• No results found

MGT Project Management

N/A
N/A
Protected

Academic year: 2021

Share "MGT Project Management"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

MGT 471 - Project Management

Instructor: Dr. Minder Chen,

Professor of MIS

Office location: Broome Library 2480 Class time: T. & Th. 9:00 am to 10:15 am Email: [email protected]

Phone number: 805-437-2683

Course website:

http://faculty.csuci.edu/minder.chen/project/ Office Hour

Tue. and Thur. 10:30 a.m. – 11:30 a.m. and Thursday 10:30 a.m. – 11:30 a.m.

Students should contact me by email at [email protected] to make an appointment in advance.

Course Description

This course introduces you to various project management concepts and techniques as you participate in a project team engaged in working on a real project. Topics will include defining a project, work breakdown structure, costing, scheduling, reporting, and managing a project team using mostly adaptive project management techniques. Microsoft Project will be introduced as a project management tool via hands-on exercises.

Catalog Student Learning Outcomes

1. Interpret cases and describe (orally and in writing) the project management issues of the cases. (2, 3, 5)

2. Analyze project management issues related to IT or scientific projects and offer recommendations for effective corrective actions. (1, 5)

3. Evaluate in writing the inter-relationships among the disciplines of science, basic management, and project management. (1 ,3)

*Aligns with Program Learning Goals for: (1) Critical thinking, (2) Oral communication, 3) Written Communication, (4) Conduct (Ethics), (5) Competencies in discipline, (6) Collaboration

Textbooks

1. *(IBM) Principles of Project Management (Course Code N2650), Student Notebook, ERC 2.0, IBM Certified Course Material, April 2005 Edition. (pdf)

2. (PMME) Kemp, Sid, Project Management Made Easy, 2006 at http://www.entrepreneur.com/ downloads/assist/project_management_made_easy.pdf

3. (PMBOK) PMI, A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fifth Edition, 2013 (Optional) http://cokepm.com/pmbok3/ (Version 3 online)

4. (Primer) Nick Jenkins, A Project Management Primer or “a guide on how to make projects work” http://www.nickjenkins.net/prose/projectPrimer.pdf (Free)

(2)

5. Carl Chatfield and Timothy Johnson, Microsoft Project Step by Step 2013. (link or link2) -- Download the practice files. MS Project 2013 software will be available via DreamSpark (to be annouced soon!); Getting Started http://office.microsoft.com/en-us/support/getting-started-project-FX103299118.aspx

6. Lynda.com via myCI

o Project 2013 Essential Training with Bonnie Biafore (5 hours) o Project Management Simplified with Chris Croft (1h 19m)

References

1. Frederick P. Brooks, The Mythical Man-Month: Essays on Software Engineering, Anniversary Edition (2nd Edition), August 12, 1995. Chapter 2: http://www.csee.umbc.edu/~mgrass2/cmsc345/ paper%20-%20MythicalManMonth.pdf

2. Project Management Handbook at http://www.projectmanagement-training.net/download/ book_project_management.pdf

3. Stanley E. Portny, Project Management for Dummies 3rd edition (download) 4. Agile Project Management for Dummies (download)

5. Simon Wallace, The ePM Book, 2014 at http://www.epmbook.com

6. Russell Darnall and John M. Preston, Project management from Simple to Complex, The Flatworld Knowledge, 2010. (optional) http://students.flatworldknowledge.com/course/768103

7. Erik W. Larson and Clifford F. Gray, Project Management: The Managerial Process, 5th Edition, McGraw-Hill, March 2011.

Schedule

Dates Topics Comments

1/20; 1/22

Introduction of Project Management (Slides) IBM-Unit 1 & 2 Primer-all

PMBOK-C1 (Introduction) & C2 (Organization & Lifecycle)

1/27; 1/

29

Project Initiation (

slides

)

Project Planning and Organization (

slides

)

1/29 the whole class will attend the CI’s Inaugural

PMME-C1~5

IBM-Unit 3, 4, & 5

Primer-all

(3)

Hall 2030 (

pdf

)

(Integration)

2/3; 2/5 Meeting facilitation

2/10; 2/12 Project Requirements/Scope Management (slides) Creativity and Innovation

PMME-C6

IBM-Unit 7 (Requirement) PMBOK-C5 (Scope) 2/17; 2/19 Organize Project Teams

Manage Project Team (Slides** Team model, culture) Project Communications

Meeting facilitation

IBM-Unit 6 (Organizing the Team) & 19 (Team)

PMBOK-C2.3 (Project Team) &C10 (Communication)

PMME-C10 2/24;2/26 Project Estimate

Project Life Cycle & SDLC (Systems Development Life Cycle) (Slides)

IBM-Unit 10 PMME-C7

3/3; 3/5 Work Breakdown Structure (WBS) (slides) IBM-Unit 8

PMBOK-C5.4 (WBS) PMME-C6

3/10; 3/12 midterm exam on 3/10 Microsoft Project 3/12

3/17; 3/19 Spring Break no class this week 3/24; 3/26 Group Project Midterm Review

Project Scheduling (slides***) (additional slides) Case Study Presentation (1)

IBM-Unit 11

PMBOK-C6 (Time) PMME-C7

3/31; 4/2 3/31 is César Chávez Day; campus closed Project Control

Microsoft Project (Practice File and slides; Chapter 2 MSPSS; Practice File 1)

IBM-Unit 12 & 13 PMME-C7

4/7; 4/9 Manage Project Cost (slides** Earned Value Management) Manage Project Quality

Case Study Presentation (2)

IBM-Unit 14 (Quality) & 15 (Cost) PMBOK-C7 (Cost) & C8 (Quality) PMME-C8

4/14; 4/16 Risk Management (Slides* Risk impacts) Case Study Presentation (3)

IBM-Unit 9 (Risk) PMME-C9

4/21; 4/23 Project Procurement (slides* Contact types, provider type vs. level of specification and complexity of procurement)

Case Study Presentation (4)

IBM-Unit 16 (Procurement) PMBOK- C12 (Procurement)

(4)

4/28; 4/30 Project Human Resource Management Case Study Presentation (5)

PMBOK-C9 (Human Resource)

5/5; 5/7 Project Review and Closure Case Study Presentation (6) Group Project Presentation

IBM-Unit 17, 18, & 20

5/12 Final Exam (8:00 am - 10:00 am) Grading Information

• Midterm exam: 30%

• Final Exam: 30%

• Group Project: 20%

• Case Study Presentation and Analysis: 10%

• Class participation (including attendance, classroom, and online interactions): 10% Grading Scale A 93 + C 73 - 77 A - 90 - 92 C- 70-72 B + 88 - 89 D+ 68-69 B 83 - 87 D 63 - 67 B - 80 - 82 D- 60-62 C + 78 - 79 F 60< Group Project

There is a group project for this course and it counts for 30% of your final grade. Each group should have 3-4 members.

Email Requirements

It is your responsibility to check your CSU email account regularly for additional announcements and communications. All email communications to the instructor should have the following subject heading: “Project Management course”

(5)

Attendance

Attendances are required except for excused absences and advanced notification of the instructor (see University Policy) and attendances will be counted as part of your participation in the class.

Equipment

You are required to have access to a PC either at home or on campus. The PC should have adequate software products such as Microsoft Office and other software recommended by the instructor.

CSUCI Disability Statement

Cal State Channel Islands is committed to equal educational opportunities for qualified students with

disabilities in compliance with Section 504 of the Federal Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA) of 1990. The mission of Disability Accommodation Services is to assist students with disabilities to realize their academic and personal potential. Students with physical, learning, or other disabilities are encouraged to contact the Disability Accommodation Services office at (805) 437-8510 for personal assistance and accommodations.

Academic honesty

Academic honest is expected by all the students in this class. Any academic dishonesty will not be tolerated. Academic dishonesty includes such things as cheating, inventing false information or citations, plagiarism and helping someone else commit an act of academic dishonesty. It usually involves an attempt by a student to show possession of a level of knowledge or skill that he/she does not possess. Students in this course should abide by Policy on Academic Dishonesty at http://senate.csuci.edu/policies/2002-2003/SP02-01.pdf Disclaimer

The syllabus is subject to change to reflect new materials, assignments, and background of students. Students should check the online version of the syllabus frequently.

References

Related documents

For example, in Section 5.1, we showed a case where a malicious cookie was generating 300 times more revenue in N ETWORK X’s auction traf- fic than in their local traffic

The evaporation induces a flow in the liquid phase directed toward the evaporative surface (top surface of sample in the experiment described in the present paper) during the CRP

being there being where good things happen, being in the right place at the right time.. Caleb seems to succeed by just

Amongst other things, the following are reported on and discussed: the use of formal methods; advisory systems as safety related systems; safety integrity levels and the

In the gene mutation aspects that encode the rapid sodium channel (SCN5A gene), this channel is responsible for sev- eral phenotypes, such as Brugada syndrome, idiopathic

More recent food safety research has identified the critical role of supervisors in ensuring employees are practicing safe food handling behaviors in an effort to minimize

In my project most of the forms or controls different functions based on the input from users given in form1(The different functions based on the input from users given in

□ Join the SC Bar’s Solo and Small Firm Section and email listserv for access to a network of other solo and small firm lawyers. www.scbar.org/solo Also, consider attending the