FairPoint Change Management Process
John Berard, Director Wholesale Services
Linda Birchem, Sr Manager – OSS Implementation
Portland, Maine
1
Agenda – 02:00PM to 3:30PM Change Management
Change Management Meeting
02:00PM to 2:10PM
Introductions – Agenda – John Berard
02:10PM to 02:50PM
IT Weekly Update on Scheduled Deployments
– Gwen Hammond
02:50PM to 03:20PM
Change Requests Ballot Results – Linda Birchem
IT Agenda
IT Regression Results
Items planned for 11/19 deployment
IT Top Priorities and Next Steps
Change Management Priority Results
Next Steps
Regression Feedback
Regression Feedback from 10/29, 11/2 and 11/9
deployments
18 items were deployed in these deployment windows
Feedback received for the items listed below
All other items moved to the closed tab
3
Defect
Trans
Type Defect Description CLEC Issue Identified IT Comments
11303
Directory Listing Orders
Directory Listing (REQTYP=JB or ACT=J) orders need to allow same day due dates.
Some same day due dates are still getting rejected with invalid due date errors for some scenarios. This applies to orders as well as cancels to orders.
Due Date Interval was updated in the system. IT team has discovered an issue with the calculation of the interval which is being tracked by 12361 and is planned for 12/10.
11640 Error Message
Invalid error: Cable and Channel pair are invalid for the given Address Location- CONT'D (related to Incident 11156). This item will address Cable and Channel pairs which were not loaded in inventory from Verizon.
Supplement was placed on a confirmed order and failed for “cable/pair not valid” even though the original order was confirmed.
This is a known issue that is currently being tracked under Incident # 11780 which has a planned deployment date of 11/19. Until this is resolved, please work with your SPOC to supplement the order manually.
11701 Loop Make Up
Loop Make up Pre Order response returns an incorrect LST value.
Since the deployment on 10/29, results with invalid addresses are being returned when the search is performed with a TN.
Incident 12300 was opened to resolve the address issues with Loop Quals using a WTN. This was deployed on 11/9. The address issue for 11701 was also resolved. No issues reported since 11/9 fix. Moving to closed tab.
11/19 – Planned Deployments
29 Items are planned for the deployment on
11/19
Items are marked in the IT Action Items list with a
Prod PFD of 11/19.
Accessible letter will be sent on Thursday (11/19)
with the final list of proposed deployments.
Follow-up accessible letter will be sent on Friday
(11/20) to confirm the deployments.
11/19 – Planned Deployments (Slide 1 of 2)
Key Items for planned for 11/19 Deployment
10914 – Enhance error message to include the TN or
Circuit ID for multi-line orders to indicate which line caused
the error.
11034 – System workaround to allow orders to create which
were previously receiving the invalid message "System is
currently busy. Please resubmit the order after some time"
11054 – Clean up of UNE1, UNN1, and UCP1 FIDs on TNs
where the line share circuits have been disconnected.
11508 – FOC should be returned on ASR Cancel orders
11780 – Update to correct an invalid error for Sup 2s
applied to AB/N orders. The error received is "Invalid cable
and channel pair" but the original order created without the
error.
11/19 – Planned Deployments (Slide 2 of 2)
Key Items for the 11/19 Deployment (continued)
12091 – LSTFR field should be removed from the xDSL
Loop Qual results.
12191 – Company validation logic needs to be implemented
on standalone Directory Listing orders
12225 – System should accept lower case apartment
numbers rather than rejecting with message indicating the
city is invalid.
12315 – System should no longer return the following error,
“ORA-00001: unique constraint
(ASAP.IDX_ORDER_LINE_FEAT_PK) violated“
12546 – Sup 1 orders on CB/Vs are failing with error
message, “Unexpected error occurred in the system”
Top IT Priorities
Top IT Priorities
Error Message Updates
Jeopardy Notification Enhancements
Wholesale Line to RCF Conversion
The Excel spreadsheet has the items we are tracking for the IT call
(included separately). The defects are separated into Active, Deployed
and Closed tabs.
Continue to submit your requests to replay rejected orders to update the
error messages. Email
[email protected]
with the
following information:
The CCNA provided on the LSR Request ?
The list of PONs you would like to re-push?
The best time to re-push these orders? If you have a preferred time during which
you would like us to resend the orders please let us know in advance.
8
FairPoint Wholesale User Forum - Proprietary and Confidential
FairPoint Wholesale User Forum - Proprietary and Confidential
Change Management Process
FairPoint Wholesale Change Management
Forum – Type 2, 3, 4, and 5 Change Requests
Linda Birchem, Sr Manager – OSS Implementation
Portland, Maine
11
Type 1 Defect
CLEC Change Request Summary One Communication
James Nesmith
Defect # - XXXX – VFO GUI
VFO GUI – Pre-Order add the ability to visually see “caption” and other complex directory listings similar to VZE “show book” functionality. This view/tool will allow CLEC’s to accurately view caption listings and the “indents” as well as assisting the issuance of accurate DL change orders.
Level of Effort High
This request would be new development within FairPoint working with the IDEARC files and the Synchronoss VFO GUI or a new “Tool”.
Final Ranking - 4.4 CR# - FRP01 – 09032009 moved to the Type 1 Defect List as of November 2009
12
Type 1 Defect
CLEC Change Request Summary AT&T
Debbie Knittel & Mary Mullen
Defect # - XXX – VFO GUI
VFO GUI – LSR Ordering and TA “add” functionality to GUI to allow companies to place and sort orders and trouble tickets by multiple Company Names(CCNAs)
•Currently the VFO GUI does allow the ability to sort the column “Company Code” on the “order List” as well “filtering “ by Customer Code.
Level of Effort High
This request would be new code and logic to the VFO GUI set-up and the change would need to be approved by the fellow Synchronoss customers.
Final Ranking - 3.8 CR# - FRP01 – 09182009 moved to the Type 1 Defect List as of November 2009
12
Type 3 Industry Guidelines OBF – UOM
Industry Forum Change Request Summary ATIS - OBF
UOM – ASR Committee
CR # - FRP01 – 05012009 - ASOG 40 Release – •Issue Date (Final Posting OBF) – September 25, 2009 •Flash Cut Weekend March 19th– 21st, 2010
ASOG CTE 4 - 6 weeks prior to Implementation February 1, 2010 thru March 12, 2010
October Ballot Results Type 4 & 5
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
4.6 5 - 15 4 - 0 3 - 2 2 - 1 1 - 0 Blanks - 1 Pass - 0 5 - Access Point 5 - AT&T 5 - Broadview 5 - Comcast 5 - Cornerstone 5 - Granite 5 - IDT 3 - Level 3 5- Matrix 3 - MetTel 5- One Comm Blank - Oxford 5 - PAETEC 2 - Pine Tree 5 - SegTel 5 - SoverNet 5 - USA Tel 5 - Verizon Business 5 - XO Comm FRP01 -05042009
VFO GUI – Proposed Changes:
Add FOC Date (confirmed date)
Provisioning Complete date and Billing Complete date Add Cancel view only Add “sup” field - Complete added per Synchronoss 11.5.2 Add FairPoint Order Number Add the ability to manipulate the fields as they appear on the work list by each login
Medium
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
4.5 5 - 8 4 - 5 3 - 1 2 - 0 1 - 0 Blanks - 3 Pass - 2 3 - Access Point Pass - AT&T 5 - Broadview 4 - Comcast 5- Cornerstone 5- Granite 5- IDT 4 - Level 3 5 - Matrix 4 - MetTel 5 One Comm Blank - Oxford 4 - PAETEC 4 - Pine Tree Blank - SegTel Blank - SoverNet 5 - USA Tel 5 - Verizon Business Pass - XO Comm FRP01 -05262009
Add Drop Down under Pre Order TN Reservation that would allow rep to select
RANDOM/GOLD/SEQUENTIAL
TNs/specified numbers other than NPA –NXX – XXXX only by line number
High
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
4.4 5 - 4 5 Defect - 6 4 - 3 3 - 2 3 Defect - 1 2 - 0 1 - 0 Blanks - 0 Defect - 2 Pass - 1 5- Access Point Pass - AT&T 5 Defect - Broadview 5 Defect - Comcast 5 Defect - Cornerstone 5 - Granite 5 Defect - IDT Defect - Level 3 5 Defect - Matrix 5 - MetTel 5 - One Comm 4 - Oxford 3 - PAETEC 4 - Pine Tree 4 - SegTel 3 - SoverNet 5 Defect - USA Tel
3 Defect - Verizon Business Defect - XO Comm
FRP01 -09032009
VFO GUI – Pre-Order add the ability to visually see “caption” and other complex directory listings similar to VZE “show book” functionality. This view/tool will allow CLEC’s to accurately view caption listings and the “indents” as well as assisting the issuance of accurate DL change orders.
**** CR moved to the Type 1 Defect List.
High
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
4.3 5 - 11 4 - 3 3 - 3 2 - 0 1 - 1 Blanks - 1 Pass - 0 5 - Access Point 5 - AT&T 5 - Broadview 3 - Comcast 5 - Cornerstone 4 - Granite 5 - IDT 3 - Level 3 3 - Matrix 5 - MetTel 5- One Comm Blank - Oxford 5 - PAETEC 4 - Pine Tree 4 - SegTel 1 - SoverNet 5 - USA Tel 5 - Verizon Business 5 - XO Comm FRP01 -05222009
We would like excel
functionality added to TA and at the same time add
additional fields to Wisor / Synchronoss for Restored time, outage duration, and close out narrative and the trouble found code and disposition code. This should include the numeric value of the trouble found code.
Medium
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
4.2 5 - 12 4 - 1 3 - 2 2 - 2 1 - 1 Blanks - 1 Pass - 0 5 - Access Point 5 - AT&T 5 - Broadview 5 - Comcast 3 - Cornerstone 2 - Granite 5 - IDT 5 - Level 3 5- Matrix 4 - MetTel 5 - One Comm 5 - Oxford 5 - PAETEC 1 - Pine Tree Blank - SegTel 2 - SoverNet 3 - USA Tel 5 - Verizon Business 5 - XO Comm FRP01 -08072009
Trouble Administration (TA) Chronic Outages functionality via the GUI to be implemented to identify the following:
Circuits that are considered Chronic based upon the volume of Trouble Tickets opened against the circuit (Pots, T1 & above etc.,) Ability to capture and export all chronic tickets involved in that chronic case.
High
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
3.8 5 - 1 5 Defect - 7 4 - 2 3 - 0 3 Defect - 0 2 - 1 1 - 3 1 Defect - 1 Blanks - 2 Defect - 2 Pass - 0 1- Access Point 5 Defect - AT&T 5 Defect - Broadview 1 Defect - Comcast 5 Defect - Cornerstone 4 - Granite 5 Defect - IDT Defect - Level 3 5 Defect - Matrix 4 - MetTel 5 - One Comm 1- Oxford 1 - PAETEC 2 - Pine Tree Blank - SegTel Blank - SoverNet 5 Defect - USA Tel
5 Defect - Verizon Business Defect - XO Comm
FRP01 -09182009
VFO GUI – LSR Ordering and TA “add” functionality to GUI to allow companies to place and sort orders and trouble tickets by multiple Company Names(CCNAs)
Currently the VFO GUI does allow the ability to sort the column “Company Code” on the “order List” as well
“filtering “ by Customer Code.
**** CR moved to the Type 1 Defect List.
High
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
3.4 5 - 4 4 - 5 3 - 5 2 - 2 1 - 2 Blanks - 0 Pass - 1 5 - Access Point Pass - AT&T 5 - Broadview 3 - Comcast 1 - Cornerstone 4 - Granite 5 - IDT 2 - Level 3 5 - Matrix 2 - MetTel 4 - One Comm 3 - Oxford 3 - PAETEC 4 - Pine Tree 3- SegTel 4 - SoverNet 1 - USA Tel 4 - Verizon Business 3 - XO Comm FRP01 -07172009
VFO GUI - For all pop-up selections, please provide the meaning of each value /within/ the pop up, as well as in a tool tip at the bottom of the form. This is also inclusive for Sup “Other” – Pop-up selector should include the meaning of each value (1 through N).
High
October Ballot Results
Final Ranking
Final Results
1 thru 5 Ranking per CLEC
CR
Number Description LOE
1 5 - 1 4 - 1 3 - 1 2 - 2 1 - 9 Blanks - 3 Pass - 2
Pass - Access Point 5 - AT&T Pass - Broadview 1 - Comcast 1 - Cornerstone 1 - Granite 1 - IDT 4 - Level 3 1 - Matrix 1 - MetTel 1 - One Comm Blank - Oxford 2 - PAETEC 2 - Pine Tree Blank - SegTel Blank- SoverNet 1 - USA Tel 1 - Verizon Business 3 - XO Comm FRP01 -05132009
Verizon has on their GUI a link "Sonet Facility" which is different than their link "CFA Search". The "Sonet Facility" link allows us to look up OC48 facilities by AP name & state or SCID & state. This shows what Verizon has
working/spare on each
slot/channel. Will we have this same capability with the FairPoint GUI?
High
22
March 2010 Release Milestones
Dates Milestones
December 9, 2009 Identify the Change Requests that will be included the March 2010 Release
January 8, 2010
January 15, 2010
February 5, 2010
•73 day notice draft business rules
•66 day notice draft technical specifications TCs have 15 business days from this publication to provide comments
•45 day notice Final documentation of business rules, technical specifications, and error message
February 1, 2009 – March 12, 2009
Code and Release testing Internal
23
Type 5 Change Request
CLEC Change Request Summary Broadview - Karen
Bracken
Cornerstone – Austin AT&T – Debbie Knittel
CR# - FRP01 – 05042009 - VFO GUI – Proposed Changes: Add FOC Date (confirmed date)
Provisioning Complete date and Billing Complete date Add Cancel view only
Add “sup” field - Complete added per Synchronoss 11.5.2 Add FairPoint Order Number
Add the ability to manipulate the fields as they appear on the work list by each login
Level of Effort Medium
This request will require new development of the VFO GUI and would need to be approved by the fellow Synchronoss customers to ensure that there is not a negative impact.
Final Ranking - 4.6
24
Type 5 Change Request
CLEC Change Request Summary Broadview
Karen Bracken
Verizon Business – Sherry Lichtenberg
CR# - FRP01- 05262009 - Add Drop Down under Pre Order TN Reservation that would allow rep to select RANDOM/GOLD/SEQUENTIAL TNs/specified numbers other than NPA –NXX – XXXX only by line number
Level of Effort High
This change will impact internal systems and potentially field(s) on the VFO GUI.
Final Ranking - 4.5
25
Type 5 Change Request
CLEC Change Request Summary AT&T
Debbie Knittel/Mary Mullen
CR# - FRP02 – 05222009 - We would like excel functionality added to TA and at the same time add additional fields to Wisor / Synchronoss for Restored time, outage duration, and close out narrative and the trouble found code and disposition code. This should include the numeric value of the trouble found code.
Level of Effort Medium
This request will require development to the VFO GUI
Final Ranking - 4.3
26
Type 5 Change Request as of September
CLEC Change Request Summary One Communications
Dan Desmond
CR# - FRP01 – 08072009 -Trouble Administration (TA) –
Chronic Outages functionality via the GUI to be implemented to identify the following: chronic T1 & above chronic circuits. Ability to capture all chronic tickets involved in that chronic case.
Level of Effort High
This request will require development of Remedy and VFO GUI and would be predecessor to the CR requesting the ability to export TA information from the GUI
Final Ranking – 4.2
27
Type 5 Change Request
CLEC Change Request Summary Cornerstone
Communications Austin Brower
CR# - FRP01 – 07172009 - VFO GUI – Proposed Changes:
VFO GUI - For all pop-up selections, please provide the meaning of each value /within/ the pop up, as well as in a tool tip at the bottom of the form. This is also inclusive for Sup “Other” – Pop-up selector should include the meaning of each value (1 through N).
Level of Effort High
This request will require new development to apply FairPoint Business Rules to each REQTYP/ACT and allow for changes/updates to VFO GUI as new versions of the LSOG are placed into production.
Final Ranking – 3.4
28
Type 5 Change Request
CLEC Change Request Summary AT&T
Anna Miro
CR # - FRP01 – 05132009 - Verizon has on their GUI a link "Sonet Facility" which is different than their link "CFA Search". The "Sonet Facility" link allows us to look up OC48 facilities by AP name & state or SCID & state. This shows what Verizon has working/spare on each slot/channel. Will we have this same capability with the FairPoint GUI?
Level of Effort
High
This request would require new development to the existing backend systems and also the VFO GUI.
Final Ranking - 1