FINEST SOLUTIONS FINEST SOLUTIONS FINEST SOLUTIONS FINEST SOLUTIONS
Unique technologies for kiln plant, raw meal and cement grinding!
Josef Keuschnigg Josef Keuschnigg Josef Keuschnigg Josef Keuschnigg
RE-ENGINEERING THE KILN PLANT
Tapping into the full kiln potential Tapping into the full kiln potential Tapping into the full kiln potential Tapping into the full kiln potential
PM-TECHNOLOGIES
cyclone stage calciner 2-step meal chute system chloride-bypass & kiln inlet
TAILOR-MADE OPTIMISATION CONCEPTS
“A cyclone preheater’s basic equipment design is rarely a decisive factor for the functioning of the kiln plant, but rather the numerous details in the cyclone stages, the calciner and the lower preheater area.” BOTTLENECK ANALYSIS
EFFECTS AND MEASURES WHEN UPGRADING THE PLANT
Effects and measures Effects and measures Effects and measures Effects and measures
PLANT UPGRADE
INCREASED GAS FLOW RATES
- Pressure drop reduction of cyclone stages to increase the level of clinker output - Improved cyclone efficiency and low pressure drop
- Potential for increase in gas throughput of 30% to 40% by keeping the ∆p level
CLINKER QUALITY AND OUTPUT
- Kiln burner and cooler assessment, etc. (in collaboration with external partners)
OPTIMISED OPERATING CONDITIONS IN LOWER PH AREA - Reduction of dust re-circulation rate and build-ups
- Efficient chloride extraction via gas bypass system EFFICIENT HEAT GENERATION AND HEAT TRANSFER
- Good burnout with moderate of needed calciner residence time
CYCLONE STAGE OPTIMISATION
OPTIMISATION OF KILN PLANTS
OPTIMISATION MEASURES
- Cyclone solutions for maximum gas throughput
- Special key parts installed on the inside for high efficiency at low ∆p
- Re-designing of critical cyclone components and areas - Fluidic-optimized cyclone inlets and entrance bend units
Activities Activities Activities
Activities andandandand technicaltechnicaltechnical detailstechnicaldetailsdetailsdetails
PM-TECHNOLOGIES’ CYCLONE UPGRADE PACKAGE
- To ensure high cyclone efficiency and low pressure drop
- ∆p reduction potential of up to 50% when installing HURRITEC GV guide vanes
“Individual “Individual “Individual
“Individual solutions and solutions and solutions and the attention to detail solutions and the attention to detail the attention to detail the attention to detail are are are prerequisites are prerequisites prerequisites prerequisites when making high quality technical
when making high quality technical when making high quality technical
when making high quality technical modifications with a modifications with a modifications with a modifications with a maximum re
maximum re maximum re
maximum re----use of the existing equipment!”use of the existing equipment!”use of the existing equipment!”use of the existing equipment!” pre
s s u re d ro p 17 mbar 7,6 mbar -55% after ∆p STAGE 1 before
MI-CFD BASED INLINE CALCINER OPTIMISATION
Calciner Calciner Calciner
Calciner optimisationoptimisationoptimisationoptimisation
OPTIMISATION OF KILN PLANTS
- CFD-based burner positioning - Well chosen tertiary air inlets
Temperature oC
Oxygen (%)
FOCUS ON SIMULATION
- Position of meal inlets
PREHEATER MODIFICATION
- Top stage: cyclones, guide vanes HURRITEC GV, entrance bend units - Calciner + 0,6 sec residence time, rearrangement of burners
- 2step meal chute system with servo drive meal splitter - kiln riser duct with adjustable orifice and splash box
RESULTS
- pressure drop reduction at top stage: 21 9,5mbar - Improved calcination: 90% 98%
- Clinker production increase: +370 t/day - volumetric load of kiln: up to 5,4tpd/m³
OPTIMISATION OF KILN PLANTS
REFERENCE VENEZUELA
c lin k e r p ro d u c ti o n 2880 tpd 3350 tpd +16% before afterPH, calciner and cyclone PH, calciner and cyclone PH, calciner and cyclone
PH, calciner and cyclone optimisationoptimisationoptimisation, reference optimisation, reference , reference and results, reference and resultsand resultsand results
p re s s u re d ro p T o p s ta g e 21 mbar 9,5 mbar -55% after ∆p STAGE 1 before
TAPPING INTO THE FULL POTENTIAL OF GRINDING SYSTEMS
Tapping into the full potential of grinding systems Tapping into the full potential of grinding systems Tapping into the full potential of grinding systems Tapping into the full potential of grinding systems
PM-TECHNOLOGIES
TAILOR-MADE OPTIMISATION CONCEPTS
“the right ball charge in combination with a perfect separation is the most wanted target during an optimization phase.”
BOTTLENECK ANALYSIS
When re-engineering the separation system, all effects of the complete grinding system must be considered.
CLASSICLON
®- LEADING GENERATION OF CLASSIFIER
activities activities activities
activities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails
PM-TECHNOLOGIES
DESIGN CHARACTERISTICS
- various housing types for up to 5.500Blaine - proven drive-unit for stable operation
- patented technology for highest separation forces - “low-speed-rotor” technology = “low-wear-rotor”
ADVANTAGES
- highest classifying-efficiency
- proven technology at several references - stable plant operation
- low cost and easy maintenance
CLASSICLON
®- RETRO-FIT
CLASSIFYING AND GRINDING
HIGHEST TECHNICAL STANDARD FOR EXISTING CLASSIFIERS
- based on existing classifier-housing
- 1st, 2nd or 3rd generation classifier upgrades are possible
custom made design custom made designcustom made design custom made design
- re-use of existing cyclone-separators - existing fan and filter can be used further re
rere
re----use of existing equipment is possibleuse of existing equipment is possibleuse of existing equipment is possibleuse of existing equipment is possible
maximum economic upgrades due to maximum economic upgrades due to maximum economic upgrades due to maximum economic upgrades due to lololowlowww modification costs for equipment and building modification costs for equipment and buildingmodification costs for equipment and building modification costs for equipment and building!!!!
activities activities activities
REFERENCE GERMANY 2009: OPTIMIZATION OF CEMENT GRINDING SHOP
- new CLASSICLON DS classifier and HURRITEC ST for product separation - ball mill: enlargement of 2nd grinding chamber and adapted ball-charge
- improved roller press efficiency due to better operation conditions
ENGINEERING FOR CLASSIFYING/GRINDING PLANTS
C E M I 4 2 ,5 R (3 3 0 0 c m² /g ) 75 t/h 88 t/h +18% before after C E M I 5 2 ,5 N (4 14 0 c m² /g ) 43 t/h 68 t/h +58% before after
CLASSIFYING AND GRINDING
activities and technical details activities and technical details activities and technical details activities and technical details
- basic equipment: 1.700kW ball-mill (Ø3,0m) with 2nd generation classifier and 500kW roller-press
- scope of project: project coordination, detail engineering and delivery of new classifying system MODIFICATIONS
IMPACT HAMMER MILL
CLASSIFYING AND GRINDING
TECHNICAL DETAILS
- flow-optimized housing-design - upper and lower deflector plates
to reach internal material re-circulation for highest pre-grinding effect
patented design for highest pre patented design for highest prepatented design for highest pre
patented design for highest pre----grinding effectgrinding effectgrinding effectgrinding effect
activities activities activities
activities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails
gas inlet
material
charge
material + gas
outlet
- for integration in existing ball-mill systems - retro-fit of existing hammer mills is possible - perfect for tandem drying-grinding systems individual solutions
individual solutionsindividual solutions individual solutions
IMPACT HAMMER MILL NEW PROJECT VENEZUELA
CLASSIFYING AND GRINDING
activities activities activities
activities andandandand technicaltechnicaltechnicaltechnical detailsdetailsdetailsdetails Clay dry
Clay dryClay dry
Clay dry----grinding systemgrinding systemgrinding systemgrinding system
- Hot gas supply of preheater exhaust gas - Additional heat demand in wet season
with a hot gas generator
- Unique installation of impact hammer mill
- HURRITEC double dip tube Cyclone technology for low pressure drop
- Intermediate dry clay bin for easy handling of the system
- Upgrade of complete raw grinding system +40% output of up to 320t/h - Planned start up: middle of 2012
ACTIVITIES AND PRODUCTS: OVERVIEW
PM-TECHNOLOGIES
TAPPING INTO THE FULL POTENTIAL OF GRINDING SYSTEMS
GRINDING AND CLASSIFYING SYSTEMS
Neugasse 111, 8200 Gleisdorf, Austria
P: +43 / 3112 / 41990-00, M: [email protected], W: www.pm-technologies.at