PROPOSAL

Date 4/1/2014

Proposal # 12007

Name / Address Bonnette Page & Stone 91 Bisson Ave.

Laconia, NH 03246

Ship To

Golden Brook School 112B Lowell Rd.

Windham, NH 03087

All-Bright Systems, LLC

5 Brookhollow Drive Salem, NH 03079 (TEL) 603-893-7989 (FAX) 603-894-6696

Total

We hereby propose to furnish the materials and perform the labor necessary for the completion of ACOUSTICAL CEILINGS

All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work with payments to be made as follows:

Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the proposal. Workman's Compensation and Public Liability Insurance on above work to be taken out by The Travelers Insurance; $2 mil.

ACCEPTANCE OF PROPOSAL

The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Date: Signature:

Respectfully submitted per

Steven F. Barretto, Manager Michael J. Roscoe, Senior Estimator Note - This proposal may be withdrawn by us if not accepted within days.

Description Total

Supply and install approximately 8,184 square feet Armstrong Cortega #769A, 2' x 4' lay-in tile; with Chicago Metallic 200 Snap-Grid, 15/16", White.

15,900.00

$15,900.00

(2)

1

Barry Beauregard

From: Karen Libersky <[email protected]>

Sent: Wednesday, April 02, 2014 9:38 AM

To: Barry Beauregard

Subject: golden brook school

24 - harvey classic white vinyl double hung windows.

*** glass to be low e insulated / tempered in bottom sash *** applied new construction J molding

*** full screens

*** water shield tape around nailing fins

furnished and installed = $11,760.00

Karen A. Libersky

All Door & Lock/Glass & Mirror 61 Airport Dr.

Rochester, NH 03867 (603)335-5881

(603)335-6312 fax

(3)

254 Peacham Rd.

Center Barnstead, NH 03225

Bob Daniels Electric

Phone: 603-455-5544

Bid Proposal

JOB-0066: Golden Brook School

BONNETTE PAGE & STONE 91 BISSON AVENUE LACONIA, NH 03246 Attention: KEITH MCBEY

8 April 2014

Golden Brook School Winham

112B Lowell Rd ,

We are pleased to quote the Electrical Installation on the above referenced project as per plans and specifications and specifically 1 Drawings, dated 3/24/2014 , with latest revision date with 1 Addenda, with the following qualifications and exclusions:

Re: Proposal for Golden Brook School

1. Permit Fee is included.

2. All wiring to meet the requirements of the 2011 National Electrical Code.

3. No back charges for clean up will be accepted unless prior written notice and forty eight hours has been given to comply.

4. Price includes installing customer supplied fixtures and supplying new bulbs. Re-installing customer supplied speakers and running existing data lines with surface mounted conduit.

Qualifications:

1. Utility Company Charges.

2. Trenching, backfill, concrete, cutting, patching, coring and roof penetrations.

3. HVAC and Mechanical, controls, control wiring and starters.

4. Performance Bonding.

5. Temporary power.

6. Equipment terminations

7. Omissions from Electrical Drawings or Specifications.

Exclusions:

Pricing:

For the Sum of $9,091.84

We would like to thank you for the opportunity to quote this project. If you have any questions, please call us.

Sincerely,

Robert Daniels Bob Daniels Electric

ConEst Software Systems Page 1 of 1

(4)

254 Peacham Rd.

Center Barnstead, NH 03225

Bob Daniels Electric

Phone: 603-455-5544

Bid Proposal

JOB-0067: Golden Brook School Alternate

BONNETTE PAGE & STONE 91 BISSON AVENUE LACONIA, NH 03246 Attention: KEITH MCBEY

8 April 2014

Golden Brook School Alternate Winham

112B Lowell Rd ,

We are pleased to quote the Electrical Installation on the above referenced project as per plans and specifications and specifically 1 Drawings, dated 3/24/2014, with latest revision date with 1 Addenda, with the following qualifications and exclusions:

Re: Proposal for Golden Brook School Alternate

1. Permit Fee is included.

2. All wiring to meet the requirements of the 2011 National Electrical Code.

3. No back charges for clean up will be accepted unless prior written notice and forty eight hours has been given to comply.

4. Price includes all new fixtures and bulbs for energy efficiency.

Qualifications:

1. Utility Company Charges.

2. Trenching, backfill, concrete, cutting, patching, coring and roof penetrations.

3. HVAC and Mechanical, controls, control wiring and starters.

4. Performance Bonding.

5. Temporary power.

6. Equipment terminations

7. Omissions from Electrical Drawings or Specifications.

Exclusions:

Pricing:

For the Sum of $18,302.97

We would like to thank you for the opportunity to quote this project. If you have any questions, please call us.

Sincerely,

Robert Daniels Bob Daniels Electric

ConEst Software Systems Page 1 of 1

(5)

Proposal

BT Acoustics PO Box 53

New Hampton, NH 03256 603-387-5450 (Cell)

603-744-2067 (Home)

DATE: April 8, 2014

Invoice To:

Bonnette,Page & Stone 91 Bisson Ave.

Laconia, NH 03246

RE: Golden Brook School

Att. Barry Beauregard

DESCRIPTION AMOUNT

Installed of approximately 9520 square feet of 2X4 acoustical ceiling grid and tile.

.

Areas to include:

 Class Rooms and Bathrooms:

101,102,103,104,105,106,107,108,109 and110

 All Hallways

Materials to be used,

Chicago Metallic Grid 15/16

2x4 Armstrong Ceiling Tile #769-A

Total cost for materials and labor:

$20,137.00

If you have any questions concerning this proposal, please contact Bob Temple at 603-744-2067 or 603- 387-5450.

(6)

April 7, 2014

Bonnette Page & Stone 91 Bisson Ave

Laconia, NH 03246 Attn: Barry Beauregard

Re: Golden Brook School Modular Facility Reconstruction, Windham NH

Dear Barry,

Daniels Electric Corporation is pleased to provide the following design build proposal for electrical work at the above-referenced project per Reconstruction Phase III Scope. We acknowledge Addendum #1.

Scope of Work

 Permits

 Reinstallation of existing light fixtures. All fixtures to be cleaned and re-lamped. Pricing is based on all new MC cable above suspended ceilings to rewire fixtures.

 Reinstall existing Fire Alarm System devices on existing wiring. Devices to be installed into new ACT ceilings.

 Reinstall existing Intercom speakers. Existing wiring to be reused where applicable. New wiring is included as required.

 Reinstall existing Data wiring and jacks as applicable. New CAT5e cable and jacks is included where required.

Total Cost $ 15,640.00*

Add Alternate- Replace the existing fixtures with new Super T8 High efficiency fixtures with lamps as specified.

Total Added Cost $ 10,500.00*

Exclusions from Scope of Work

 Municipal/Utility fees

 Replacement of any existing panels that are not code compliant

 Cutting and Patching

 Supply of Tel/Data Patch Panels, racks etc.

Respectfully Submitted,

Carl Olsson, Project Manager

P.O. Box 7412 • Gilford, New Hampshire 03247

Office (603) 293-4707 • Fax (603) 293-7507 • E-mail: [email protected]

(7)
(8)
(9)

GODIN ASSOCIATES, INC.

1721 Carl Broggi Highway Lebanon, Maine, 04027

Ph: (207)-339-8869 Fax: (207)-339-0508

April 8, 2014

Keith McBey/ Barry Beauregard Bonnette, Page & Stone Corp.

Laconia, NH

Golden Brook School Modular Facility Windham, NH

Furnish and install two layers of 5/8” type X gypsum wallboard at corridor

ceilings and one layer of 5/8” type X gypsum wallboard at classroom ceilings per plans and job site walk thru. GWB ceilings to attach to underside of truss cords

Wrap ceiling beams with 5/8” type X gypsum wallboard, as discussed at walk thru. (Two layers in corridor, one layer in classroom).

Price also includes 6” thermal batt insulation, 6 mil poly vapor barrier, and 5/8”

gypsum wallboard where drywall was removed above and below windows in each classroom.

Window jambs and head to be wrapped with GWB as discussed at walk thru.

(Window sill to be by others).

New exposed drywall to receive three coats joint compound, taped and sanded, ready for primer. Gypsum wallboard sub ceilings to be flat taped only.

Proposed Price: $ 23,350.00

Exclusions:

No patching of existing walls other than mentioned above.

No fire caulking, sound caulking, or similar.

No floor protection.

No wood blocking, wood framing or plywood.

No primer or paint.

No temporary power or lighting.

No vinyl covered drywall.

No dumpster(s).

Thank you.

Pierre Poligni

(10)

April 2, 2014

Bonnette Page & Stone 91 Bisson Avenue

Laconia, NH 03246-2704 Attn.: Mr. Barry Beauregard

PROJECT: Golden Brook School Modular; Windham, New Hampshire

3000 p.s.i; ¾" Aggregate $88.00 4000 p.s.i; ¾" Aggregate $92.00

Escalation: Add $5.00 per cubic yard January 1, 2015

WINTER CONCRETE is charged at $6.00 per cubic yard from November 1 through April 15 for heated concrete.

CEMENT factor increases or decreases will be adjusted at actual cost of 7.0 cents per pound.

ADMIXTURES not named above will be charged at the current standard rate; no extra charge for air entrained concrete.

TERMS: Net 30 days. Finance charge of 1 ½% per month (18% per annum) charged on all past due accounts. Buyer agrees to pay all costs of collection including reasonable attorney’s fees.

PRICES are per cubic yard of ready-mixed concrete and are guaranteed against increase thirty days from the above date or thirty days from the date of bid opening.

COMPRESSIVE STRENGTH where referred to, unless otherwise noted, is at 28 days when the concrete is handled, placed, cured and tested in complete accordance with applicable ASTM and ACI standards and recommendations.

MATERIALS unless otherwise stated, are from our standard aggregate and cement sources. We cannot guarantee color or be held responsible for color variations. We assume no liability for ready mixed concrete to which materials have been added that were not supplied by us.

CONTROL COST is to be assumed by others and, as a building material supplier; we cannot assume responsibility for concrete beyond our control.

TAXES that are or may be levied by the United States Government or any State or City on the materials quoted herein shall be added to the prices named.

DELIVERY will be made Monday through Friday between the hours of 8:00 a.m. and 4:30 p.m. in minimum loads of 6 cubic yards (part load charge is $50.00 for each yard less than 6 cubic yards). Five minutes per cubic yard is allowed for unloading, beyond this period waiting time is charged at $1.50 per minute. Prices for Saturday, Sunday, or Holiday deliveries will be negotiated. The purchaser is responsible for providing reasonable access to the jobsite for a concrete delivery truck.

AGREEMENTS are subject to strikes, fires, or other conditions beyond our control.

ACCEPTANCE by an authorized representative of the company named above is required prior to delivery.

Granite State Concrete Co., Inc.

_______________________________

Alexander D. MacLellan

Accepted EMM

(11)

659 Currier Rd, Hopkinton, NH 03229  Phone: 603-224-7474  [email protected]

April 08, 2014

Keith Mcbey

Bonnette, Page & Stone Corporation 91 Bisson Avenue

Laconia, NH 03246 RE: Golden Brook School

The purpose of this letter is to present our estimate for the above referenced facility. This estimate is based upon the information located on your Procore website, addendum-01 dated 04/03/14 and a walk- thru at the facility. We propose to re-install electrical systems, lighting fixtures, devices and branch wiring as per the above mentioned documents as well as the following proposal qualifications.

Base Scope;

 Install new T12 lamps in the (132) existing lighting fixtures and re-install lights into the new ceilings as requires. Includes new branch wiring back to the existing switch locations.

 Re-install existing fire alarm devices as necessary. Existing fire alarm system is believed to be in good working order, therefore, no additional fire alarm equipment or programming is included in this proposal.

 Re-install existing ceiling speakers, data jacks and intercom devices.

 Re-support existing ceiling wiring as required.

Base Cost: Eleven Thousand Eight Hundred Eighty Dollars ($11,880.00)

Add Alternate-01;

 Cost adder to furnish and install (132) new lighting fixtures as specified.

Add Alt Cost: Nine Thousand Seven Hundred Fifty Dollars ($9,750.00)

PLEASE NOTE, if design drawings or as-built drawings are required in AutoCAD format, all necessary AutoCAD drawing files shall be supplied to our design department at no cost. This proposal is based on all work performed during normal working hours (M-F, 7:00-3:00). This proposal has been adjusted for a 30 day period from this date.

NOTES:

We exclude all cutting, patching, painting, core drilling, concrete work, fire stopping, fire alarm system, security alarm system, control wiring, electrical engineers review/stamp, engineering/design & provision of seismic restraint systems and all permanent and/or temporary utility company charges (ie; power, telephone, fire department, cable tv, etc.).

Any additional work requested by the owner, the Town of Windham and/or the State of New Hampshire not shown will be performed on a time and material basis or change order. If you have any questions or concerns, please feel free to call Mike Hayes @ 603-224-7474.

Sincerely,

Michael Hayes

Michael Hayes

(12)

BouNgTTE, Pacs & Sroxn CoRpoReTIoN 9I BISSON AVE].{[IE, LACONIA, NH 03246 T E L : 6 0 3 . 5 2 4 . 3 4 1 1 F a X : 6 0 3 . 5 2 4 . 4 6 4 1

Cenelal Contractors, Construction Manargels lbr Dcsigpr / lSuilcl ot'Plrlllic and Pdvate Rr-rilctings

RECONSTRUCTION SCOPE - PHASE III

M a r c h 2 1 , 2 0 1 4

RE: Golden Brook School - Modular Facility Reconstruction 1128 Lowell Road

Windham, New Hampshire 03087 Sub-Contractor:

Note: Please Refer to Reports and "Modular Bid - Phase lll" plan for additional i nformation

SCOPE: DiVision 7

o See Roofing Scope

. Provide and install new air barrier system as described in T&L report complete SCOPE: Division 8

o Provide and install new windows (specification to be determined) SCOPE: Division 9

. Provide 6" batt. Insulation with 6 mil poly vapor barrier at all wall repairs . Provide and install new gypsum hardboard at all wall repairs

. Spray foam underside of existing roof deck (closed cell - 7.S"deep) . Spray foam all eaves and rakes (closed cell - 7.S"deep)

. lnstall 5/S" typical gypsum board (fire rated) in all classrooms. Tape on the underside of trusses (1 layer)

o Install 5/S" typical gypsum board (fire rated) in all hallways, Tape on the underside of trusses (2layer with staggeredjoints)

. Install new suspended acoustical ceiling system (Armstrong 7694 tile with 15116 grid)

. Prime and Paint ALL exterior walls in classrooms after repairs

o Install new vinyl siding at exterior of building, including skirting (CertainTeed Monogram 46 or equal)

o lnstall new trim at exterior of building (use Azek on eaves only) \ SCOPE: Division 16

o Provide electrical support during reconstruction

. Carry all materials and labor to re-wire existing lighting to panel complete o Re-install existing liilhtinq fixtures in ACT ceiling

o Fire alarm work as necesbary to maintain properly working system

(13)

SCOPE: Division 17

o Remove wall sheathing gypsum below and above windows at all exterior windows . Remove insulation and flooring under modular units (carry allowance for

approximately 2,000 SF of removal)

o Remove existing exterior vinyl siding, trim, skirting o Remove existing exterior air banier

Bid work'4*tj

#^,r lT ,

Llu ('DD

Exclusions:

End of bid form

ni-

. 1 !

(14)
(15)
(16)

General Conditions -Based on 3 Weeks ?

(17)

-No Allowance pricing for site &

walkway canopy

-What is carried under 06-600?

Siding?

-Is the Air Barrier included?

-Spray foam options are different than discussed in scope/addendum

(18)

-Gypsum drywall NOT carried at ceilings in classrooms or hallways -09-910 Gypsum drywall appears to be replacing walls?

-No allowance pricing for Mechanical

(19)

-No contingency is carried -CM fee appears to be 7%

-Carpet is ADD alternate, not included in base

-No VCT replacement appears to be carried

(20)
(21)
(22)
(23)
(24)

SALESMAN:

JOB:

LOCATION:

AMOUNT 1 CEILING AREA FLAT

2 EAVES 3 EXT. WALLS

4 TOTAL $16,100.00

5 OPTION # 1 (+)$260.00

SALES REPRESENTATIVE ACCEPTED BY:

___________________________

110 Perimeter RD Nashua, NH 03063

LOW EXPANSION POLY CELL FOAM AROUND WINDOWS/DOORS 4/7/2014

R-38 KRAFT BATT INSULATION AT UNDERSIDE OF ROOF DECK

R-21 6" UNFACED BATT INSULATION W/ 6 MIL POLY VAPOR BARRIER

DATE:

PROPOSAL

INSULATION

JOB DESCRIPTION BONNETTE, PAGE, & STONE

7.5" OF CLOSED CELL SPRAY FOAM TO:

ITEM

FAX (603) 889-3385 TEL (603) 889-6647

DAVID HUBERT GOLDEN BROOK SCHOOL

WINDHAM, NH

(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)

References

Related documents

In 2008 the study HIV prevalence was significantly higher than the labour ward prevalence (p&lt;0.001). Figure 4.9 shows the number of known and additional theoretical number of

support, VLAN support, auto-uplink (auto MDI/MDI-X), IGMP snooping, traffic shaping, manageable, Spanning Tree Protocol (STP) support, Rapid Spanning Tree Protocol (RSTP)

Lord God, whose blessed Son, our Savior, gave his body to be whipped and his face spit upon: Give us the grace to accept joyfully the suffering of the present time, confident of

In this research paper we tried to developed the security strategy for E- Governance of the government by using fuzzy logic expert system because each and every

People with disabilities can accomplish what people with typical abilities can accomplish; they just may do things differently. This statement is true not only with apparent

Yoshio Hamanishi: Yoshio Hamanishi: Hamanishi Betty, Akizuki Eiko, Akizuki Russ, Akune Roy &amp; Itoko, Atagi Misao, Hamaura Masako, Doi Peter &amp; Louise, Egami Kazue, Guy

Ved ikke Batteri enkeltsvar - Randomiser 1-9 Sp.10 Når du køber hver af følgende varer til din husstand, hvor ofte køber du da varen som økologisk1.

This Guide includes a list of subfields (focus areas) and the corresponding electives within each focus area that are offered through the Department of Electrical and