•  Towns of Cary and

Morrisville, RTP, RDU

•  Peak Day Demand of

29.02 mgd

•  64,000 meters

–  Water, Irrigation and

Reclaimed Water

•  Pit sets at the curb

•  70% residential

•  Culture of Conservation

–  Program started 1996

–  Tiered Water Rates

–  Realized GPCD reduction

Town of Cary Utility System

0

20,000

40,000

60,000

5x8 /

3x4

1" 1.5" 2" 3" 4" 6"

Number of Meters

(2)

T

OWN O

f C

ARY

Change Was Right for Cary

3

T

OWN O

f C

ARY

Cost Benefit Analysis X 3

(3)

T

OWN O

f C

ARY

How We Chose Our Direction

•  Hired independent experienced

experts

•  Prioritized Needs/Preferences

– Data: Read Frequency, Resolution,

Backflow, Reporting

– Physical opportunities and

challenges

– Risk tolerance

– Fancy features and big ideas

5

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

6

Advanced Metering

Infrastructure (Aquastar)

(4)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

7

Council Proposal Agenda

•  Meter Reading Today

•  Advanced Meter Infrastructure

•  Project Planning & Management

•  Project Benefits

•  Cost Benefit Analysis

•  Council Decision

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

8

Meter Reading Today

•  Currently manually

reading over 57,000

meters per month in

Cary and Morrisville

(5)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

9

Utility Management in the Future

via Aquastar

Water Meters

Regional Collectors on 8

Existing Towers and Tanks

Town Server

Web Presentment

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

10

Project Planning

•  Collaborative team based effort

•  Proposed a performance

management approach with

Johnson Controls

•  Identified the technology best

suited for this project

•  Developed a turnkey plan for

communication, implementation,

operation and maintenance

(6)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

11

Why Performance Management?

•  One independent vendor to

coordinate multiple providers

•  Price guarantee

•  Turn key solution

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

12

Selection Process

•  Selected Johnson Controls to

develop and manage project

•  Formal bid for meters

– 5/7/09 - Received bids from 6 providers

•  RFP for Technology

– 5/20/09 – Received proposals from 4

providers

•  RFP for Installation

– 8/4/09 – Received proposals from 5

(7)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

13

Why Johnson Controls?

•  Experience with water AMI

•  Size – financial strength, vendor

relationships

•  Shared values for performance

excellence and customer service

•  Flexible to meet Cary’s needs

•  Performance during project

development fulfilled high service

commitments

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

14

Project Management Plan

•  Performance Guarantee

– Meters

– Technology

– Installation

•  Customer Service & Communication

Plan

•  System Verification Plan

•  18 Month Schedule of Work

(8)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

15

Advantages of Aquastar

ü Increased Level of Customer

Service

ü Assist With Water Resource

Management

ü Environmental benefits

ü Improved Worker Safety

ü Cost Savings compared to

business as usual

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

Benefits

(Quantifiable)

Project Cost/Benefit Analysis

(17 year system life)

Net Costs

Net Capital

Costs

Operating

Costs

Project

Revenue

Meter

Maintenance &

Replacement

Water

Conservation

Meter

Reading

Interest

Expense

Net Benefit =

$ 2.4 M

(9)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

17

Utility Rate Impacts

7,000 Gallon Monthly Utility Bill - Rate Impacts from AMI Project

$85.00

$90.00

$95.00

$100.00

$105.00

$110.00

$115.00

FY

2012

2013

FY

2014

FY

2015

FY

2016

FY

2017

FY

2018

FY

2019

FY

2020

FY

2021

FY

2022

FY

2023

FY

2024

FY

2025

FY

2026

FY

2027

FY

Mon

th

ly W

a

te

r a

n

d

S

e

wer Util

ity B

ill

FY 2010 ADOPTED BUDGET without AMI FY 2010 with AMI cost savings estimates & some revenue increases

In FY2022 a customer using 7,000 gallons per month would save:

$3.95 per month

$47.40 per year

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

18

Project Budget

Current Budget: 16.7 million

Project Capital Cost: 17.8 million

Additional funding: 1.1 million

• Recognize Revenue from

• Surplus Material

.3 million

• Return of sales tax .8 million

1.1 million

(10)

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

19

Project Summary

ü Increased Level of Customer

Service

ü Assist With Water Resource

Management

ü Environmental benefits

ü Improved Worker Safety

ü Cost Savings compared to

business as usual

T

OWN O

f C

ARY

_______________________________________________________________________________________________________________________________________________________________

20

Questions?

Council Guidance

-

Staff recommends project

(11)

T

OWN O

f C

ARY

SO THEN WHAT?

•  A quick update

– Financials

– What we bought

– What we saved

– What we got - Data

_______________________________________________________________________________________________________________________________________________________________

21

Money, Money, Money

- Invest $18 Million

+ Benefit

$28

Million

(17 Years)

Bottom Line Net

Benefit: $10 Million

(12)

T

OWN O

f C

ARY

Investment: Technology

23

T

OWN O

f C

ARY

Investment: 60,000 Meters

and Installation

24

(13)

Investment: Regional Collectors

Antenna:

–  11’ tall

Base Units:

–  5’ High

–  3’ Wide

–  2.5’ deep

25

T

OWN O

f C

ARY

Investment: Communications Plans

– Goals, Objectives & Strategy

– Tactics

– Target Publics

– Spokespersons

– Key Messages & General

Facts

– Activities (Logos, Hotline,

Door hangers, Events, Video,

etc)

– Budget

– Timeline

26

(14)

T

OWN O

f C

ARY

Savings – Meter Reading

27

T

OWN O

f C

ARY

Savings - Meter Maintenance

(15)

T

OWN O

f C

ARY

Benefits - Worker Safety

29

1 Worker’s

Comp claim for

a trip and fall:

$40K

T

OWN O

f C

ARY

Green: Smaller Fleet, Less Fuel

30

(16)

T

OWN O

f C

ARY

Wise water use increases water supply reliability

which could delay or eliminate next WTP

expansion

_______________________________________________________________________________________________________________________________________________________

Expansion from

40 to 56 mgd

Benefit - Water Conservation

With conservation/reuse: just

under 50% chance no expansion

needed for buildout/2060

50% chance expansion

needed about 2032

31

T

OWN O

f C

ARY

Benefit - BIG

Data

Before…

After…

(17)

T

OWN O

f C

ARY

33

RNI – Raw Meter Data

Big Data – Can be Complex…

C

IS

Syst

em

-

N

avi

Li

ne

MDM – Processed Read Data

SAS –

Analytical

Tables

C

ust

ome

r

Po

rt

al

Transformational!!! Customer

Service Becomes Proactive*

*

Most not quantified for cost/benefit analysis

(18)

T

OWN O

f C

ARY

Aquastar Customer Service*

•  High Usage monitored

•  Continuous flow monitored

•  Highest quality billing

•  Customer Call center service

•  Same day customer starts and

stops

*  Most not quantified for cost/benefit analysis

35

T

OWN O

f C

ARY

What Did We Tell our

Customers?

•  Cary communications plans

– Strict rules

– Guidelines

– Timing

– Assistance from PIO

_______________________________________________________________________________________________________________________________________________________________

36

(19)

T

OWN O

f C

ARY

•  Communication Plan for the Project:

– Purpose

• Support installation and implementation

of system

– Goals

• Timely, accurate and complete

information

• Create and maintain positive opinions

Communication Plan Components

T

OWN O

f C

ARY

–  Objectives (Measurable)

•  Respond to 100% of inquiries within 1 business

day

•  Respond to service problems within 4 hours

•  Receive less than 1% “did not know”

•  Achieve a mean project satisfaction score of 7 or

higher on survey

•  No more than 8 negative letters published in

paper

•  No more than 8 negative comments about the

project at Council meetings

(20)

T

OWN O

f C

ARY

•  Tactics

– TV, internet, bill newsletter, speakers

bureau, direct mail, door hangers,

board meetings, brochures,

advertising etc.

•  Target Publics

– Customers, elected leaders, property

managers, utility companies,

surrounding jurisdictions, institutions

Communication Plan Components

T

OWN O

f C

ARY

•  Spokespersons

– NOT contractors

•  Key Messages

– Quality, innovative, town values

•  General Facts

– 35 details

(21)

T

OWN O

f C

ARY

•  Primary activities

– Name, logos, fact sheets, speeches,

newsletter plan, video plan, website,

envelope messages, special events,

letters, project hotline, door hangers,

contractor shirts, vehicle magnets, static

displays, advertising

•  Budget - $95,700

– Details

•  Timeline by month and day, staff – 18

months

Communication Plan Components

T

OWN O

f C

ARY

•  How do we communicate now that the

installation is over?

– Utility bill newsletter stories

•  Keep your meter box clear

– Seek awards for news release content

– Speak to people

– Council updates (snow)

– Call customers – Wait, WHAT?

(22)

T

OWN O

f C

ARY

43

•  Consumption

Report from

MDM (Meter

Data

Management

System)

•  Single Family

Residential

Customers with

usage over

1,000 gallons

per day

•  Broad Brush

Approach

Catching Leaks

T

OWN O

f C

ARY

44

•  Balance between being helpful and being a nuisance

•  “Best” way to contact customer

•  Minimize truck rolls

(23)

T

OWN O

f C

ARY

45

•  Front End

Catching Leaks

T

OWN O

f C

ARY

46

Tracking Results

(24)

Self Serve, PLEASE!

47

Customer

Webportal

(25)

Self Subscribed Email and Text Alerts

49

T

OWN O

f C

ARY

•  Same components

– Less intense

– Smaller scale

•  Budget - $6,500

•  Timeline – 4 months

(26)

51

0 20 40 60 80 100 120 140 160 09/14/13 09/15/13 09/16/13 09/17/13 09/18/13 09/19/13 09/20/13 09/21/13 09/22/13 09/23/13 09/24/13 09/25/13 09/26/13 09/27/13 09/28/13 09/29/13 09/30/13 10/01/13 10/02/13 10/03/13 10/04/13 10/05/13 10/06/13 10/07/13 10/08/13 10/09/13 10/10/13 10/1 1/13 10/12/13 10/13/13

Number of Alerts Sent Daily

Customer

Webportal Statistics

T

OWN O

f C

ARY

Timeline

•  2002 Consultant evaluation of AMI

•  2006 Consultant evaluation and AMI bid

•  2009 Council approval of project & approach

–  9 month contract development

•  2011 Meter installation kickoff

–  5 month network installation

•  2012 Meter installation final

–  15 month field work

•  2013 Web portal launch

–  12 month web development

52

(27)

T

OWN O

f C

ARY

Key Ingredients to Project Success

•  Through the lens of the customer

–  Custom Cary project

•  Extensive research and shared lessons from other

utilities

•  Shaped by our values for customer service, safety &

privacy

–  Comprehensive communication plan

•  Project identity

–  Defined target dates and timelines

–  Clear vision of success & definable

outcomes

•  Including customer satisfaction

53

T

OWN O

f C

ARY

Key Ingredients to Project Success

•  Through the lens of Council:

–  Support and commitment

•  Council

•  Management

•  Staff

–  Sufficient financial resources

–  Sufficient staff resources

–  Treated employees fairly

–  Partnership and involvement with vendors

–  Risk management through thorough

contracts

(28)

T

OWN O

f C

ARY

Investment: Staff Time & Stress

55

T

OWN O

f C

ARY

Investment: Commitment

Everything turns out fine in the end.

If it isn’t fine, it isn’t the end.

(29)

57

T

OWN O

f C

ARY

Questions?

Karen Mills, CPA

Finance Director

919-469-4110

References

Related documents

Many emerging markets, and the companies quoted on their stock exchanges, are exposed to the risks of political, social and religious instability, expropriation of assets

For each population, we calculated entry rate, excess entry rate, missed opportunities, the proportions of overestimation within different categories (i.e.,

by Meter Size and Service Line Size • (Customers Billed Quarterly) Any customer with a Fire Line connection • Purchased Water Adjustment Charge (Single rate per 1,000 gallons) •

lecturing, a faculty member will usually spend at least two hours in preparation and grading. Thus, a faculty member assigned to teach a 12 hour load will spend 36 hours a week on

The second stage moved from descriptive to thematic coding, focused on two overarching themes that emerged from the data: (1) the actions of participants as they became

Once central stem net wood volume has been estimated by a volume equation or other means, this value becomes the basis for central stem biomass estimates of both wood and bark.

[r]

HVDC/FACTS = High Voltage Direct Current/Flexible AC Transmission Systems MDM = Meter Data Management. Agility in