• No results found

Total productive maintenance policy to increase effectiveness and maintenance performance using overall equipment effectiveness

N/A
N/A
Protected

Academic year: 2020

Share "Total productive maintenance policy to increase effectiveness and maintenance performance using overall equipment effectiveness"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. Downtime machine January-December 2017 (Minutes).
Fig. 3. Research methodology.
Table 1. Availability, performance, and quality value.
Table 3. Six big losses value. Six Big Losses Factors
+4

References

Related documents

Assessment of safety and ef fi cacy of long-term treatment with combination lumacaftor and ivacaftor therapy in patients with cystic fi brosis homozygous for the F508del-CFTR

CTRU: Clinical Trial Research Unit; EPHP: enhanced public health programme; GP: general practitioner; HTA: Health Technology Assessment; MRC: Medical Research Council; NHS:

“To Study the Effectiveness of Employees Training & Development Program”.The prime objective of research is to study the changes in skill, attitude,

ADL: activities of daily living; AE: adverse event; AES: apathy evaluation scale; ASBQ: adult social behaviour questionnaire; ATP: adenosine triphosphate; BDI-FS: Beck

6MWD: 6-min walk distance; 6MWT: 6-min walk test; AE: Acute exacerbation; ATS: American Thoracic Society; CPFE: Combined pulmonary fibrosis and emphysema; CTD-ILD: Connective

In this study there was no analysis of prognostic factors associated with nei- ther progression of cases initially diagnosed as plasmacy- toma into myeloma nor an assessment of

Because of the dense adhesions completely surrounding the IOFB, additional dissection with the vitreous cutter was necessary to free the fibrotic adhesions extending from the

To review published literature to identify when and how patients and health care practitioners have been involved in knowledge mobilisation activity and the impact this may have had