• No results found

Petrel Data Cleanup. For Studio. 1

N/A
N/A
Protected

Academic year: 2021

Share "Petrel Data Cleanup. For Studio. 1"

Copied!
34
0
0

Loading.... (view fulltext now)

Full text

(1)

Petrel Data Cleanup

For

Studio

(2)

Real World Examples and Workflow Details

www.roqc.no 2

•GdF Suez Example - Petrel REF to Studio

•Petoro Example - Petrel REF cleanup

•Workflow & Tools

(3)

GdF Suez Example Petrel REF

to

Studio

(4)

29/09/2014 4

• Petrel Studio deployment, first impressions and way forward

• Jan Willem Achterberg

• GDF SUEZ Norway

(5)

• Overview

• Introduction

• Preparation

• Migration

• Way forward

• Conclusions

(6)

29/09/2014 6

• Introduction

• What is Petrel Studio

• Why Petrel Studio

• Dimensions at EPN

(7)

SQL based database where virtually all Petrel information can be stored:

•Seismic data

•Well data

•Cultural data

•Interpretation

•...

Not able to store in Studio (yet):

•Models

•Workflows

What is Petrel Studio ?

(8)

29/09/2014 8

What is Petrel Studio ? (Production phase)

Petrel Working projects Studio database

.pet

Data Managers

External Seismic files

(9)

•Why Petrel Studio ?

• One master repository (one stop shop for all corporate data)

• Easy to find and gather data

• Rules and regulations

• Collaboration

• Quality attributes

(10)

29/09/2014 10

•EPN dimensions:

• 30 Petrel reference projects, 800 working projects

• Seismic: 410 3D surveys, 26000 2D lines

• 1600 wells

• 8 UTM zones (UTM21 ->UTM37)

• 77TB data

(11)

•Preparation

• IT Infrastructure:

• SQL server (Windows or Linux, VM ware at EPN))

• Petrel Studio software and licenses

• User awareness

• Pilot Project Plan

• Involve Schlumberger (PO, Project Initiation Document)

• Business case

• Petrel Reference Projects Clean-up (!!)

• No license fee needed, project cost ca. 25KEURO

(12)

29/09/2014 12

•Preparation – Petrel Reference Projects Clean-up

• Project needs to be as ‘clean’ as possible, for example

• Well data

• UWI to be present

• Interpreters present

• Minimum duplicate global well logs

• No duplicate observation numbers

• No well logs below TD

• Well symbols present

• Operator/spud date present

• Seismic data

• Geometry/geography mismatch (3D)

• SP/CPD relationship

• Illegal seismic format

(13)

•Preparation – Petrel Reference Projects Clean-up

•For the well data clean up a very usefull Petrel plug-in is available, RoQC Tools

•Used at EPN:

1. Created UWI for all wells

2. Removed 99% of duplicate well logs

3. Created Observation numbers when applicable 4. Created interpreter

5. Created operator/spud date from csv file

6. Gives audit report on KB reference offset, missing well symbol, logs below TD, unlikely borehole MD, checkshots seabed, etc

(14)

Well reference project before clean-up.

(15)

Well reference project after clean-up.

(16)

29/09/2014 16

•Migration

• Two reference projects (seismic + well) and two working projects selected

• First index file created

• Very few problems with well and cultural data

• Seismic migration showed slow performance with 3D surveys (intermittent)

• Presentation given by SLB to users

• Two users given training

• Seismic data issues:

• Illegal SP/CDP relationship

• Geopraphy/Geometry incompatible

• Illegal seismic format

(17)

•Way forward

• Issues to be solved by SLB

• Migrate remaining reference and active working projects

• Create seperate index files for:

• Reference data

• Active working projects

• Archived working projects

• Avocet & Logtek integration

(18)

29/09/2014 18

•Conclusions

• Involve Schlumberger for the pilot project

• Clean-up as much as possible (all) Petrel reference projects up front

• Make sure HW/SW is working before start working with SLB

• Make an implementation plan (which projects/users) for pilot and full deployment

• Get users actively involved at early stage

• Migration will have issues due to Studio being more sensitive and rigorous compared to Petrel

(19)

•Thank you !

(20)

Petoro Example

Petrel REF cleanup

www.roqc.no 20

(21)

Petoro - Petrel Ref project cleanup

• Audit the Petrel REF projects

• Discuss audit results with the users

• Address the agreed upon issues

• Re-audit the REF projects

• Present the results

(22)

Audit the Petrel REF projects

www.roqc.no 22

(23)

Discuss audit results with the users

• Duplicate GWL’s – (user sensitive to Well Log Collection ?)

• Quasi Duplicate GWL’s – (renamed on purpose?(Well Log Collections))

• Stratigraphic Charts & Well Top cleanup

• Missing UWI/data_source/occurence numbers

• KB/TD (incorrect & missing)

• Log data below TD

• etc

(24)

Address the agreed upon issues

www.roqc.no 24

• Manually collect & input the missing KB/coordinates/etc

• Manually check & fix logs below TD

• Well Log Manager

• Strat Cleanup

• Fix Well Headers

• Fix Missing Data_source

• Fix Occurence Numbers

• Fix Checkshots

(25)

Re-Audit the Petrel REF projects

(26)

Present the results

www.roqc.no 26

• Duplicate GWL’s

• Quasi Duplicate GWL’s

• Strat Charts & Well Top cleanup

• Missing UWI/data_source/occurence numbers -

• KB/TD (incorrect & missing) –

• Log data below TD –

• Etc

merged

many merged some left (GWL Collections)

cleanup done where charts defined

fixed

collected & input (time consuming)

• many decisions need to be made by users (check TD first)

rate limiting steps are with the users….

(27)

Some of the Tools Used

(28)

1. Audit Report

www.roqc.no 28

(29)

2. Fix Missing Occurrence Numbers

• Example of tools designed to fix very specific problems – pre-Studio

(30)

3. Well Log Manager

www.roqc.no 30

(31)

4 Strat Cleanup

(32)

5. Etc

www.roqc.no 32

• Other tools

• Petrel – inteligent use of filtering tools [inc Find]

• Excel - colating missing data [from CDA, NPD, Petrobank, etc]

(33)

Welcome to the new world

 Petrel Data Management  of

(34)

www.roqc.no 34

References

Related documents

Such business is small, 90 per cent having less than 40 employees, and co-exists alongside large indigenous and foreign owned firms across all homogenous good (exogenous sunk

The findings of this study show that wine knowledge and wine experience influence wine brand loyalty indirectly through wine brand trust and wine brand satisfaction.. In addition,

The Accommodation and food services and Arts and recreation services industries are important generators of tourism exports in metropolitan Melbourne and regional Victoria.. At

This paper analyzes the socioeconomic determinants of HIV infection and related sexual behaviors using the 2004 Lesotho Demographic and Health Survey. This is the first

Deficits in dynamic balance during walking have not been examined in older adults with HV under experimentally-controlled slow and fast speed conditions using sensitive measures

Exec commands: Session number to resume connect Open a terminal connection disable Turn off privileged commands disconnect Disconnect an existing network connection enable Turn

Participants will learn about execution phases of an innovation project (Define, Discover, Develop, Demonstrate), the substeps under each of the four phases,and the tools

Nominal center conductor diameter 3,15 Nominal diameter over dielectric 13,03 Nominal diameter over outer conductor 13,72 Nominal outer conductor thickness 0,343 Nominal diameter