PROJECT

PROJECT No. No. 5248 5248 Doc. Doc. No. No. 5248-00-FA-45248-00-FA-4049049 Rev. 1Rev. 1

EARLY WORKS

EARLY WORKS

CONSTRUCTION INTERFACE PLAN

CONSTRUCTION INTERFACE PLAN

(2)

T

Table of able of CContont entent ss

1. 1. INTRODUCTIONINTRODUCTION...3...3 1.1 1.1 PurposePurpose...3...3 1.2 1.2 ObjectiveObjective...3...3 1.3

1.3 Definitions and AbbreviationsDefinitions and Abbreviations...3...3 1.4 1.4 ScopeScope...4...4 1.5 1.5 ReferencesReferences ...4...4 1.6 1.6 ResponsibilitiesResponsibilities ...5...5 1.7 1.7 CorrespondenceCorrespondence ...6...6 2.

2. LIST OF CONTACTSLIST OF CONTACTS...6...6

3.

3. GASCO – PROJECT MANAGEMENT TEAMGASCO – PROJECT MANAGEMENT TEAM...6...6

4.

4. GASCO – MAJOR PROJECTS GROUPGASCO – MAJOR PROJECTS GROUP...7...7

5.

5. CONTRACCONTRACTORS TORS E&P / E&P / SSUPPORUPPORT LT LOCATIOCATIONSONS...7...7 5.1

5.1 SeoulSeoul...7...7 5.2

(3)

1.

1. INTRODUCTIONINTRODUCTION

1.

1. 11 PURPOSEPURPOSE

The purpose

The purpose of of tt his plan ihis plan is s tt o outo outlliine Cne COONNTRTRAACCTOTORRS S majmaj or ior i ntnt erferf aces aces wiwitt h oth other Cher Companies,ompanies, Governmental Bodies and Entities required during the execution of the NGL4 Works on the Governmental Bodies and Entities required during the execution of the NGL4 Works on the R

Ruwais uwais FFacilacilitit y sy sitit e ae and tnd the buhe builil ding ading and opnd operaterat ion of tion of t he Phe Projroj ect ect CCamp.amp.

1.

1. 22 OBJECTIVEOBJECTIVE

Th

The plan identie plan identi ffies ies tt he nhe namames es of tof t he mhe majajor intor int erferf acace pae partrt iesies, , brief brief sscopcope ane and reasd reason for ton for t hehe interface plus the interface contact details. This document will be treated as a live plan interface plus the interface contact details. This document will be treated as a live plan which will be maintained and up dated as necessary.

which will be maintained and up dated as necessary.

1.

(4)

1.

1. 44 SCOPESCOPE

This pl

This plan addressan addresses es tt he majhe maj or or iintnt erferf aces aces requirequi red red tt o so support upport CCOONNTRTRAACCTOTORRS S sscope executcope execut ionion as agreed under the Contract.

as agreed under the Contract.

The scope in broad terms will cover the following categories: The scope in broad terms will cover the following categories:

 ThThe locatie locati on aon and Cnd Camamp conp consstt ructruct ion / ion / opeoperatrat ion.ion. 

 SecuritySecurity 

 Access to the Ruwais Facilities for manpower, plant, equipment and materials.Access to the Ruwais Facilities for manpower, plant, equipment and materials. 

 GGAASSCCO O contcont rrolloll ed areas ed areas wiwitt hihin tn the Rhe Ruwais Fuwais Facilacil itit yy 

 OOtt her Sher Stt akehakeholders witolders wit hin thin t he Rhe Ruwais uwais FFacilacilitit y e.g. Takreer, y e.g. Takreer, BBorougorouge, ete, et c.c. 

 CCOONTNTRRACACTOTOR R OOperperatat iions ons wiwitt hihin tn t he Rhe Ruwaiuwais s FFaciacilliitt yy

O

(5)

1.

1. 66 RESPONSIBILITIESRESPONSIBILITIES

1.6.

1.6.1 1 CConsonstt ructruct ion ion DDirir ectectoror

Contractors Construction Director will be the main contact and focal point for all Contractors Construction Director will be the main contact and focal point for all int

int erferf aces aces wiwitt h th the Che COOMMPPAANNY Y onsonsitit e represee representnt atativesives. . HHe is the fe is the f ocaocal l point point of of tt hehe site and responsible for all the Construction activities on the site. He will ensure site and responsible for all the Construction activities on the site. He will ensure tt his his proceprocedure is implemedure is implementnted oed on tn t he Phe Projroj ect.ect.

1.

1.6.6.2 2 CConsonstt ructruct iion on MManaganagerer

Will be responsible for the execution of works associated with the Temporary Will be responsible for the execution of works associated with the Temporary F

Faciacilliitt iies incles incl udiuding tng t he Che Camp tamp t hrhrough tough t he designathe designat ed Sed SUBUBCCOONTNTRRACACTOTORRSS..

1.

1.6.6.3 3 CConsonstt rructuct iion on IntInt erferf ace ace MManaganager er (C(CIMIM))

Will be the main contact and focal point for all CONTRACTOR interfaces. The CIM Will be the main contact and focal point for all CONTRACTOR interfaces. The CIM will be tasked with ensuring all the necessary documentation has been identified, will be tasked with ensuring all the necessary documentation has been identified,

(6)

1.

1.6.6.6 6 CCOOMMPPANANY Y IntInt ererfface ace CCooroordidinatnat oror W

Wiilll l proviprovi de asde asssiisstt ance tance t o to t he Che COONNTRTRAACCTOTORRS S CCIM IM on all on all iintnt erferf ace matace mattt ers.ers.

1.

1. 77 CORRESPONDENCECORRESPONDENCE

A

Alll l offoff iciici al al corrcorresespondepondence, nce, botboth ih in and out n and out wilwil l l be tbe t hroughrough th t he Che COONNTRTRAACCTOTORR’’ S S desdesignatedignated representative – The Construction Director.

representative – The Construction Director.

2.

2. LIST OF CONTACTSLIST OF CONTACTS

A

Att tt achment achment A A is a liis a li sstt ing of ing of tt he personnel and conthe personnel and cont act act detdet ailail s s wherwhere Ce COONNTRTRACACTOTOR R hashas iden

identt ifif ied an interfied an interf acace reque requiremenirementt ..

3.

3. GASCO – PROJECT MANAGEMENT TEAMGASCO – PROJECT MANAGEMENT TEAM

The C

(7)

4.

4. GASCO – MAJOR PROJECTS GROUPGASCO – MAJOR PROJECTS GROUP

The C

The COONNTRTRACACTOTOR R wiwilll l rrequiequirre te t o io intnt ererfface wace wiitt h Mh MAJOAJOR R PPRROOJEJECCTS TS GGRROOUP UP tt ypiypicalcallly on y on tt hehe following but not limited to:

following but not limited to: 1.

1. AAccesccess s tt o to t he Che COOMMPPANANY Y EExixisstt ing Oing Operatperat iing Fng Facilacil iitt ies ies – – perperssonnel, onnel, plplant ant and equipmentand equipment 2.

2. AAccesccess s tt o operato operat iional aronal areas eas ssuch as uch as TraiTrains ns 1,1,2 & 32 & 3 3.

3. AsAsssiisstt ance fance f or or SSecurecuriitt y of y of CCOONNTRTRACACTOTORRS S Areas wiAreas witt h rh relelatat iion ton t o GAo GASSCCO plantO plant 4.

4. HH2S 2S monitmonit oriori ngng 5.

5. HSHSE E InducInductt iionsons 6.

6. Permit to work systemPermit to work system 7.

7. VVehiclehicl e Ce Checks hecks ffor complor compl iiance witance wit h Gh GAASSCCO O requirequi rrementementss 8.

(8)

6.

6. SUBCONTRACTORSSUBCONTRACTORS

C

COONTRNTRACACTOR TOR wiwi lll l have a numbhave a number er iintnt ererffaces wiaces witt h key Sh key SUBUBCCOONTRNTRACACTORTORS S perperfforormiming tng thehe execution of part of the Works in accordance with Contract requirements. They will be fully execution of part of the Works in accordance with Contract requirements. They will be fully supervised, controlled and they will comply with all the Contract requirements.

supervised, controlled and they will comply with all the Contract requirements.

The ma

The majj or Sor SUUBBCCOONNTRTRAACCTS TS tt ypiypicallcall y wiy willl be as l be as ffolloll ows ows but but not not lliimimitt ed ted to:o: 1.

1. Pioneer CampPioneer Camp 2.

2. SSitit e Tempoe Temporarrary Fay Facilcil itit ies anies and Ed Earlarly Wy Worksorks 3.

3. Topo & GTopo & Geoteot ech Sech Sururveysveys 4.

4. Civil & BuildingsCivil & Buildings 5.

5. MMechaniechanical – cal – tt wo (2) wo (2) : : EEasast t and Wand Wesest t SScope scope splpliitt 6.

(9)

8.

8. CNIACNIA

The CONTRACTOR will require to interface with CNIA typically on the following but not The CONTRACTOR will require to interface with CNIA typically on the following but not limited to:

limited to: 1.

1. CCOONTRNTRACACTOTORR’’ S S camp camp llocatocat iion appon apprrovaloval 2.

2. CCOONTRNTRACACTOTORR’’ S S perpersonnel sonnel oioil l ffiieleld passd passeses 3.

3. CCOONTRNTRACACTOTORR’’ S S vehivehi clcle oie oil l ffiieleld passd passeses 4.

4. CCOONTRNTRACACTOTORR’’ S S camecamerra oia oil l ffiieleld passd passeses 5.

5. CCOONNTRTRACACTOTORR’’ S S designatdesignat ed camered camera / a / photphot ographerographer s s oioil fl f iieleld pasd passseses

9.

9. POLICEPOLICE

The C

(10)

11

11.. HEALTH AUTHORITY ABU DHABIHEALTH AUTHORITY ABU DHABI

The CONTRACTOR will require to interface with HAAD typically on the following but not The CONTRACTOR will require to interface with HAAD typically on the following but not limited to:

limited to: 1.

1. HAAD will be inspecting and provide approvals on the use of the completed Clinic in theHAAD will be inspecting and provide approvals on the use of the completed Clinic in the Camp.

Camp. 2.

2. HAAD will be inspecting and provide approvals on the use of the completed Clinic in theHAAD will be inspecting and provide approvals on the use of the completed Clinic in the Site Temporary Facilities.

Site Temporary Facilities. 3.

3. HHAAAAD D has has tt o appo approve any merove any medical dical persopersonnel tnnel t o be uso be used on ted on the Phe Projroj ect ect (t(t ypicallypicall y docty doctorsors and nurses).

and nurses).

12

12.. HOSPITAL(S)HOSPITAL(S)

C

COONNTRTRACACTOTOR R wiwilll l esestt abliabli ssh arrh arrangangementements s wiwitt h both bot h lh local hospitocal hospit als and Aals and Abu Dbu Dhabi Chabi Ciitt yy ho

(11)

6.

6. Installation of the new HP Flare line under the existing lines which run to the TAKREERInstallation of the new HP Flare line under the existing lines which run to the TAKREER  jetty

 jetty 7.

7. Permits to workPermits to work 8.

8. CCooliooling ng watwater workser works

All the above will require utilization of the TAKREER PTW system. All necessary personnel All the above will require utilization of the TAKREER PTW system. All necessary personnel will be trained accordingly in advance of any work.

will be trained accordingly in advance of any work.

15

15.. BOROUGEBOROUGE

The C

The COONNTRTRACACTOTOR R wiwilll l rrequirequir e te to into int erferf ace witace wit h Bh BOORROOUUGGE E tt ypiypicallcall y on ty on the fhe fololllowiowing ng but but notnot limited to:

limited to: 1.

1. Transportation of permanent equipment received via the Ruwais Port, through,Transportation of permanent equipment received via the Ruwais Port, through, adj

adjaceacent nt or over tor over t he Bhe Borougorouge exise existt ing faciing facillitit ies ies – – dependepending upoding upon tn the fihe fi nal agnal agreedreed R

(12)

1.

1. EEquipmentquipment , , columns columns and vesand vesssels sels shipmenthipment s to ts to t he porthe port .. 2.

2. OffloadingOffloading 3.

3. Transportation to siteTransportation to site

19

19.. ABU DHABI PORT AUTHORITYABU DHABI PORT AUTHORITY

The C

The COONTNTRRACACTOTOR R wiwilll l rrequiequirre te t o io intnt ererfface wiace wi tt h ABh ABU DU DHAHABBI POI PORRT AUT AUTHOTHORRITY tITY typiypicalcallly ony on the following but not limited to:

the following but not limited to: 1.

1. PPorort t paspassseses 2.

2. CCusustt oms oms clclearearanceance 3.

3. OOnward nward sshiphippiping tng to Ro Ruwais wheruwais where necese necesssaryary

20

(13)

1.

1. AAdvisdvise ane and sd seek aeek approvals pprovals ffor overlor overl and and matmaterierial / al / equipment equipment sshipmenthipment s s clasclasssifif ied asied as ODCs.

ODCs.

23

23.. ETISALATETISALAT

The CONTRACTOR will require to interface with ETISALAT typically on the following but not The CONTRACTOR will require to interface with ETISALAT typically on the following but not limited to:

limited to: 1.

1. SSupplupply of y of tt he IT and Che IT and Communicatommunicat ions connections connectiivitvit y fy f or tor t he JV he JV and Gand GAASSCCO O CCamp.amp. 2.

2. SSupply of upply of tt he IT he IT and and CCommunommunicaticat ions ions connconnectectiviivi tt y fy for tor t he She Sitit e Tee Temporary Fmporary Facilacilitit ies.ies.

24

24.. VENDORSVENDORS

The C

The COONNTRTRAACCTOTOR R wiwilll l requirequi rre te to into int erferf ace witace wit h Vh VEENNDDOORRS S tt ypiypicallcall y on ty on the fhe folloll owiowing ng but but notnot limited to:

limited to: 1.

1. Vendors required assisting construction in the physical completion of systems ready forVendors required assisting construction in the physical completion of systems ready for tt urnover turnover t o o PPrre-Ce-Commissommissioniioning ng / / CCommissommissioniioning.ng.

(14)

Abdul Aziz Al Badi

Abdul Aziz Al Badi SR.Project Manager SR.Project Manager  Not AvailableNot Available 0000979715150 0 - - 44444343606088 alalbabadidi@[email protected] Assaad Abdallah

Assaad Abdallah Project Coordinator Project Coordinator  Not AvailableNot Available 0000979715150 - 620 - 622727494955 aaaabdbdalalllahah@[email protected] Jose Luis Gameiro

Jose Luis Gameiro Project Manager Project Manager  Not AvailableNot Available 0000979715150 - 660 - 668989696900 jljlgagamemeiiroro@[email protected] Bob Al Borzi

Bob Al Borzi Project Manager Project Manager  Not AvailableNot Available 0000979715150 0 - - 64641212141400 bbbbororzizi@[email protected] Hisham Mansour 

Hisham Mansour  Project Manager Project Manager  Not AvailableNot Available 0000979715150 0 - - 81812121797988 hihishshamam.m.manansosourur@[email protected] Firose Hassan

Firose Hassan SecretarySecretary Not AvailableNot Available 0000979715150 - 5720 - 57258586868 firofiros.s.hahassssanan@[email protected]

GASCO RUWAIS ( EU )

GASCO RUWAIS ( EU ) A. MoussaA. Moussa

Major Projects Co-ordination Major Projects Co-ordination Department Superintendent

Department Superintendent Not AvailableNot Available 00009977115500--44115522777700 aammoouussaa@@ggaassccoo..aaee Cyril Pereira

Cyril Pereira Senior Operations Engineer Senior Operations Engineer  Not AvailableNot Available 00009977115500--66772211776655 ccppeerereiirraa@[email protected] CONTRACTOR - Seoul ( Petrofac )

CONTRACTOR - Seoul ( Petrofac ) KKuurrt t RReeeevveess PPrroojjeecct t DDiirreeccttoorr ++882 2 2 2 2200005 5 88449933 +9+9771 1 550 0 66333 3 66119966 KKuurrtt..RReeeevveess@@ppeettrrooffaacceemmiirraatteess..aaee C

Chhrriissttoopphheer r JJooyyccee PPrroojjeecct t CCoonnttrroolls s MMaannaaggeerr ++882 2 2 2 2200005 5 88449911 CChhrriissttoopphheerr..JJooyyccee@@ppeettrrooffaacc..ccoomm V

Viivveek k TTaannddoonn LLeeaad d PPrroojjeecct t CCoooorrddiinnaattoor r - - MMeecchh.. ++882 2 2 2 2200005 5 88440000 VViivveekk..TTaannddoonn@@ppeettrrooffaacc..ccoomm U

Uttkkaarrssh h DD..KKuullkkaarrnnii SSeenniioor r EEnnggiinneeeer r - - PPrroocceessss +8+82 2 2 2 2200005 5 88442299 UUttkkaarrsshh..kkuullkkaannii@@ppeettrrooffaacc..ccoomm

N.S.S. N.S.S. Venkateswaran Venkateswaran

P

Prriinncciippaal l EEnnggiinneeeer r - - IInnssttrruummeenntt ++882 2 2 2 2200005 5 88442244 VVeennkkaatteesswwaarraann..NN..SS..SS@@ppeettrrooffaacc..cc om

om K

Kiirraan n SShheetthh PPrriinncciippaal l EEnnggiinneeeer r - - EElleeccttrriiccaall +8+82 2 2 2 2200005 5 88442255 KKiirraann..SShheetthh@@ppeettrrooffaacc..ccoomm S

S..TThhiillaaggaarraajj PPrroojjeecct t PPrrooccuurreemmeennt t MMaannaaggeerr ++882 2 2 2 2200005 5 88442288 SSeennnniiaappppaann..TThhiillaaggaarraajj@@ppeettrrooffaacc..cc om

om P

Prraassaad d PPrraaddhhaann SSeenniioor r BBuuyyeerr ++882 2 2 2 2200005 5 88443322 PPrraassaadd..PPrraaddhhaann@@ppeettrrooffaacc..ccoomm P

(15)

Deshmukh

Deshmukh PPllaannnniinng g EEnnggiinneeeerr ++882 2 2 2 2200005 5 88441188 comcom V

V. . SSaaiibbaabba a PPrroojjeecct t MMaannaaggeer r ++882 2 2 2 2200005 5 88997744 VV..SSaaiibbaabbaa@@ppeettrrooffaacceemmiirraatteess..aaee S

Saarrddaanna a YYuuvvrraajj IInntteerrffaacce e MMaannaaggeerr ++882 2 2 2 2200005 5 88440022 SSaarrddaannaa..YYKK@@ppeettrrooffaacceemmiirraatteess..aaee B

Baacchhiir r CChhaaaayyaa JJuunniioor r PPrroojjeecct t EEnnggiinneeeerr ++882 2 2 2 2200005 5 88442211 [email protected]@petrofacemirates. ae

ae V

Viijjaayykkuummaar r NNaaiir r LLeeaad d DDooccuummeennt t CCoonnttrroolllleerr ++882 2 2 2 2200005 5 88441177 [email protected]@petrofacemirate s.ae

s.ae P

Prraaddeeeep p AAggrraawwaall PPrroojjeecct t AAccccoouunnttaanntt ++882 2 2 2 2200005 5 88443300 PPrraaddeeeepp..AAggrraawwaall@@ppeettrrooffaacc..ccoomm +82 2 2005 8430

+82 2 2005 8430 CONTRACTOR - Seoul (GS )

CONTRACTOR - Seoul (GS ) TToom m YYuu DDeeppuutty y PPrroojjeecct t DDiirreeccttoorr ++882 2 2 2 2200005 5 7722000 0 ++882 2 110 0 5588998 8 55550055 [email protected]@gsconst.co.kr

C

Chhaann--HHeee e CChhaanngg DeDeppuutty y SSiitte e MMaannaaggeerr +8+82 2 2 2 2200005 5 7722440 0 +8+82 2 119 9 33334 4 33113355 [email protected]@gsconst.co.kr

S

Soooo--KKaanng g SShhiimm CCoonnssttrruuccttiioon n PPllaannnneerr--11 ++882 2 2 2 2200005 5 77229911 ++882 2 1100--88663344--88553377 [email protected]@gsconst.co.kr

J

Juunngg--HHo o LLeeee CCoonnssttrruuccttiioon n PPllaannnneerr--22 ++882 2 2 2 2200005 5 7722443 3 ++882 2 110 0 2288334 4 88228888 [email protected]@gsconst.co.kr

Y

Yoonngg--KKyyu u LLeeee DDiisscciipplliinne e SSI I ((CCSSAA) ) ++882 2 2 2 77228 8 1122664 4 ++882 2 111 1 9955558 8 44994466 [email protected]@gsconst.co.kr

D

Duukk--IIn n EEuumm DDiisscciipplliinne e SSI I ((MMeecchhaanniiccaall)) ++882 2 2 2 2200005 5 7722449 9 ++882 2 111 1 77888 8 44885533 [email protected]@gsconst.co.kr

Y

Yoooonn--TTaae e KKiimm DDiisscciipplliinne e SSI I ((PPiippiinngg)) ++882 2 2 2 2200005 5 7722885 5 ++882 2 111 1 33663 3 77991122 [email protected]@gsconst.co.kr

E

Euunn--KKyyuun n SShhiinn DDiisscciipplliinne e SSI I ((IInnssttrruummeenntt) ) +8+82 2 2 2 2222559 9 3344667 7 ++882 2 110 0 6666000 0 44330022 [email protected]@gsconst.co.kr

M

Myyuunngg--HHa a KKiimm DDiisscciipplliinne e SSI I ((QQAA//QQCC) ) ++882 2 2 2 2222559 9 55113311 [email protected]@gsconst.co.kr

R

Roobbeerrt t BBeerrrryy HHSSSSE E MMaannaaggeerr ++882 2 2 2 2200005 5 9999115 5 ++882 2 110 0 2299001 1 22225511 [email protected]@gsconst.co.kr

H

Heeee--BByyuum m NNoo PPrroojjeecct t PPrrooccuurreemmeennt t MMaannaaggeerr ++882 2 2 2 2200005 5 88440033 +8+82 2 110 0 8877552 2 33113366 [email protected]@gsconst.co.kr

CONTRACTOR - Abu Dhabi

(16)

A

Arrcchhaanna a MMaattttee PrroPojjeecct t SSeeccrreettaarryy

+971 2 656 1078

+971 2 656 1078  Archana.Matte@petrofacemirates. Archana.Matte@petrofacemirates. ae

ae G

Gooppaalla a GGoouudd SS//C C PPrroojjeecct t EEnnggiinneeeer  r   ++99771 1 2 2 66556 6 11000088 GGooppllaa..GGoouudd@@ppeettrrooffaacceemmiirraatteess..aaee A

Allttaaf f KKhhaann DDyy. . PPrroojjeecct t DDiirreeccttoor  r   ++99771 1 2 2 66556 6 11001144 AAllttaaff..KKhhaann@@ppeettrrooffaacceemmiirraatteess..aaee  A

 Avivinanash sh GGososavavii PProrojjecects ts & & CoConsnsttruructctioion n SuSupppoportrt Manager 

Manager  ++99771 1 2 2 66556 6 11003366 AAvviinnaasshh..GGoossaavvii@@ppeettrrooffaacc..ccoomm Dineshkar Singh Dineshkar Singh Katoch Katoch  Admin. Manager   Admin. Manager  +

+99771 1 2 2 66556 6 11003388 DDiinneesshhkkaarr..KKaattoocchh@@ppeettrrooffaacc..ccoomm N

Niiggeel l BBuuttlleerr SSuub b CCoonnttrraacctts s MMaannaaggeer  r   ++99771 1 2 2 66556 6 11007766 NNiiggeell..BBuuttlleerr@@ppeettrrooffaacc..ccoomm Jeganathan Jeganathan Kumaresan Kumaresan Contracts Engineer  Contracts Engineer  +971 2 656 1113 +971 2 656 1113 [email protected]@petrofac .com .com Ka

Kalylyanana Ka Kumumar ar T.T. SeSeninior or PlPlanannining ng EnEngigineneer er  ++99771 1 2 2 66556 6 11005522 KKaallyyaannaakkuummaarr..TT@@ppeettrrooffaacc..ccoomm R

Roohhiit t BBaakksshhii SSeenniioor r QQA A EEnnggiinneeeer  r   ++99771 1 2 2 66556 6 11005533 RRoohhiitt..BBaakksshhii@@ppeettrrooffaacceemmiirraatteess..aaee R

Rooy y HHaannkkss CCoonnssttrruuccttiioon n DDiirreeccttoor  r   ++99771 1 2 2 66556 6 11008866 RRooyy..HHaannkkss@@ppeettrrooffaacc..ccoomm Br

Browown Vn Vijijay Kay Kumaumarr DeDepuputy ty MaMananageger - Lr - Logogisistiticscs +971 +971 6 518 6 518 45904590 [email protected]@petrofacemirates.a B

Brriiaan n SStteewwaarrtt HHSSSSE E MMaannaaggeer  r   ++99771 1 2 2 66556 6 11006611 PPeerrrryy..SStteewwaarrtt@@ppeettrrooffaacc..ccoomm Marc Taylor (Support

Marc Taylor (Support Member)

Member)

Procurement Manager  Procurement Manager 

+

+99771 1 2 2 66556 6 11001177 MMaarrcc..TTaayylloorr@@ppeettrrooffaacceemmiirraatteess..aaee Muhammad Khan Muhammad Khan (Support Member) (Support Member) Finance Manager  Finance Manager  +971 2 656 1068 +971 2 656 1068 [email protected]@petrofacemirat es.ae es.ae SUBCONTRACTORS SUBCONTRACTORS

(17)

DODSAL

DODSAL Ezzat AzizEzzat Aziz Construction Manager Construction Manager  Not AvailableNot Available 0000979715150 - 40 - 4575768686666 ezezzazat.t.fafahmhmy@[email protected] ACC

ACC NNaabbiil l KKaarrmmii TeTecch h & & CCoommmmeerrcciiaal l MMaannaaggeerr 002 2 - - 44110099881100 [email protected]@accsal.com

T

Toonny y SShhaahheeeenn PPrroojjeecct t MMaannaaggeerr 002 2 - - 44110099881100 05050 0 66112255550022 [email protected]@accsal.com

C

Chheehhaadde e MM. . ZZiinnaattii TeTennddeer r & & EEssttiimmaatte e MMaannaaggeerr 002 2 - - 66777711222255 00550 0 66661100007788 [email protected]@accsal.com

IMECO

IMECO SSoouuhheel l SSaalllloouumm HHeeaad d oof f TTeennddeerriinngg 002 2 - - 66444444770000 00550 0 77331188551166 [email protected]@imeco.com

A

Anniil l RRaammaacchhaannddrraann TTeennddeerriinng g EEnnggiinneeeerr 002 2 - - 66444400444455 00550 0 77112255660044 [email protected]@imeco.com

CNIA CNIA

POLICE

POLICE Gayathi Gayathi 02 02 - - 80823008082300

MUNICIPALITY

MUNICIPALITY MMaaddiinna a ZZaayyeed d OOffffiiccee 002 2 - - 88998888888888 A

AbbuuDDhhaabbii 0022--66777777992299

HEALTH AUTHORITY ABU DHABI HEALTH AUTHORITY ABU DHABI

HOSPITAL(S)

HOSPITAL(S) Ruwais Ruwais Adnoc Adnoc 02 02 - - 60223406022340 A

(18)

A Al l JJaazziirraa, , AADD 02 02 - - 66221144880000 N NMMCC,,AADD 0022--66333322225555 E Emmeerrggeennccyy 999988 CIVIL DEFENCE

CIVIL DEFENCE MMaaddiinna a ZZaayyeed d OOffffiiccee 002 2 - - 8888444400000044

T

TAAKKRREEEERR SShhaarriif f AAbbd d EEll--RRaahhmmaa

Engineering Development Engineering Development

S

Seeccttiioon n HHeeaadd NNoot t AAvvaaiillaabbllee 00009977115500--44115522777700 sssshhaaririf@[email protected] Cyril Prem Kumar 

Cyril Prem Kumar  Not AvailableNot Available 00009977115500--55998866550044 CCPPKK44994433@@ttaakkrreeeerr..ccoomm

B

BOORROOUUGGEE NNoorrmmaannGGrraanntt Construction Manager Construction Manager  NoNot t AAvvaaiillaabbllee NoNot t AAvvaaiillaabbllee [email protected]@borouge.com Sultan

Sultan Al Al ShehhiShehhi Sr. Project Manager Sr. Project Manager  Not AvailableNot Available 0000979715150-0-61616666868688 susultltanan.a.allshshehehhihi@[email protected] IRSHAD IRSHAD ADNOC ADNOC RUWAIS PORT RUWAIS PORT

ABU DHABI PORT AUTHORITY ABU DHABI PORT AUTHORITY

AIRPORT(S) AIRPORT(S)

(19)

ABU DHABI ELECTRICITY & WATER AUTHORITY ABU DHABI ELECTRICITY & WATER AUTHORITY

TRAVEL POLICE DEPARTMENT

TRAVEL POLICE DEPARTMENT PPoolliicce e HHQQ, , AADD 002 2 - - 44446 6 11446611 02 - 808 2300 02 - 808 2300 E

Emmeerrggeennccyy 0022--44446611446611 999999

ELIXER

ELIXER Ahmed HabibAhmed Habib Ruwais Plant Manager Ruwais Plant Manager  Not AvailableNot Available 0000979715150 0 - 6- 6151509093232 AhAhmemed.d.HaHabibib@[email protected] Froilan Manez

Froilan Manez Senior Engineer Senior Engineer  NNoot t AAvvaaiillaabbllee NNoot t AAvvaaiillaabbllee [email protected]@elixier.ae

ETISALAT ETISALAT VENDORS VENDORS LOCAL SUPPLIERS LOCAL SUPPLIERS

References

Related documents

Keywords: national policy, dual citizenship, naturalisation, minority policy Tibor Toró: The Hungarian Communities from the Neighbouring Countries after the Law of

Treven 1998, 24-26 opredeljuje management človeških virov takole: »Management človeških virov lahko opredelimo kot splet različnih aktivnosti, ki pripomorejo k ustreznemu

Located 5 minutes from I-75 in the City of Alachua, this private Park has easy access to the University of Florida (UF) in Gainesville and the Gainesville Regional Airport.. It

CFPP shared ILS will be required to support current and future standards and frameworks for all record and data types including, but not limited to, licensing, electronic

It is important to define the balance of responsibilities between the cloud providers and the university. For example, the provider will be responsible for

Product Name Technical Licences Technical Licenses Required/ Optional GIS 8.0 Required GIS_INTERACTIONSERVICE 8.0 Required ics_custom_media_channel 8.0