(2) Maps show physical features of the natural or built environment at established scale and orientation. Plans are engineered drawings made to scale showing existing physical features of a site and proposed changes to accommodate development..
(3) • Parcel level • Town wide maps • USGS Quad map • County • State……..
(4) “A map is a point in time…”. -Alford Korzybski. Maps are 2-dimensional representations of complex landscapes… …at one point in time!.
(5) It’s not that complicated.
(6) • • • • • • • • •. Location Map List of Drawings Orientation Title Block Legend Scale Zoning Chart Notes And More…..
(7)
(8)
(9) Orientation North Arrow.
(10) Title Block Information on who/what/when etc. XYZ GROUP/ ABC ASSOCIATES 500 Longitude Boulevard Mapville, Connecticut 06001. 860-555-5555. Cartography Road. Mapville, CT. Title Creation & Revision Dates Source.
(11) Legends Provide a guide to the symbols used.
(12) Scale. 20’ !. 35’.
(13) Key Elements of Plans Written Scale 1:12,000 (ratio) 1” = 1,000’ (equivalent). Graphic scales are the most reliable!. Beware of Xerox Distortion. Graphical Scale.
(14) Measuring Distances Engineering Scales. 40 ft. 240 ft. Map Scale. Meaning. 10. 1 inch = 10 ft. 20. 1 inch = 20 ft. 30. 1 inch = 30 ft. 40. 1 inch = 40 ft. 50. 1 inch = 50 ft. 60. 1 inch = 60 ft. 400 ft.
(15) Measuring Distances. 1”=40’.
(16)
(17)
(18) Your planner, if you have one, will have reviewed the plans and may issue a pre-meeting memo highlighting any issues. Use your planner as a resource to help you focus in on issues or problems. This is a team effort will all staff being part of the team..
(19) Planner’s Site Plan Checklist.
(20) Contours: an imaginary line that connects points of equal elevation.
(21) Topography Cross-sections are sometimes used to represent 3-D objects in 2 dimensions..
(22) Topography Cross-sections are sometimes used to represent 3-D objects in 2 dimensions.. Vertical scale sometimes exaggerated to better show change.
(23) Contours always connect, but not always within the map boundaries... topography of 2 hills. This could be the edge of a presented map.
(24)
(25)
(26) Slope direction is calculated perpendicular to the contour lines.. Water flows downhill.... ...so the direction of flow is always perpendicular to the. contour lines, since this is the steepest slope.
(27) Many maps are in the form of topographical maps aka ‘topo’ Interpreting a 3D world in 2D.
(28) a spot elevation is a point of known elevation used as a pt of reference for surveys.. a contour interval is the vertical distance b/w contours. 10’ on topos; 2-5’ on site plans every 5th contour is an index contour shown in bold. a benchmark (BM): point of known position & elevation used as a pt of reference for surveys.. contours far apart show a gentle slope. contours close together show a steep slope. a series of concentric contours ending in a small closed circle or oval shows a local hilltop. contours very close together show a cliff contour lines of a ridge are in a “U” that always points downhill. green areas show forest cover; white areas denote fields contours at a stream form a “V” that always points uphill.
(29) Contour Drawing #1 A B C D E F. 22. 5 2. F. 1. E. 1. D. C. B. 1. A. a. b. c. d. e. f..
(30) Contour Drawing #2 A B C D E F. 27. 3. F. 0 E. C. D. 1. 0 B. 0 A. a. b. c. d. e. f..
(31) Contour Drawing #3 A B C D E F. 26. 0. 0 F. D. 0 C. B. 0. E. 3. A. a. b. c. d. e. f..
(32) Contour Drawing #4 A B C D E F. 31. 0. 1. F. D. C. B. 0. E. 1. 0 A. a. b. c. d. e. f..
(33) Contour Drawing #5 A B C D E F. 29. 3. F. 0 E. C. B. 0 D. 1. 0 A. a. b. c. d. e. f..
(34) Contour Drawing #6 A B C D E F. 27. 0 F. 1. E. 0 D. 1. C. B. 2. A. a. b. c. d. e. f..
(35) If too Steep: - potential erosion - soil stability - safety. 10 ft. 20 ft.
(36) If too flat: - storm water may not drain - may flood. 0 ft. 20 ft.
(37) Plan to divide one lot into 3 or more Town regulates lot size, frontage, setbacks, road construction, etc Planning Commission’s Role. Once approved, each home builder submits construction documents for building permit; once complete a CO is issued (Certificate of Occupancy).
(38) Zoning Commission for administrative review to see if it meets regulations. If it doesn’t meet regulations, must go to Zoning Board of Appeals for variance ZBA can only grant variances if there is a hardship with the ‘land’.
(39) Site Plan Reading FHA Pharmacy Survey Layout Plan Grading Plan Utility S&E Control Elevation Planting Plan Details. Let’s go through this set of plans, page by page..
(40) who? what? where? when? Where is it?. What’s the project name? Where’s north? TAKE IT APART & What’s the scale? START ASKING When drawn? QUESTIONS What kind of map?. What’s it all Mean?. Who made the map? Are they qualified?. 03/12/05.
(41) 03/12/05.
(42) More Level. Steeper. 03/12/05. Where’s the steepest and the flattest areas?.
(43) More Level. LP. Steeper. HP. 03/12/05. Where are the high and low points?.
(44) HP. 03/12/05. What direction does the water flow on the road?.
(45) Is this a copy? Is that really the scale?. 03/12/05.
(46) ask questions …… What’s the lot size?. Regulations: 1 ac. Lot is 1.34 ac..
(47) Is that enough frontage?. Regulations: 100’ min.. 122’. 40. Double Frontage.
(48) Is the building within setbacks? Regulations: 40’ front 10’ side. 27’ 131’. 46’.
(49) How many parking spaces?. Regulations: 41 + 2 34 + 2. 2. 9 5. 4. 8. 8.
(50) What’s the distance from the intersection? Regulations: 75’. 62’ 108’.
(51)
(52) Plan Reading. focus in.
(53) Grade changes MUST be within property boundary. Site Plan Review. Original grade is shown as dashed line 610 Proposed Grade is shown as a solid line and as 610. Grading Plan.
(54) Grade changes MUST be within property boundary. Site Plan Review. Original grade is shown as dashed line 610. Grading Plan. Proposed Grade is shown as a solid line and as 610. T S Top of Stair B S Bottom of Stair. B C Bottom of Curb. T C Top of Curb New Spot Elevations are indicated with an arrow to the exact spot.
(55) Grade changes MUST be within property boundary. Site Plan Review. Original grade is shown as dashed line 610. T W Top of Wall. Proposed Grade is shown as a solid line and as 610. B W Bottom of Wall. B C Bottom of Curb. T C Top of Curb New Spot Elevations are indicated with an arrow to the exact spot. Grading Plan.
(56) Site Plan Review How does water flows across the front parking lot.
(57) Site Plan Review – Focus on Topo Question: How can you ‘see’ the change from the original topo to the proposed?.
(58) Site Plan Review – Focus on Topo Look at the site in section.
(59) Site Plan Review – Changing Topo.
(60) Site Plan Review – Changing Topo. 610 Is there the right amount of soil to smooth the site out?.
(61) Site Plan Review – Cut and Fill. FILL CUT. Why should you be concerned with the amount of cut and fill?.
(62) Site Plan Review. Utilities – pull it apart.
(63) Site Plan Review. Stormwater System.
(64) Site Plan Review. Stormwater System TF Top of Flange, or aka Rim or CBR. Bottom of Invert pipe usually is even with top of Outlet pipe. INV or Invert where storm water enters catch basin OUT or Outlet where storm water leaves catch basin. Question: Why are the pipes so deep?.
(65) Site Plan Review. Stormwater System. System Schematic TF 609.10 EO 600.50. BP 559. Question: Any concerns?. Question: What does this mean?. NTS.
(66) Site Plan Review. Utilities, S&E.
(67) Site Plan Review Utility connections. Utilities.
(68) Site Plan Review. Construction Activity.
(69) Site Plan Review. Construction Activity. Sediment and Erosion Control.
(70) Site Plan Review. Details.
(71) Site Plan Review. Details S&E. Silt Fence. Hay-Bales. Anti-Tracking Pad.
(72) Site Plan Review. Elevation. Once approved, Construction drawings will be submitted to the building inspector for approval and oversight Not for design review.
(73) Great Neck School, Waterford, CT.
(74) Dry Swale L-1.5.
(75)
(76)
(77) Flush Concrete Curb L-1.3.
(78)
(79)
(80) 6’ Taper.
(81)
(82) Turf Pavers L-1.3.
(83)
(84)
(85) Wet Swale L-1.5.
(86) Grading Plan Sheet L-1.5. Drainage Plan Sheet C-2.0A.
(87)
(88) • What is the first floor elevation at the southwest corner of the existing school? Sheet 1 • When were the plans last revised? Sheet 1 • What is the setback line from Great Neck Road? Sheet 1 • How many lawn drains are the in the swales adjacent to the parking lots? L-1.5 • What is the elevation of the bottom of the wet swale? L-1.5 • What is the approximate elevation of wetland flag #21? C-2.0A • What is the distance from catch basin #1 (CB01) to catch basin#2 (CB02)? C-2.0A • On which detail sheet would you find the details of the basketball court? L-1.3 • What material is sidewalk at the entrance to the school made from? L-1.3 • What type of trees are planted along Great Neck Rd. L-1.9 • What type of plants are planted in the wet swale? L-1.9 • Follow the rain.
(89) #1 FF Elevation of Existing School.
(90) #2 Last Revision.
(91) #3 Setback from Great Neck Rd.
(92) #4--How Many Lawn Drains.
(93) #5 Elevation at Bottom of Wet Swale.
(94) #6 Elevation of Wetlands Flag #21.
(95) #7 Distance from CB01 to CB02. 90’.
(96) #8 Basketball Court Detail Sheet.
(97) #9 Sidewalk Treatment at Entrance.
(98) #10 Trees Along Great Neck Rd..
(99) #11 Plants in Wet Swale.
(100) Follow the Rain.
(101)
(102) Center for Land Use Education and Research at the University of Connecticut. Website: clear.uconn.edu © University of Connecticut. The University of Connecticut supports all state and federal laws that promote equal opportunity and prohibit discrimination..
(103)
(104)
Related documents
67 Æthelstan’s interest in collecting relics was reason enough for some scholars to postulate that the Anglo- Saxon king wanted to place himself in competition to the East
Let h FF be a relaxed plan heuristic, let s be a state, and let RPlan be the action set returned by relaxed plan extraction on the closed well-founded best-supporter function for
information on this plan, even though the annual cost is higher than other plans available.. Click on the name of the plan. “Your Plan Details” page will appear, with the “Drug
These partial plan sets shall include the following minimum sheets: Site Plan, Civil Plan(s), Utility Plan, Architectural Plans, Plumbing & Mechanical Plans.. NOTE: In lieu
Succession Plan - Candidates page 58 Succession Plan - Ratings Box page 61 Succession Plan - Slate page 63 Succession Planning reports 86 Succession Plan page 56, 57 succession plans
At the same time, similar partici- pants hold other perspectives that do not voice concern about land use change: the Southeast English residents' perspective Wine Culture and
Please note that a copy of the City-stamped set of building plans (or master plan) and the City-stamped site plan will be required to be on the job site for all
2 sets of building plans (floor plan, elevation, footer, foundation, framing, etc.) 2 copies of site plan (include all existing structures, proposed structure and their..