Environmental Data
Collection: Barco Case Study
EDM workshopNYSE
Euronext
90+ 3,980 1.156
International company Headquartered in Belgium Stocklisted (BAR) on
NYSE Euronext Brussels
Presence in more
than 90 countries Employees sales in 2012 Billion euro
You will find us where images are critical to professionals
Business areas
Four core divisions, four wholly-owned ventures
Healthcare
Projection Advanced
Visualization
Defense & Aerospace
Flagship products
10 million 43,000 unlimited 10x 1 click 71°C Lumens for world’s brightest cinema projector Pixels of grayscale perfection Number of sources with Barco’s networked control rooms concept More silent than competition in its class Share your ideas on screen with just one clickOur rugged displays can
withstand temperatures
Barco’s role in the GreenElec project
Contribute to build components inventory by
providing Full Material Declarations for PCBAs
Discussing possible improvements in:
▫ PCBA design: interfaces, connections, components with
higher recyclability
▫ Product: mechanics, connections, ease of disassembly
Barco’s ECO office: aims and services
Set up in 2010 Objectives:
To support the Barco
community in ensuring all Barco products are
compliant with worldwide current and future
requirements.
To drive the integration of
sustainable development
principles into Barco
products and processes.
Handling customer requests related to environmental compliance,
ecodesign, energy efficiency and recyclability
Issuing certificates of compliance for environmental standards such as RoHS, REACH and
WEEE Directives
Reporting the compliance status of our Bills of Materials during the NPI
process
Providing compliance and ecodesign advice to R&D
Barco’s environmental management system
EMS
ECO requirements ECO sourcing ECO monitoring ECO design ECO communicationECO monitoring: Barco Supplier Sustainability
Programme
• more than 1200 Barco suppliers have been requested to proof their commitment to environmental compliance by sending and exchanging information about the chemical composition of their products.
commitment
• Barco has provided its suppliers with educational material explaining what are the obligations set by international environmental standards
training
• As part of its proactive approach to environmental compliance, Barco is following the international trend to opt for encouraging suppliers to provide a Full Material Disclosure
Full
ECO monitoring: our data collection activities
HOW: We collect material information from every
supplier for every product part
WHO: We do not do this alone. This is done by
GreenSoft, US company based in California with a data factory in China and offices around the world. Our sourcing department helps us to solve
escalations.
WHY: To achieve compliance we need to know
ECO monitoring: GreenSoft Technology
▫ US company founded in 2002 ▫ Specialized in providing
environmental compliance content management tools
▫ GreenSoft collects data and has
developed software to manage and report on data
▫ ISO 9001 certified
▫ Main customers: Thales, Texas
Instruments, etc.
Who is GreenSoft? Collect Interpret certificates
Validate
Full material
declarations
store
update Test reports
ECO monitoring: data collection process
Sourcing department supports escalations GreenSoft elaborates and validates information
GreenSoft collects information from suppliers
Environmental data requirements
RoHS CoC
List of Exemptions
List of
Batteries Full Material Declaration
Restricted Substance Decl.
REACH CoC
Declaration in BOMcheck.net
Declaration using Barco template Supplier's own format
IPC 1751A (Class 3) or IPC-1752 (Class 5)
GreenSoft to interpret/validate the data and deliver data package for GDMgr
Barco to follow up if not possible if not possible Required Data Acceptable Formats Internal Process Deliver to: ECO
Roll-up and reporting substances on product level
Weight end product
ECO monitoring: full material declarations
We ask our suppliers primarily for Full Material
Declarations: Why?
▫ FMD is not a legal requirement but is an element of a tactical
approach to compliance management
▫ This allows us to de-risk our products against future regulations ▫ This allows us to de-risk products already during the NPI process ▫ This allows us to answer customer surveys / customer requests ▫ This helps us to conduct LCA studies more accurately
▫ This allows us to locate industry-restricted materials in our
products and to seek for alternatives (Plasticizers, flame retardants
▫ This allows us to have an indication of the recycling value or
ECO monitoring: Tool
▫ We use the “GreenData Manager” tool (9K USD -> 57K USD) - Includes all data from suppliers
- We can issue reports against ROHS,REACH and any other substance list (also customer-tailored)
- We can search for a substance across all our BOMs
- No link to our ErP system yet. Tool has limited access.
- COST OF THE ASSESSMENT: 10-5 USD * part (volume dependant)
Full Material Declarations IPC-1752A Reports against customized rules China ROHS compliance table
GreenData Manager
GreenData Manager
Example of Full Material Declaration
ECO monitoring: data collection for PCBAs
PCBAs:
▫
Barco collects data for all standard parts in
the BOM
▫
EMSs give info for soldering paste and
process
▫
EMSs give info about PCB manufacturer
▫ECO contacts PCB manufacturer for data
ECO monitoring: data collection for mechanical parts
Mechanical Parts
▫
New process established with involvement of
mechanics working group within Barco
- ECO gets list of parts from ProEngineer tool
- List contains weight and material for parts
- GreenSoft checks list of surface treatments
Conflict Minerals
In 2011 Barco starts investigation in the supply
chain on conflict minerals (gold, tin, tantalum, tungsten)
More than 200 suppliers investigated, 80% of
response
Use of EICC forms – 1635 smelters identified and
reported
Results of our assessment 2013
Total parts in database:
Total FMDs:
Total CoCs:
For which parts we do
not get FMD
Average duration of
assessment for one display 34327 19004 8438 Mechanics, plastics, PCBs Beginning: 6-12 months After 3 yrs of assessment: 3-4 months
Data for Greenelec PBA
Total parts for PBA
Total FMDs
For which parts we do
not get FMD
790 components+PCB
779
11 components+PCB
▫ Resettable fuse, ferrite
Issues encountered
Suppliers not ready to collect and share information
Very difficult to get material declarations for plastic
parts due to confidentiality and IP reasons
Collecting data requires infrastructure and
resources: tools and people to collect, interpret, validate and maintain information
The industry lacks a common standard/way to
share environmental information
Concept of full material declarations difficult to
accept by manufacturers as it is not mandatory by law
Internal Change Management