Tap, Connection & Meter Set Charges

(Charges Effective Since 1/1/09)

NEW CONNECTION CHARGES

TAP SIZE

NEW NEW TOTAL

CONNECTION CONNECTION COMBINED CHARGE-Water CHARGE-Sewer FEE

1"** $ 2,620.00 $ 2,235.00 $ 4,855.00 1.5" $ 5,895.00 $ 5,029.00 $ 10,924.00 2" $ 10,480.00 $ 8,940.00 $ 19,420.00 4" $ 41,920.00 $ 35,760.00 $ 77,680.00 6" $ 94,320.00 $ 80,460.00 $ 174,780.00 8" $ 167,680.00 $ 143,040.00 $ 310,720.00 10” $ 262,000.00 $ 223,500.00 $ 485,500.00 12” $ 377,280.00 $ 321,840.00 $ 699,120.00

**1” tap will be made for 5/8” and 3/4” meters

Connection Charges For Fire Service Connections

(Charges Effective Since 1/1/09)

TAP

NEW FIRE

NEW FIRE

TOTAL

CONNECTION

CONNECTION

COMBINED

SIZE

CHARGE-Water

CHARGE-Sewer

FEE

1"

**

$ 2,620.00

$ 2,235.00

$ 4,855.00

1.5"

$ 5,895.00

$ 2,235.00

$ 8,130.00

2"

$ 10,480.00

$ 2,235.00

$ 12,715.00

4"

$ 41,920.00

$ 5,029.00

$ 46,949.00

6"

$ 94,320.00

$ 8,940.00

$ 103,260.00

8"

$ 167,680.00

$ 35,760.00

$ 203,440.00

10”

$ 262,000.00

$ 80,460.00

$ 342,460.00

12”

$ 377,280.00

$ 143,040.00

$ 520,320.00

(2)

NEW METER SET FEES 7/1/15

New PD Meter Set W/Radio MTU – ¾ ”short

$440

New PD Meter Set W/Radio MTU –¾”

$490

New PDMeter Set W/Radio MTU –1”

$550

New Meter PD Set W/Radio MTU –1.5”

$750

New Meter PD Set W/Radio MTU –2”

$940

New Mag Meter Set W/Single Port MTU –2”

Closed coupled, AC Power

$3,585

New Mag Meter Set W/Single Port MTU –2 1/2”

Closed coupled, AC Power

$3,960

New Mag Meter Set W/Single Port MTU – 3”

Closed coupled, AC Power

$3,660

New Mag Meter Set W/Single Port MTU –4”

Closed coupled, AC Power

$ 4,300

New Mag Meter Set W/Single Port MTU –6”

Closed coupled, AC Power

$4,600

New Mag Meter Set W/Single Port MTU – 8”

Closed coupled, AC Power

$5,620

New Mag Meter Set W/Single Port MTU –10”

Closed coupled, AC Power

$6,072

New Mag Meter Set W/Single Port MTU –12”

Closed coupled, AC Power

$6,950

3”-6” Domestic meters will now all be Mag meters unless approved for the compound style under special circumstances by Management. All Mag meter prices include a single port mtu and require AC power.

Deduct meters do not have to be Mag meters, however Blowdown meters must be Mag

(3)

New Mag Meter Set –5/8” With Single Port MTU Closed coupled, AC Power

$3,200

New Mag Meter Set –¾” With Single Port MTU Closed coupled, AC Power

$3,200

New Mag Meter Set –1” With Single Port MTU Closed coupled, AC Power

$3,200

New Mag Meter Set –1.5” With Single Port MTU Closed coupled, AC Power

$3,440

New Mag Meter Set –2” With Single Port MTU Closed coupled, AC Power

$3,585

MTU Radio Unit – Single Port

(Replacement of Customer Damaged)

$170 MTU Radio Unit – Dual Port

(Replacement of Customer Damaged)

$195 MTU Radio Unit – Single Port Extended

Range

(Replacement of Customer Damaged)

$182

MTU Radio Unit – Dual Port Extended Range

(Replacement of Customer Damaged)

$210

*Remote vs. Closed Coupled to be determined by Utility

NEW METER CHANGE OUT FEES 7/1/15

** These fees should be used for ALL damaged meters including hydrant meters**

PD Meter Changeout – 3/4”short NO MTU/horn @ customer's request

$240

PD Meter Changeout – 3/4” NO MTU/horn @ customer's request

$240

PD Meter Changeout – 1” NO MTU/horn @ customer's request

$290

PD Meter Changeout – 1.5” NO MTU/flange @ customer's request

$580

PD Meter Changeout – 2” NO MTU/flange @ customer's request

$745 Mag Meter Changeout – 5/8" NO MTU/cable $3,070

Closed coupled @ customers request

(4)

Mag Meter Changeout – 1" NO MTU/cable $3,070 Closed coupled @ customers request

Mag Meter Changeout – 1.5" NO MTU/cable $3,310 Closed coupled @ customers request

Mag Meter Changeout - 2" NO MTU/cable $ 3,675 Closed coupled @ customers request

Mag Meter Changeout – 2 1/2" NO MTU/cable $ 4,050 Closed coupled @ customers request

Mag Meter Changeout - 3" NO MTU/cable $3,750 Closed coupled @ customers request

Mag Meter Changeout - 4" NO MTU/cable $4,200 Closed coupled @ customers request

Mag Meter Changeout - 6" NO MTU/cable $4,495 Closed coupled @ customers request

Mag Meter Changeout - 8" NO MTU/cable $5,515 Closed coupled @ customers request Mag Meter Changeout - 10" NO MTU/cable $ 5,970

Closed coupled @ customers request

Mag Meter Changeout - 12" NO MTU/cable $ 6,845 Closed coupled @ customers request

Replace Damaged Mag Meter Transmitter $1,750 Replace Damaged Mag Meter Transmitter with

Upgrade Conversion Kit

$2,965 New UL Rated Fire Meter Change out with ¾”

I-Perl Meter

$490 UL Rated Fire Meter Set with ¾” I-Perl Meter $280

(5)

WATER SERVICE TAP FEES 7/1/15

(Referred to as “Water Service Connection” in July 1, 2015 City of Ann Arbor

Water Utilities Department Rules and Regulation Document)

SIZE OF SERVICE CONNECTION CHARGE - UTILITY DUG CHARGE - CONTRACTOR DUG

1” $ 5,819 $ 730

1.5” Figure 4(Domestic & Fire Supp) n/a $ 1502

1.5” $ 5,981 $ 1103

2” $ 6,108 $ 1377

2” Figure 4(Domestic & Fire Supp) n/a $ 1746 4” & Larger Time & Material

SANITARY & STORM SEWER TAP FEES

(Referred to as “Sewer Service Connection” in July 1, 2015 City of Ann Arbor

Water Utilities Department Rules and Regulation Document)

The sewer tap fees for sanitary sewer and storm sewer shall be in the amount of $582.00 each, payable at the time of application for a sewer tap permit from the Water Utilities Customer Service Department.

CONVERSION CREDITS FOR METER SIZE ENLARGEMENT

Whenever water meters serving an existing premises are enlarged and the customer originally paid a water permit charge based on meter size, the original meter size will be converted to tap size and the difference between the equivalent tap size and the actual tap size shall be levied. (Ordinance No. 49-03; 2:22 and 2:42.4)

The corresponding dollar amounts for equivalent tap size for both water and sewer connections are provided in the chart below.

ORIGINAL METER SIZE

EQUIVALENT TAP SIZE WATER CONNECTION CHARGE

EQUIVALENT TAP SIZE SEWER CONNECTION CHARGE

5/8” $ 2,620.00 $ 2,235.00 3/4 “ $ 4,094.00 $ 3,492.00 1” $ 5,895.00 $ 5,029.00 1.5” $ 10,480.00 $ 8,940.00 2” $ 23,580.00 $ 20,115.00 3” $ 41,920.00 $ 35,760.00 4” $ 65,500.00 $ 55,875.00 6” 128,380.00 $109,515.00

The charge that the customer must pay is calculated by subtracting the credited amount identified in the chart above, from the new meter (equivalent tap) size in the Connection Charges table (see previous page). For example, if a customer is going from a 5/8” meter to a 1.5” meter, the water connection charge credit will be $2620.00 and the sewer connection charge credit will be $2235.00. The new water

connection charge will be $5895.00 and the new sewer connection charge will be $5029.00

$5895.00 - $2620.00 = $3,275.00 (Water Service Connection Charge - existing service credit) $5029.00 - $2235.00 = $2,794.00 (Sewer Service Connection Charge - existing service credit)

References

Related documents

[9] Zapata (2002) provides a summary of many approaches to security features in routing protocols in mobile ad-hoc networks (MANET) describing at the same time, secure

In short, the Sinclair and Coulthard approach lacks a developed social orientation in failing to consider how relations of power have shaped discourse practices, and in failing

6 Note that equation (15) can be interpreted as the trade balance equilibrium condition.. GPT, and it takes a certain amount of time for the switch to the new GPT to occur. Until

In this paper, we describe the implementation of support for Time-of- Flight (TOF) Positron Emission Tomography (PET) for both listmode and sinogram data in the open source Software

With its strategic location, unique and attractive facilities, the management of Hotel XYZ Safari Resort felt the need to conduct strategy analysis to capture the

Matching funds are available in Fund 353, Local Option Sales Tax (LOST) IV, Cost Center 210106, “Transportation & Drainage”; Object Code 56301, “Improvements Other

Applying knowledge of phonology (the sound system), morphology (the structure of words), syntax (phrase and sentence structure), semantics (word/sentence meaning), and

During the first step in the software risk management process, risks are identified and added to the list of known risks.. The output of this step is a list of project-specific