Nuclear Consultancy & Engineering Services

IT E R, F ran c e

(2)

December 13, 2011

ROLES OF NUCLEAR ENGINEERING COMPANIES

OVERVIEW

-CONSTRUCTION TECHNOLOGIES FOR NUCLEAR POWER PLANTS:

A COMPREHENSIVE APPROACH

(3)

Agenda

n.triple.a: who are we?

Part 1

Part 2

Part 3

Why does a nuclear power program need

a strong engineering commitment?

(4)

Part 1

n.triple.a: who are we?

Establishing an independent European engineering

organisation to support safer nuclear projects

(5)

Our Origins

– delivering engineering excellence worldwide

The alliance of two of the world’s leading

consultancy and engineering firms:

Atkins

and

Assystem

.

A strong relationship forged through

working together on the

ITER

international nuclear fusion research

project.

Our combined nuclear experience

spans more than

four decades

in

(6)

Our Team

– key experts and multi-disciplined

n.triple.a

draws on the resources of

its two parent companies.

27,000 highly trained professionals

of which

3,000 are nuclear skilled

Our project teams are exclusively lead

and supported by

“in house” experts

(7)

Part 2

Why does a nuclear power program need

a strong engineering commitment?

(8)

Milestones in the development of a national infrastructure for nuclear power IAEA NUCLEAR ENERGY SERIES No. NG-G-3.1

Engineering activities

(9)

Engineering activities

-

Needed at all the phases of a project

Lenders Technical Advisor Architect

Engineering Consulting

Owner Engineering

Operation & maintenance support

Commissioning & start up

(10)

Consulting

Missions

Early feasibility studies

Strategic plan support, roadmap &

policy development

Regulation and licensing support

Sitting studies

Workforce planning

Technical assessment

Impact assessment

Emergency planning

Assistance to manage an effective

NEPIO

Assistance to build an operating

organization

Strategic sitting assessment for

new nuclear power stations

Nuclear environmental

permitting and regulatory

support

(11)

Consulting

– Case Studies

Nuclear environmental permitting

and regulatory support

– Safety case documentation

– Environmental documentation (part of environmental permit application)

– Independent nuclear safety assessment

– Management prospectus and related documentation

– Supporting arrangements (nuclear baseline, site licence condition compliance, environmental permit conditions)

Strategic sitting assessment for

new nuclear power stations

– Assess 11 industry nominated sites across England and Wales

– 2 main types of criteria: exclusionary and discretionary

– Ensure the criteria considered that sites are sustainable until

decommissioning (100+ years period)

– 2 main potential risk areas: nuclear safety, societal issues

(12)

Owner Engineering

Missions: support to the operator in

– Licensing and permitting activities

• Development, submission, and implementation of nuclear licenses • Sites qualification process

• All technical studies for acceptance process – Overall project management

• Support for NPP vendor selection and contracting process

• Oversight of management of supply chain activities

• Acceptance reviews of key Program technical deliverables

– Technical support

• Preparation of plans necessary for NPP testing, commissioning, start-up and turnover.

• Construction management oversight … – Regulatory compliance

• Developing and maintaining a culture of nuclear safety

Owner engineering support

on ASTRID Gen IV prototype

reactor

(13)

Owner Engineering

– Case Studies

Owner Engineering support on

Advanced Sodium Technological

Reactor for Industrial Demonstration

(ASTRID)

– Coherence between developments made by CEA engineering units, R&D centres and partners’ engineering centres

– In terms of: performance, technical and spatial interface aspects, costs, system configuration, sub-systems and equipments

– During preliminary project phase 1

(feasibility) and preliminary project phase 2 (Basic design + engineering, procurement and construction management

(14)

Architect Engineering

Missions

Design

: from basic to construction

including configuration and digital mock

up management

Procurement

: from packages

breakdown structure definition linked to

industrial strategy to purchase orders

Project management

: Time, Cost and

Quality

Nuclear Regulatory compliance

Image : EDF – March 2010

(15)

Architect Engineer

– Case Studies

Architect Engineer for ITER buildings

and civil infrastructures

One of the biggest engineering

contracts in Europe

Engage consortium

Assist F4E during the entire

construction process (from detailed

design to final acceptance of the works)

The contract represents

• around 1,700,000 hours of work, • a duration of 8 years

• 230 engineers and designers

(16)

Commissioning and Start-up

Missions

Preparation

• System Commissioning programme

• Commissioning Instructions

• Tests lists

On site

• End of Erection priorities

• Preliminary tests

• System tests and overall tests

• Start Up

EPR Olkiluoto 3

GB2 Enrichment plant

(17)

Commissioning and Start-up

– Case Studies

Nuclear spent fuel reprocessing plant

UP 3 and UP 2 800 project France –

LA HAGUE

Nuclear MOX fuel assemblies

manufacturing France - Marcoule plant

140 t/year

All nuclear power plant in France

Nuclear power plant 900, 1300, 1400

MW

(18)

Operation & Maintenance Support

Missions:

Full-service plant engineering

Reliability improvement

Outage preparation and

management

Changes engineering and

implementation

Operation manuals update

Outage Preparation &

Management – coordination of

works in the reactor building

during unit outages

(19)

Operation & Maintenance Support

– Case Studies

Coordination of work in the reactor buildings

during unit outages (EDF)

– Identifying and monitory critical activities on the basis of the updated outage planning schedule

– Locating the activities and operators of the different trades and skills within the Controlled Zone

– Identifying and controlling constraints, and anticipating any deviations from plan

– Managing the progress meetings between the

different trades and operators, with critical monitoring of the security, safety and radioprotection aspects in the Controlled Radiology Zone

– Facilitating communication among the different actors involved

– Guaranteeing capitalisation on Feedback from each outage of relevance to these activities.

(20)

Lender Technical Advisor

Missions:

Global overview over the different

phases

Monitoring and reporting on

construction and commissioning

activities.

Risk analysis

Gaps analysis

Environmental, Social and Safety

(ES&S) assessment and

monitoring all along the project

Image : The National

(21)

Lender Technical Advisor

– Case Studies

UAE NPP Lender Technical Advisor

– Provide an independent technical assessment of the NPP

– Inform the investment decision of the private lenders, a combination of export credit

agencies and commercial banks

– Until the reactors become operational (final schedules are dependent upon regulatory reviews and approvals), the company will monitor and report on construction and commissioning activities

– A core team of experts will be established in Abu Dhabi and will have the ability to draw on its specialists worldwide

BRAKA Nuclear Power Plant four APR-1400 reactors

(22)

Part 3

(23)

Multiple approaches

(24)

Why do you need engineering companies?

Independence

Capacity to mobilise

Lessons learnt and know-how

Flexibility

Technology knowledge and control

Training

Long term commitment and partnership

Planning, Quality and Cost

Allow the other stakeholders to focus on their own tasks and added-value

(25)

Our Strengths

- the power of our organisation

Our

nuclear experience:

In-depth knowledge of

nuclear technologies

for nuclear new build

programmes.

The full range of

nuclear and technical skills.

Our experience and track record of

successfully managing large

scale projects

is second to none.

Our

independence.

Our

tailored and collaborative approach.

The availability of our

training academy.

Our

local presence

combined with our ability to reach-back to a broad

and deep capability.

(26)

Our Experience

– over 40 years of delivery

Safety case preparation and regulatory support Production of nuclear new build development plan Generic Design Assessment technical support Development of Strategic Siting Assessment process to select new sites in the UK Independent

review of plan for Darlington nuclear new build project

Independent review of the capital cost estimates for an

ESBWR power plant Commissioning of the French uranium enrichment facility Architect Engineering role for an 8 years programme (150

M€ contract) Development of

codes and standards for the licensing of

the AP1000 in UK Provision of Technical expertise on CPR1000 NPP design (China) Nuclear technical expertise for the French Technical Support Organisation Engineering studies supporting EPR nuclear fleet Improvement of the safety and operation of VVER

reactors (international

cooperation)

Commissioning phases for the

two 900 MW nuclear power plants in South

Africa

Implementation of introduction training for the engineering

centres

Support for new nuclear build site

licence application including EIA Support for new

build nuclear site licence including environmental impact assessment Technical expertise

for the Generic Design Assessment

of new reactor designs

(27)

In se rt a ca p ti o n to g o w ith th e p h o to g ra p h i n h e re

Contact: Frederic Cheneau Bernard Blanc

Email: [email protected] [email protected] Our web site: www.ntriplea.com

References

Related documents

The proposed architecture utilizes network access control and user access rights policies as well as network topology information to make a policy decision and then this decision is

See supra Part I.B (explaining how the doctrine can potentially rule in, and rule out, which public officials to blame for perceived harms in the immigration system); infra Part

Difficulties exist in determining the seismic response of dams [2] the most important of which are: (i) dams complex geometry and forms, motivated by the topography and

To determine whether the three regions’ current challenge against the IIA Global competence assessment is because of the changed environments and competency requirements in

These flaws include: the failure to take economies of scale (or “lumpiness”) into account; the failure to recognize that the market and institutional imperfections that the

Engineers with operational and technical expertise in both electronics and software engineering are needed to design the next generation of computer apps, interactive

In brief, the combination of a steep firm-specific marginal cost curve and high demand elasticity will maximize the relative marginal cost effect and minimize the price effects,

Our approaches span a number of traffic related applications, covering assignment strategies for EV charging, parking and bike sharing, cooperative emission control, and data