• No results found

Site Layout

N/A
N/A
Protected

Academic year: 2021

Share "Site Layout"

Copied!
38
0
0

Loading.... (view fulltext now)

Full text

(1)

By

By

Dr

Dr. Mah. Mahdidi DamghaDamghanini

Site layout

(2)

Eff 

Eff iicciieenntt llaayyoouutt ppllaannnniinngg oof f  aa ccoonnssttruruccttiioonn ssiittee iiss f f unundadamementntalal toto

aannyy ssuucccceessssf f uull pprroojjeecctt uunnddeertrtaakkiinngg.. TThhiiss ttaasskk uussuuaallllyy ccoonnssiissttss oof f 

identi

identif f yyiinngg tthhee temtempoporrararyy ffacacililitiitieses nneeeeddeedd ttoo ssuuppppoortrt ccoonnssttruruccttiioonn

ooppeerraattioionns,s, ddeetteermrminininingg ttheheirir sisizeze anandd shshapapee,, anandd ppoosisittiioonniningg tthehemm iinn tthhee ununooccccuuppieiedd arareeasas wiwitthhinin tthhee sisittee bobouunnddarariieess..

(3)
(4)
(5)
(6)

N

(7)

Factors involved in site organisation: Factors involved in site organisation:

1-1-The layout oThe layout of f the contractors temporarythe contractors temporary f f acilitiesacilities 22- A-Assembling the various resourcesssembling the various resources

(8)

Wh

(9)

L

Layout of temporary facilities (TFs)ayout of temporary facilities (TFs)

1-1- AAccess and exit arccess and exit arrangementsrangements 22--Temporary roadsTemporary roads

33-- location olocation of f hutmentshutments

44- P- Positioning oositioning of f static plantstatic plant 55-- Material storage areasMaterial storage areas 66- S- Site securityite security

(10)

Wh

What are tat are thhe factors te factors thhat need to be considered forat need to be considered for

access and exit ar

(11)

A

Access and exit arrangementsccess and exit arrangements

1-1-The number (keep to minimum)The number (keep to minimum)

22- L- Location (ocation (avoid busyavoid busy, narrow high , narrow high speed roadsspeed roads)) 33- W-Width oidth of f access (not less than 5 m)access (not less than 5 m)

44- R- Routing (outing (1-1-way is preway is pref f erable,erable, f f orces to have another oneorces to have another one f f or exit)or exit) 55- C- Crossross--oovversers to tto thehe f f ootpathootpath

(12)

N

Name some of tame some of thhe construction materials for temporarye construction materials for temporary

roads ??? roads ???

(13)

onstruction materials for temporary roads onstruction materials for temporary roads

1-1- HHardcore oardcore of f a wide varietya wide variety 22--Timber sleepersTimber sleepers

33-- Metal trackMetal track 44- P- Plastic sheetlastic sheet

aa)) MMiinniimmuumm bbeenndd  b)

 b) AAwaywayf f rromom scscaaff ff oldoldinging,, ooveverherheadad cacablbles,es, excexcavavatationionss oror othotherer temtempoporaryrary woworksrks..

c)

c) SShouhouldld bebe rerepaipairedred..

d)

(14)

T

Tememppoorararyry ttruruckck enenttrarannccee aatt ccononsstrtrucucttioionn sisittee pprroovividdeses alalll--weatherweather

(15)
(16)

Wh

(17)

H

Hutment requirementsutment requirements

1-1- Mess roomsMess rooms 11 mm22 per persoper person (socialin (socialisatisationon poinpoint)t) 22- O- Off ff ices 4 mices 4 m22 per personper person

33-- Minimum Minimum ceiling ceiling height height 2.4 2.4 mm 44- W-Window area 20% oindow area 20% of f  f f loor arealoor area

55- O- Opening window areapening window area 110% o0% of f  f f loor arealoor area 66- K- Kept cleanept clean

77- H- Have properave proper f f oot pathoot path

88-- Buildings 2 m apartBuildings 2 m apart f f oror f f ire precautionsire precautions

L

Location ocation on site on site for temfor temporary accommodation:porary accommodation:

a)

a) PPermanentermanent f f or duration oor duration of f contractcontract

 b)

 b) AAdjacent to services, electric, water, drains, telephonesdjacent to services, electric, water, drains, telephones

c)

c) CClose to the site entrancelose to the site entrance

d)

d) CClearlearf f rom setting out lines and excavations etcrom setting out lines and excavations etc

e)

e) CClear olear of f overhead workoverhead work f f )) HHave clear view oave clear view of f the sitethe site

g)

(18)
(19)
(20)

N

(21)

S

Static planttatic plant

1-1-TTower cower craranesnes

22- C- Concrete batching plantoncrete batching plant 33- H- Hoists «oists «

Make the horizontal movement o

Make the horizontal movement of f material to minimummaterial to minimum S

Slewing operation must be kept to minimumlewing operation must be kept to minimum

S

Should be located whereby the transportationhould be located whereby the transportation

di

diststanancece isis rereduducecedd toto mimininimumum.m.AAccccesesss toto

V

(22)

Wh

What is tat is thhe purpose of site security???e purpose of site security???

F

For hutsor huts F

(23)

S

Site securityite security The need

The need f f or site security is dependant upon:or site security is dependant upon:

1-Th

1-The nature of work being carried oute nature of work being carried out

22-- ThThe location of te location of thhe sitee site

33-- ThThe economics involve economics involved ed 

The purpose o

The purpose of f security:security:

1-

1- I I nternal nternal 

22- Ex- External ternal 

E

Employees should be encouraged to see that the place omployees should be encouraged to see that the place of f work iswork is

made secure: made secure:

1-

1- H H andtoolsandtools

22-P -P ortable power toolsortable power tools

33- M - M aterialsaterials

44- P - P rotective clotrotective clothhinging

(24)

E

Explain txplain thhe importance e importance of fencing andof fencing and hhoarding???oarding??? Wh

(25)

Fence and

Fence and HHoardingsoardings

1-1- AA f f eennccee oorr hhooaarrddiinngg ((hheeiigghhtt==22..22 mm)) sshhoouulldd bbee eerreecctteedd aarroouunndd tthhee ssiittee

ttoo pprreevveenntt tthhee ppuubblliicc f f rroomm wwaannddeerriinngg oonnttoo tthhee ssiittee oorr ttoo pprrootteecctt tthheemm f f rromom bbuiuilldidingng wwororkk asas ththiiss hahass llegegalal imimppllicicaatitioonsns....

22-- IIn city centre sites hoardings would be used.n city centre sites hoardings would be used.

33-- TheThe LLocalocalAAuthority must be inuthority must be inf f ormed oormed of f the duration whichthe duration which

hoardings are to be in pl

hoardings are to be in place, ace, dradrawings must be submitted wings must be submitted showingshowing construction.

construction.

44-- PPermission must be obtainedermission must be obtained f f rom the highways dept. and therom the highways dept. and the PPoliceolice

f f or any tor any temporaremporary pavement crossy pavement crossinging. . The cThe cost ost oof f reinstating thereinstating the

pav

(26)
(27)
(28)

E

Explain txplain thhe effect of e effect of hhaving wireless system onaving wireless system on

construction site??? construction site???

(29)

M

Maannyy ccoonnssttrruuccttiioonn ccoommppaanniieess ccoommmmuunniiccaattee bbeettwweeeenn bbuuiillddiinngg ssiitteess aanndd hheeaaddqquuaarrtteerrss dduurriinngg tthhee ccoonnssttrruuccttiioonn pprroocceessss ttoo sseett de

deadadlilinneses,, momonniitotorr prprogogrresesss aanndd ttrraannssf f eerr ddaattaa.. TThhiiss

nneettwwoorrkkiinngg eennaabblleess ccoommppaanniieess ttoo rruunn aa mmoorree eeff ff iicciieenntt ccoonnssttrruuccttiioonn

project. project.

(30)

eettaaiilleed

d aatttteen

nttiio

on

n tto

o tt

hh

ee llaay

y--o

ou

utt o

off tteem

mp

po

orraarry

y

ffaacciilliittiieess iiss rraarreelly

y aa w

waassttee o

off ttiim

mee,, aan

nd

d u

ussu

uaalllly

y

re

resu

sult

lt in

in co

cons

nsid

ider

eraab

ble

le sa

savi

ving

ngs.

s.

T

T

hh

ee p

pllaan

nn

niin

ng

g o

off aa ssiittee llaay

yo

ou

utt iin

n p

prraaccttiiccee w

wiillll

d

deep

peen

nd

d u

up

po

on

n aa n

nu

um

mb

beerr o

off ffaacctto

orrss ssu

ucc

hh

as

as tt

hh

ee

ttiim

mee aan

nd

d m

mo

on

neey

y.. T

T

hh

ee n

neeeed

d ffo

orr ccaarreeffu

ull ssiittee llaay

yo

ou

utt

aan

nd

d ssiittee o

orrg

gaan

niizzaattiio

on

n p

pllaan

nn

niin

ng

g b

beecco

om

meess m

mo

orree

rreelleev

vaan

ntt aass tt

hh

ee ssiizzee aan

nd

d cco

om

mp

plleex

xiitty

y o

off tt

hh

ee

cco

on

nst

stru

ruccttiio

on

n o

ope

perraattiio

on

n iin

nccre

reaase

ses,

s, aan

nd

d eesp

spec

eciiaall

lly

y

w

(31)

ommon facilities to

ommon facilities to be consideredbe considered

1-1- AAccess/exit pointsccess/exit points 22--Temporary roadsTemporary roads 33- H- Hutmentsutments

44- S- Static planttatic plant 55- S- Storage areastorage areas 66- S- Site securityite security

(32)
(33)
(34)

The

(35)
(36)
(37)
(38)

U

seful

W

ebsite:

http://www.civilcra

tstructures.com/construction

References

Related documents

M/W/F or T/TH These homes are open EITHER Monday, Wednesday, Friday, OR

2 Pre-Stressed, Post-Tensioned Concrete 10 Structural Wood Construction (Wind & Seismic) 3 Structural Steel Construction and High Strength Bolting. 4 Structural Welding 11

In this paper, we consider an elliptically polarized plane wave incident on the stratified material, we show the two possible representations of a complex wave vector in a lossy

The $150K - $200K price range has the highest number of off-market listings at 63 properties.. "Current inventory is described as

The programs must be original (not some other author's code or direct translations of programs from other machines) and your name and address must be somewhere

Phenolic compounds and its antioxidant activity of extracts from seven cultivars of Chinese jujubes were investigated by high performance liquid chromatography (HPLC) with standards

We will show in this paper that an MCMC based method is signif- icantly more efficient than a direct sampling method, for weighted sampling where the probability distribution vector

H Check type of organization X Section 501(c)(3) exempt private foundation Section 4947(a)(1) nonexempt charitable trust = Othertaxable private foundation I Fair market value