• No results found

BIM extension for the sustainability appraisal of conceptual steel design

N/A
N/A
Protected

Academic year: 2020

Share "BIM extension for the sustainability appraisal of conceptual steel design"

Copied!
29
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Activities in feature based modelling [32]
Table 1: Main criteria of assessment tools (Modified after [46])
Figure 2: Implementation Requirements
Figure 3: Column mappings in the Feature database
+7

References

Related documents

It should be noted that, the RM in [14] has been solved with the primal Benders decomposition algo- rithm (PBD) in[14].Also, the SM in [13] has been solved with the general

Intervertebral disc disease [IVDD], lumbosacral, chronic Intervertebral disc disease [IVDD], thoracolumbar, acute Intervertebral disc disease [IVDD], thoracolumbar, chronic

Finally the aims of this study to determine the indicators of evaluate of children with mathematics learning disabilities, the level of visual discrimination

The primary objective of this study was to compare time to clinical stability in patients with MRSA VAP treated with linezolid versus vancomycin. Secondary objectives were: 1)

2 Major in Interdisciplinary Science and Engineering, Shimane University, Matsue, Shimane, 690-8054, Japan.. Copyright c 2015 Seto and Kuroiwa. This is an open access

Furthermore, in a widespread early inference that persists to this day, many also adjudged that because of Halutz’s initial choice of a strategy that forwent any significant use

• Accelerated, partially guaranteed Modra renta: Accelerated, partially guaranteed Modra renta: Life-long Life long pension annuity with accelerated pay-out and a guaranteed monthly

Melexis with Triaxis sensor is the main supplier for 3D/Joystick application hall effect