EDW + FS, VS, VSE, GGL, GGU, GHL. EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions VAS

N/A
N/A
Protected

Academic year: 2021

Share "EDW + FS, VS, VSE, GGL, GGU, GHL. EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions VAS"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions

EDW +

(2)

If roofing underlay is used: Dress roofing underlay up around all four sides of the frame. Roof with counter battens shown for illustration purpose. For proper installation, remove cladding as shown

1

2

2

3

3

4

FS, VS, VSE

GGL, GGU, GHL

1

1

2

1b

2

1a

2

3

2

1

2

3

2

(3)

FS

Flashing procedure for Tiles or Metal Roof

1 Tiles or 2 metal roof should be chamfered if

necessary.

Install support battens for the bottom flashing. This will insure correct drainage of water off the bottom flashing.

1

2

Dress apron over roofing material.

Skylight FS: The bottom flashing section must be

placed between the underglass rubber gasket and the bottom frame.

After fitting the apron to the roofing material, give the apron a "down bend" as shown. This will ensure the apron lays tight against the roofing material.

max 45°

10

0mm

13

0mm

3

4

5

(4)

6

2

7

1

1

4

3

2

m

ax

20

mm

FS

VSE

Position bottom flashing section as shown and install battens to support joints if necessary. Nail bottom flashing to skylight using nails provided.

FS: The bottom flashing section must be placed

between the underglass rubber gasket and the bottom frame.

1 Slide side flashing sections to interlock with

bottom section.

2 Bend over flap and pin bottom flashing to

bat-ten/ underroof to secure.

FS, VS, VSE:

3a Attach side flashing sections to frame with

roofing nails provided.

GGL, GHL:

3b Bend over frame flaps to secure.

FS, VS, VSE

GGL, GGU, GHL

m

ax

20

mm

3a

3a

(5)

6.1

6.2

Replace cladding as shown

Replace cladding as shown

FS, VS, VSE

GHL

2

2

1

4

3

3

2

2

1

GGL, GGU, GHL

8a

8b

(6)

16

mm

9

10

1

2

1 Install extra batten above the skylight to

sup-port the saddle flashing.

2 Attach saddle flashing by engaging and

bending flaps as shown and secure with clips if necessary.

If tiles:

3 It may be necessary install the optional tile

support supplied with the flashing.

1 Stretch out pleats.

2 Fold ends of apron over to form water return. 3 Dress apron over roofing material.

1

2

(7)

10a

30-60 mm

11

60-150 mm

Trim foam gasket and flatten upstands on side sections as necessary. Make a slit above each tile to allow foam gasket to seal against underside of tile. Maintain distance to frame as shown; cut tiles if necessary. To make tile lie correctly it may be necessary to remove neck on tile and flatten the returned edge around the battens.

Trim the foam gasket in height to allow it to seal against underside of tiles.

Arrange tile support and bend strips to hold it in place.

Position roofing material maintaining 60-150 mm distance at top.

(8)

10b

To allow the metal sheets to lie correctly, it may be necessary to:

1 Flatten down the flashing on the sides right

next to the bottom corners.

2 Trim foam gasket at sides and 3 at top

4 Flatten down edges of flashing as shown.

Fit remaining metal sheet maintaining 30-60 mm distance at sides of frame and 60-150 mm at top. No nails or screws should penetrate in the area of the flashing

30-60 mm

60-150 mm

Flashing procedure for metal roof only

1

2

(9)

Cut the metal sheets taking care to maintain the correct distance from the course of metal sheets to skylight frame. Overcut at both sides below skylight to allow for full width of lead apron to come through metal sheet.

Note that the cut must end on top of the highest point of the profile.

1

100 mm

30-60 mm

30-60 mm

60-150 mm

W

W

H

H

270 mm

2

3

1 Fit top flashing section under the existing metal

roof before laying the frame in position. Take care to maintain 30-60 mm distance from sides of frame to metal roof, 100 mm below and 60-150 mm above skylight.

Check level at bottom of frame and fix the angle brackets on the skylight to the rafters .

(10)

4

5

6

Fit the side flashing sections under the existing metal roof and the top flashing section.

Make sure that the metal sheets and all the flashing parts will be sup-ported by battens/purlins.

Cut foam down to level of underside of metal roof-ing to ensure that roofroof-ing lies flat.

Fit the bottom flashing section under the existing metal roof and nail this to the frame. To ensure the apron lays tight against the roofing material, give the apron a "down bend" after fitting it to the roofing material, see page 3 step 5.

Replace the frame coverings and secure the top flashing section.

1 The flashing area at the corners – between the

side frame and the high upstand on the bottom flashing section – is flattened down to the level of the battens.

2 Shape a filler piece from the cut-out for the

skylight and fit this tight into the overcut.

3 Fasten the filler piece with rivets and seal

pinholes at the end of the overcut with silicone. No nails or screws should penetrate in the area of the flashing.

(11)
(12)

AUS: VELUX Australia Pty. Ltd

1300 859 856

NZ:

VELUX New Zealand Ltd.

LA

S h IN g E D W . ©2 0 0 9 V EL U X g R o U P ® V EL U X A N D T h E V EL U X L o g o A R E R Eg IS T ER ED T R A D EM A R k S U S ED U N D ER L IC EN C E B y T h E V EL U X g R o U P

References

Related documents

H Quick installation assured through roofing frame for roof integration mounted on the collector, with flexible connections and lifting eyes.. H Type meets the requirements of

Roofing Terminology: Refer to ASTM D1079, glossaries in RTI/WSRCA's "Concrete and Clay Roof Tile Design Criteria Installation Manual for Moderate Climate Regions," and

On October 25, 2010, BredoLab infrastructure was terminated and taken offline. The NHTCU successfully connected to the backend panel located on one of the C&C servers

A. Yes. B. No, the quarter-time employees will have the greatest amount deducted from their paychecks. C. No, the half-time employees will have the greatest amount

For our example we have used the “four on tools” premium and have assumed that a plumbing firm of that size would have an annual turnover of approximately $500,000. We have also

Lighting types located and identified based on their high resolution spectral signatures in the imaging spectrometer data included high and low pressure sodium, metal halides,

KEY TERMS archive attribute ATTRIB AUTOEXEC.BAT batch file boot CD command interpreter command prompt COMMAND.COM CONFIG.SYS COPY COPY CON device driver DIR directory DOSKEY ECHO

Serum samples derived from these animals at 2 week after last vaccination were analysed by anti-PA IgG titer and TNA assays and their serological titers were compared with the