sum (Insurance ) 18,000.00
Bill 10 Dayworks 0.00 18,000.00 0.00 18,000.00 Grand Total Subtotal
Grand total for bill items Contingency - 2.5% [to be expended in whole or in
part at the discretion of the Engineer]
Rate Amount
USD USD
1000 GENERAL 12
1200 GENERAL REQUIREMENTS AND PROVISIONS 12.01 Provision, erection, maintenance and removal of project sign
board as indicated in the drawing or instructed by the Engineer.
No
2 0.00 1300 CONTRACTOR'S ESTABLISHMENT ON SITE
13.01
The contractor's general obligations for all charges in respect of the establishment of the contractor's organization, camps, equipment ,personnel, contractors laboratory, accommodation and construction plant on the site, and their removal on completion of the contract, and also the financing costs, risks, legal,security arrangemnts and contractual obligations and general items of cost not covered elsewhere
L.S
1 0.00 16 1600 ENVIRONMENTAL PROTECTION AND
MITIGATION MEASURES 16.01
Environmental Protection and Mitigation Measures LS 1 0.00 TOTAL FOR BILL 1, 1000 GENERAL – PROVISIONS 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 1,General Provisions
Bill 1,General Provisions
Rate
Amount
USD
USD
2000 SITE CLEARANCE
21
2100: CLEARING AND GRUBBING
21.01
Clearing and grubbing
ha
8
0.00
21.02
Removal and grubbing of large trees and tree stumps
(a) Girth exceeding 1.0 m up to and including 2 m
No.
385
0.00
(b) Girth exceeding 2 m up to and including 3m
No.
150
0.00
(c) Girth exceeding 3 m and more
No.
30
0.00
TOTAL FOR BILL 2, 2000 Site Clearance (carried to
summary)
0.00
Description
Bill 2, Site Clearance
Bill of Quantity
Unit
Yambio-Nabiapai
Qty.
Bill 2, Site Clearance
Pay Item
No.
Rate Amount
USD USD
3000: DRAINAGE 31 3100: DRAINS
31.01 Excavation for open drains
(a) Common/normal and intermediate excavation or shaping of open drains (intercepting ditches, turn-outs, culvert in-/outlet drains, etc.) in all type of soil material of all class within any depth rates below the surface level, loading and hauling, and re-use in embankments incl. spreading, shaping and compaction to 95% of modified AASHTO density including all lead and lift within the project.
M3
8,500 0
32 3200: CULVERTS AND APPURTENANT STRUCTURES
32.01
Common/normal and intermediate excavation of trench within any depth rates below the surface level for foundation at new pipe culvert location or for replacement of existing culvert and for inlet and outlet structures incl. trimming/compaction of bottom of excavation, backfill with suitable material from the excavation and compaction, disposal of surplus and unsuitable material.
M3
230 0.00
32.02 Provide approved material for backfill at culvert location and compact incl. trimming/compaction of bottom of excavation.
(a) Using the excavated material M³ 216 0.00
(b) Using imported selected material M³ 505 0.00
32.03 supply, Installation, and placement of precast reinforced concrete pipe culvert 900mm diameter, with details shown on the drawings
M
84 0.00
32.05 Provide and construct apron/slab with cut-off wall (toe wall), and head and wing walls at box culverts and slab culvert including all ancillary works:
(a) Concrete Class 30/20 for apron/slab and cut-off wall (toe wall); M3 10 0.00
(b) High yield reinforcement steel for apron/slab and cut-off wall (toe wall) (Grade 60)
t
1 0.00
(c) Cement-mortared (1:3) medium pointed Class A stone masonry for head and wing walls of
slab culvert and/or drifts M3 20 0.00
34 3400: Pitching, Stonework, And Erosion Protection
34.01 Provide and construct cement-mortared 1:4 fine pointed Class A stone masonry for cascades, inlet and outlet structures for concrete pipe culverts, and where instructed including foundation and all ancillary works
M³
108 0.00
TOTAL FOR BILL 3, 3000 DRAINAGE (carried to summary) 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 3, Drainage Bill 3, Drainage