• No results found

Mission Critical DataCentres

N/A
N/A
Protected

Academic year: 2021

Share "Mission Critical DataCentres"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

PROJECT MANAGEMENT, DESIGN ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING, FACILITIES & ASSET MANAGEMENT WWW.SEPAM.COM

Mission Critical

DataCentres

www.sepam.com | www.comitass.com | www.acis-i.com

“Your partner in delivering your vision of an

enhanced Business and Living environment”

(2)

CP69 Perimeter Fence, CCTV & Access

Control

Project Scope:

Contract includes the Perimeter Security Systems Enhancement (PSSE) for the New Doha International Airport including 43km of double fence, PIDS, static CCTV, PTZ CCTV, Thermal Cameras, Marine RADAR, Ground RADAR, High Secuirty Access Control Points, which include K rated Rising Bollards, Final Denial Barriers, Face Recognition, Vehicle Liscence Plate Recognition, and under vehicle surveilance Cameras, X-Ray Scanning machines, and a full Perimeter System Information Management System (PSIMS)

Scope of works:

Sepam , providing Project Management Support, were appointed as site management and coordination of contractor activities on behalf of Johnson Controls International. Procurement and installation of low voltage systems. Management and commissioning of CCTV, Access Control Points and all Substations. QA/QC Management for the Project and commissioning of specialist systems.

Project Name: CP 69 – Perimeter Fence, CCTV & Access Control

Project Owner: NDIA

(3)

Sepam, providing Project Management Support, were appointed as site management and coordination of contractor activities on behalf of Johnson Controls International. Manage Fit Out work of installation and commissioning of the high end facades in the control centres. Fire Alarm integration and commissioning. ELV procurement, installation and commission. Modification and commissioning of the HVAC system. Implement QA/QC procedures

Project Name: CP 75 – Terminal Operations Centre

Project Owner: NDIA

Project Duration: 18 months

New Doha International Airport (NDIA),

Qatar – CP 75

Project Scope: New Doha International Airport’s package 75 scope includes fit out works within the shell walls of seven Control Centres in Passenger Terminal complex, Qatar Airways Operations Control Centre in Airline Operations Facility and Provision and installation workstation.

(4)

Next Generation Data Centre > Power

Usage Effectiveness

PUE: 1.34 IT Power 75% UPS Losses 5% Ventilation 20% Cooling0% • Notes

– Based on IT load of 640kVA – Calculation presumes

• Hot aisle / cold aisle containment, with cabinet chimney containment (supply air: 22C, return air 37C)

• Variable speed fans throughout installation • Full air ventilation (Active hot/cold control) • High Efficiency UPS

• Consumption

– 8,944MWh per annum (9.74% saving on chilled data centre)

• Considered exceptional PUE maximising free cooling

Server Load 640.00 kVA

UPS Efficiency 95% 673.68 Distribution losses 1.50% 10.11 Data Hall Supply Air Fan No1 54.00 37.26 Data Return Air Fan No1 33.00 22.77 Cooling System No1 0.00 0.00

Fan Losses 1.09 5.40

Data Hall Supply Air Fan No2 54.00 37.26 Data Return Air Fan No2 33.00 22.77 Cooling System No2 0.00 0.00

Fan Losses 1.09 5.40

Data Return Air Fan No3 33.00 22.77 Cooling System No3 0.00 0.00

Fan Losses 1.09 5.40

UPS Supply Air Fan 0.00 7.50 UPS Return Air Fan 0.00 5.50

DX Current 0.00

Fan Losses 10% 1.30

total 857.13

PUE 1.3392618

Annual Total using available free cooling 8944644.8 kW-hr

Reduction in consumed power -9.74%

(5)
(6)

SUITABLY QUALIFIED EXPERIENCED PROFESSIONAL --SQEP

A person who is assessed as competent, on the basis of appropriate

qualifications, training and experience.

This includes where required,

undertaking or supervising identified duties or tasks which may affect safety

of operations on the site or any duties assigned by or under any conditions or

arrangements required under Site Liscence conditions.

PROGRAM MANAGEMENT AND

CONSTRUCTION (PM&C)

(7)

SEPAM

will the Develop Project Organisation

SEPAM

will Identify those roles which require SQEP status

SEPAM

undertake job analysis

SEPAM

will identify the competencies required

Draw from the pool of skilled

SEPAM

employees

– HR database

– Training Records

SEPAM

undertake Training Needs Analysis

SEPAM

Design any necessary Training Programmes

SEPAM

Operate a Formal Assessment of Competence Procedure

PROGRAM MANAGEMENT AND

CONSTRUCTION (PM&C)

(8)

Formal Assessment of Competence Interogate SEPAM Database of skilled Employees Project Organisation Job Analysis Identification of Competencies Training Program Design

PROGRAM MANAGEMENT AND

CONSTRUCTION (PM&C)

(9)
(10)
(11)
(12)

Group Offices

UNITED KINGDOM

Sepam UK Ltd

Q West, Great West Road, Brentford, Middlesex, TW8 9BS T: +353 52 6183600 F: +353 52 6122674 REPUBLIC OF KAZAKHSTAN Sepam LLC Home 4A,

Smagulova Street, Atyrau Post Code 060005 T: +7 712 24 65 202/205 F: +7 712 25 65 200

QATAR

Sepam Middle East WLL

ABA Tower, HSBC Building, 4th Floor, Office No. 401 Airport Road, Doha Qatar T: +974 4406 9661 F: +974 4431 9883

KINGDOM OF SAUDI ARABIA

PM&C Saudi Arabia Co. LTD

Room no 3-7, Palm Centre Al Fanatir, Royal Commission, Jubail – 31961, KSA

BAHRAIN

Sepam Middle East WLL

Suite 1114

Bahrain Financial Harbour, East Tower, 11th Floor

Manama, Kingdom of Bahrain T: + 973 16 53 62 39

F: + 973 176 125 97

UNITED ARAB EMIRATES

Sepam Project Management & Construction LLC

PO Box 114404,

11thFloor Office No. 1102,

Muroor Street, Abu Dhabi T: +971 267 45484 F: +973 1772 0351

CHINA

Sepam Engineering & Consulting

2D, East Hope Plaza, No 1777 Century Ave, Pudong, Shanghai, China T: +86 21 623 623 01 F: +86 21 623 632 02

AMERICAS

Sepam Americas Inc

3100 South Gessner,

Suite 200,Houston, Texas 77042 T: +1713 789 5445

F: +1713 789 5463

KINGDOM OF SAUDI ARABIA

Sepam Saudi Arabia Co.

Al Olaya Building Makkah Al Mukaramah St. Al Khobar 31952 T: +966 3 893 5553 IRELAND Sepam International 122 Rock Road Booterstown Co. Dublin T: +353 1 2196626 IRELAND

Sepam Specialist Limited

Cusack House, 41- 44 Irishtown, Clonmel, Co. Tipperary T: +353 52 6183600 F: +353 52 6122674

INDIA

MOLD-TEK Technologies Limited.

Door No:8-2-293/82/A/700 Plot No:700,Road No:36,

Jubilee Hills, Hyderabad 500033 A.P, INDIA

T: +91-40-40300300

OMAN

Sepam

P.O Box 3390, PC 111, Seeb Sultanate of Oman

References

Related documents

[r]

[r]

198 يقارعلا يزكرلما كنبلل ةعباتلا ثابحلااو ءاصحلال ةماعلا ةيريدلما ( ةنس نم لكل ةيونسلا اتهارشن في 2003 ( و ) 2004 ،) لاو ةجردبو ليودلا كنبلا

Deduct contribution on Form D-400 Schedule S, Part C, Line 18 if itemizing Any person who has already filed a 2014 North Carolina income tax return and whose federal taxable

No part of this report may be reproduced or transmitted in any form whatsoever, electronic, or mechanical, including photocopying, recording, or by any informational storage

Despite being oft en considered a frontrunner, dilute sulfuric acid hydrolysis has important limitations. Its very corrosive environment mandates exotic and expensive

To meet the entry requirements for this programme, students will need to complete a BSc with a major in Computer Science and including COMP 308, and a minor in Media Design