• No results found

Risk mitigation in electric power systems: Where to start?

N/A
N/A
Protected

Academic year: 2020

Share "Risk mitigation in electric power systems: Where to start?"

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1 A list of our TTC model inputs
Fig. 1 Risk-based decision-support methodology for prioritization
Fig. 2 A topological map of the studied electricity provider network
Table 2 The shared system state SQ
+7

References

Related documents

As SWOne does not provide, or arrange to provide, the relevant records in relation to those premises where they fulfil the role, the premises manager is operating without

The same systems also catalysed the transfer hydrogenation of nitroarenes using NaBH4 as the reducing agent proved and near quantitative yields of anilines could be obtained in short

The four meteorological variables with the most influence on ozone formation/destruction and concentrations at Kemaman station during daytime are the wind speed: 26.85%;

While the research suggests that beliefs play an important role in teachers ’ work, an apparent mismatch between teachers’ individual beliefs and values and wider

Fourth, the purpose of housing and employment as the operational measures of urban sprawl, as opposed to population, is to relate the economic consequences of sprawl

The NOM portal provides a set of standardized XML DTD definitions that form an ontology for the simulation configuration and the molecular structure definition. This standard

Your Online Application will not be registered unless you upload your photo, signature and thumb impression as specified. a) In case the face in the photograph, signature and

Thus for those wishing to lose weight but maintain or even increase lean body mass in specific skeletal muscles, I recommend at least 1.5g of high- quality protein per pound of